AirTrunk JHB1 ↗
Published Date unavailable · Retrieved 2026-09-11
Johor campus advertised at 150+ MW.
Malaysia / Site
JHB1
Johor campus advertised at 150+ MW.

Site / building photo
Property exterior: AirTrunk JHB1.
Published date unknown · Captured date unknown · Checked 2026-09-11
Selected from sources checked 2026-09-11 for identity and unobstructed property view; latest capture date cannot be established.
airtrunk.com · Source and attribution ↗Copyright/trademark belongs to the respective rights holder. Publicly available source; no open reuse license established. External reuse rights unconfirmed. Capture and original image publication dates not independently established; retrieval/upload dates are not capture dates.
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| ≥150 MW Unspecified power | Reported design capacity; energized and occupied load not established Planned · cumulative | 2026-09-11 | Reported claim ↗ Excluded from capacity totals. Research retrieval date, not a commissioning or measurement date. Design/full-build capacity is not evidence that all MW are commissioned. Excluded from sums pending capacity and hierarchy review. |
| >50 MW Unspecified power | First phase only; part of campus total Operational · cumulative | 2026-09-11 | Reported claim ↗ Excluded from capacity totals. Research retrieval date, not a commissioning or measurement date. Design/full-build capacity is not evidence that all MW are commissioned. Excluded from sums pending capacity and hierarchy review. |
Additional 100 MW expansion underway.
Supporting source ↗No additional specifications established.
Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-09-11
Johor campus advertised at 150+ MW.
Published 2024-07-30 · Retrieved 2026-09-11
First phase opened with more than 50 MW.
Published 2024-08-09 · Retrieved 2026-09-11
Additional 100 MW expansion underway.
Published Date unavailable · Retrieved 2026-09-11
Property exterior: AirTrunk JHB1. Image reference: https://airtrunk.com/wp-content/uploads/2023/01/JHB1-Hero-Image-Low-Res.jpg Visually inspected against the cited source and profile identity.
Published Date unavailable · Retrieved 2026-09-11
Operator logo from official site header. Original image: https://airtrunk.com/wp-content/uploads/2017/07/airtrunk-logo-horizontal-white-2.png
Name: AirTrunk JHB1
Operator: AirTrunk JHB1
Country: AirTrunk JHB1
Region: AirTrunk JHB1
Metro: AirTrunk JHB1
Kind: AirTrunk JHB1
Statuses: AirTrunk JHB1; AirTrunk JHB1 expansion
Summary: AirTrunk JHB1
Aliases: AirTrunk JHB1
Media: Property imagery · airtrunk.com
Operator Logo: AirTrunk · Official operator logo
Stable identifier: b1855895-7364-4e1b-a606-c8aa3a7507bb