Map
Sign in
← Explore registry

Latest actual RFS unconfirmed. Current English page separately advertises 14 MW without establishing the same power definition.

Last researched 2026-09-11Last verified Not independently verifiedPublished revision 2
Architectural rendering: NTT Bangkok 3.

Rendering

Architectural rendering: NTT Bangkok 3.

Published date unknown · Captured date unknown · Checked 2026-09-11

Selected from sources checked 2026-09-11 for identity and unobstructed property view; latest capture date cannot be established.

services.global.ntt · Source and attribution ↗
Image rights and date notes

Copyright/trademark belongs to the respective rights holder. Publicly available source; no open reuse license established. External reuse rights unconfirmed. Capture and original image publication dates not independently established; retrieval/upload dates are not capture dates.

Site profile

Operator
NTT DATA
Ownership
Unknown / not established
Business model / scale
Unknown / Unknown
Region / metro
Chon Buri / Chon Buri
City / locality
Chon Buri
Address
Amata City Chonburi Industrial Estate
Location
Property coordinates have not been verified.
Precision: unknown
Parent
Not assigned

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
12 MW
IT load
Reported design capacity; energized and occupied load not established
Unknown · cumulative
2026-09-11Reported claim ↗

Excluded from capacity totals. Research retrieval date, not a commissioning or measurement date. Design/full-build capacity is not evidence that all MW are commissioned. Excluded from sums pending capacity and hierarchy review. Latest actual RFS unconfirmed. Current English page separately advertises 14 MW without establishing the same power definition.

14 MW
Unspecified power
Current full-build power claim; definition differs or remains unclear
Planned · cumulative
2026-09-11Reported claim ↗

Excluded from capacity totals. Research retrieval date, not a commissioning or measurement date. Design/full-build capacity is not evidence that all MW are commissioned. Excluded from sums pending capacity and hierarchy review. Latest actual RFS unconfirmed. Current English page separately advertises 14 MW without establishing the same power definition.

Development timeline

  1. No dated milestones established.

Disclosed specifications

No additional specifications established.

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

Property imagery · services.global.ntt ↗

Published Date unavailable · Retrieved 2026-09-11

Architectural rendering: NTT Bangkok 3. Image reference: https://services.global.ntt/-/media/ntt/global/services-and-products/data-centers/global-locations/asia-pacific/bangkok-3-data-center/bankok-3-820x920.jpg?rev=4aff1ff923f544228273bbc9476205f7 Visually inspected against the cited source and profile identity.

Operator logo · www.nttdata.com ↗

Published Date unavailable · Retrieved 2026-09-11

NTT operator brand mark. Image reference: https://www.nttdata.com/global/en/-/media/assets/images/header_logo.svg?iar=0&rev=010dc1bd851f4d2aaaaf407cf338776b Visually inspected against the cited source and profile identity.

Profile field evidence

Name: NTT Bangkok 3 construction announcement

Operator: NTT Bangkok 3 construction announcement

Country: NTT Bangkok 3 construction announcement

Region: NTT Bangkok 3 construction announcement

Metro: NTT Bangkok 3 construction announcement

City: NTT Bangkok 3 construction announcement

Address: NTT Bangkok 3 construction announcement

Kind: NTT Bangkok 3 construction announcement

Statuses: NTT Bangkok 3 construction announcement

Summary: NTT Bangkok 3 construction announcement

Aliases: NTT Bangkok 3 construction announcement

Media: Property imagery · services.global.ntt

Operator Logo: Operator logo · www.nttdata.com

Stable identifier: b712521c-06b5-4ce6-9274-1f3e0b7f3923