Operational colocation and hyperscale campus formerly operated as Ficolo’s The Air. Verne acquired the Mittalinja property from Onvest in December 2024 and announced two additional buildings. Finnish-language expansion disclosure describes a planned campus capacity of 70 MW; current installed IT load is not established. The separate Mäntsälä development must not be merged with this campus.
Last researched 2026-10-07Last verified Not independently verifiedPublished revision 1
No approved site photo yet. Photos and their source dates are published after evidence review.
Site profile
Operator
Verne
Ownership
Verne; corporate owner Ardian
Business model / scale
Colocation / Hyperscale
Region / metro
Uusimaa / Helsinki metropolitan area
City / locality
Vantaa
Address
Mittalinja 1, FI-01260 Vantaa, Finland
Location
PeeringDB facility geocode for Verne Helsinki at Mittalinja 1, corroborated by operator and property-seller address evidence; marker position and parcel boundaries not independently verified. Precision: approximate · 60.303515, 25.101186 View location on map →
Parent
Not assigned
Location detail
PeeringDB facility geocode for Verne Helsinki at Mittalinja 1, corroborated by operator and property-seller address evidence; marker position and parcel boundaries not independently verified.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.
Mittalinja 1, FI-01260 Vantaa, Finland
Loading local map…
Capacity evidence
Statements retain their dates, definitions and development scope. Do not add these rows together.
Claim / measurement
Scope and status
As of
Evidence and accounting
70 MW Unspecified power
Vantaa campus including planned expansion Planned · cumulative
Excluded from capacity totals. As of dated announcement: Finnish wording explicitly describes expanding campus capacity to 70 MW. No IT/facility/grid basis disclosed; not evidence of presently commissioned 70 MW.
Excluded from capacity totals. As of retrieval of undated datasheet. Overall campus capacity is advertised without commissioned/planned split or electrical basis. Overlaps c1 and must not be added to it.
10 MW Unspecified power
Historical Helsinki/The Air capacity described in supplier interview Operational · cumulative
Excluded from capacity totals. As of retrieval only; undated interview describes opening in Q2 2020 and Helsinki capacity of 10 MW. Historical claim, not a 2026 commissioned-capacity measurement; IT/facility/grid basis unspecified.
50 MW Unspecified power
Historical The Air expansion potential Planned · cumulative
Excluded from capacity totals. As of retrieval only; historical interview describes growth potential to 50 MW. Differs from later 70 MW campus expansion disclosure, potentially reflecting changed plans or scope; no reconciliation established.
Development timeline
2020-Q2 · actual_opening_reported
The Air Phase 1 entered use
Supplier interview and partner account describe Q2 2020 opening/Phase 1 use; Sweco separately describes completion in 2021, potentially a different project milestone.
Tier III equivalent; ISO 27001:2022, ISO 9001:2015, ISO 14001:2015, ISO 45001:2018; PCI-DSS; Katakri; NVIDIA DGX authorised
Operator-listed claims. Tier equivalence is not evidence of Uptime Institute certification; certificate validity and coverage not independently checked.
Identifies Vantaa campus and Mittalinja 1; advertises overall campus capacity of 70 MW, 15,000 m² campus size, hyperscale and colocation services, and technical specifications. Publication date is not displayed.
Ficolo began operating under the Verne Global brand; identifies Helsinki as The Air. Its 23 MW available and 90 MW potential figures cover three Finnish sites collectively, not Vantaa alone.
Seller confirms Mittalinja 1 in Vantaa was sold to Verne at the end of December 2024, with an operating data center on an eight-hectare plot and room for expansion.
Finnish public-relations release explicitly describes expanding the Vantaa Helsinki data center to 70 MW, with two new buildings supporting liquid cooling; existing operations reuse heat through Vantaa district heating.
Operator confirms acquisition from Onvest, existing multinational customers and two planned buildings; wording refers to leveraging 70 MW capacity without establishing installed IT load.
Ardian confirms acquisition of Verne’s entire share capital from Digital 9 Infrastructure; this establishes corporate ownership, not a cadastral title holder.
Facility record lists Mittalinja 1, Vantaa, Uusimaa, Finland; geocode 60.303515, 25.101186 and identifier FI-HEL-DC01. Record displays last update 2025-09-26; coordinates are directory evidence.
Project designer identifies The Air in Vantaa, describing completion in 2021, adaptation of an industrial building, an added concrete section and a kinetic facade. Includes a facade image.
Supplier interview attributes 10 MW capacity and 50 MW expansion potential to Helsinki/The Air, states opening in Q2 2020 and describes 62U racks at 20–40 kW or more. Publication date was not established from displayed content.
Operator describes Vantaa expansion as a project underway, separately from the new Mäntsälä campus; does not establish a physical construction start or commissioned expansion capacity.