Digital Edge CGK campus — supporting evidence ↗
Published Date unavailable · Retrieved 2026-09-11
Operator lists GIIC CGK campus capacity at 500 MW with scalability to 1 GW.
Indonesia / Site
Campus design; electrical basis is not explicitly IT on the current page. Separate 2 x 725 MVA feeds are not converted to MW.
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| 500 MW Unspecified power | Reported design/development capacity; delivered share unconfirmed Planned · cumulative | 2026-09-11 | Reported claim ↗ Excluded from capacity totals. Research retrieval date, not measurement/commissioning date. Excluded from sums pending capacity and hierarchy reconciliation. Campus design; electrical basis is not explicitly IT on the current page. Separate 2 x 725 MVA feeds are not converted to MW. |
No additional specifications established.
Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-09-11
Operator lists GIIC CGK campus capacity at 500 MW with scalability to 1 GW.
Published Date unavailable · Retrieved 2026-09-11
Digital Edge operator brand mark. Image reference: https://www.digitaledgedc.com/wp-content/uploads/2024/06/navbar-logo.png Visually inspected against the cited source and profile identity.
Name: Digital Edge CGK campus — supporting evidence
Kind: Digital Edge CGK campus — supporting evidence
Country: Digital Edge CGK campus — supporting evidence
Region: Digital Edge CGK campus — supporting evidence
Metro: Digital Edge CGK campus — supporting evidence
Operator: Digital Edge CGK campus — supporting evidence
Statuses: Digital Edge CGK campus — supporting evidence
Summary: Digital Edge CGK campus — supporting evidence
Operator Logo: Operator logo · www.digitaledgedc.com
Stable identifier: b5baefd3-e7e9-4bff-8e61-5536663c97dd