AirTrunk JHB1

Unknown MWTotal facility power not establishedSee capacity evidence for reported claims.

JHB1

OperationalUnder Construction

Johor campus advertised at 150+ MW.

Last researched 2026-09-11Last verified Not independently verifiedPublished revision 2
Property exterior: AirTrunk JHB1.

Site / building photo

Property exterior: AirTrunk JHB1.

Published date unknown · Captured date unknown · Checked 2026-09-11

Selected from sources checked 2026-09-11 for identity and unobstructed property view; latest capture date cannot be established.

airtrunk.com · Source and attribution ↗
Image rights and date notes

Copyright/trademark belongs to the respective rights holder. Publicly available source; no open reuse license established. External reuse rights unconfirmed. Capture and original image publication dates not independently established; retrieval/upload dates are not capture dates.

Site profile

Operator
AirTrunk
Ownership
Unknown / not established
Business model / scale
Unknown / Unknown
Region / metro
Johor / Johor Bahru
City / locality
Unknown
Address
Unknown
Location
Property coordinates have not been verified.
Precision: unknown
Parent
Not assigned

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
≥150 MW
Unspecified power
Reported design capacity; energized and occupied load not established
Planned · cumulative
2026-09-11Reported claim ↗

Excluded from capacity totals. Research retrieval date, not a commissioning or measurement date. Design/full-build capacity is not evidence that all MW are commissioned. Excluded from sums pending capacity and hierarchy review.

>50 MW
Unspecified power
First phase only; part of campus total
Operational · cumulative
2026-09-11Reported claim ↗

Excluded from capacity totals. Research retrieval date, not a commissioning or measurement date. Design/full-build capacity is not evidence that all MW are commissioned. Excluded from sums pending capacity and hierarchy review.

Development timeline

  1. 2024-08-09 · actual

    Expansion underway

    Additional 100 MW expansion underway.

    Supporting source ↗

Disclosed specifications

No additional specifications established.

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

AirTrunk JHB1 ↗

Published Date unavailable · Retrieved 2026-09-11

Johor campus advertised at 150+ MW.

Property imagery · airtrunk.com ↗

Published Date unavailable · Retrieved 2026-09-11

Property exterior: AirTrunk JHB1. Image reference: https://airtrunk.com/wp-content/uploads/2023/01/JHB1-Hero-Image-Low-Res.jpg Visually inspected against the cited source and profile identity.

AirTrunk · Official operator logo ↗

Published Date unavailable · Retrieved 2026-09-11

Operator logo from official site header. Original image: https://airtrunk.com/wp-content/uploads/2017/07/airtrunk-logo-horizontal-white-2.png

Profile field evidence

Name: AirTrunk JHB1

Operator: AirTrunk JHB1

Country: AirTrunk JHB1

Region: AirTrunk JHB1

Metro: AirTrunk JHB1

Kind: AirTrunk JHB1

Statuses: AirTrunk JHB1; AirTrunk JHB1 expansion

Summary: AirTrunk JHB1

Aliases: AirTrunk JHB1

Media: Property imagery · airtrunk.com

Operator Logo: AirTrunk · Official operator logo

Stable identifier: b1855895-7364-4e1b-a606-c8aa3a7507bb