Australia / Site

MEL1 Melbourne · MEL1 Melbourne West · AirTrunk Melbourne

Operational

Operational AirTrunk hyperscale campus in western Melbourne, distinct from MEL2. Operator disclosures establish reported capacity above 5 MW, but 185+ MW and 276 MW+ campus claims have unresolved scope differences and do not establish actual electricity consumption or commissioned IT load.

Last researched 2026-10-09Last verified Not independently verifiedPublished revision 1
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
AirTrunk
Ownership
Unknown / not established
Business model / scale
Colocation / Hyperscale
Region / metro
Victoria / Melbourne
City / locality
Derrimut
Address
176 Swann Drive, Derrimut, Victoria, Australia
Location
PeeringDB facility geocode; street address corroborated by White Pages. Property marker and campus boundaries were not independently established through Maps or cadastral evidence.
Precision: approximate · -37.800397, 144.773648
View location on map →
Parent
Not assigned

Location detail

PeeringDB facility geocode; street address corroborated by White Pages. Property marker and campus boundaries were not independently established through Maps or cadastral evidence.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.

176 Swann Drive, Derrimut, Victoria, Australia

Loading local map…

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
≥276 MW
Unspecified power
MEL1 total campus capacity in Australian platform announcement
Planned · cumulative
2025-12-24Conflicting claim ↗

Excluded from capacity totals. Announcement date. Source states 276 MW+ in a platform/deployable-capacity context; installed versus future scope and power basis are not defined. Planned status conservatively represents unverified end-state capacity.

≥185 MW
Unspecified power
MEL1 multi-building campus total capacity
Unknown · cumulative
2026-10-09Conflicting claim ↗

Excluded from capacity totals. Retrieval date of undated facility page, not commissioning date. Source states 185+ MW; differs from December 2025 platform announcement.

185 MW
Unspecified power
MEL1 campus total after announced expansion
Planned · cumulative
2024-08-09Reported claim ↗

Excluded from capacity totals. Announcement date; total campus capacity alongside construction of remaining phases. Source does not explicitly label the total as IT load.

>100 MW
IT load
New IT load from remaining three of six MEL1 phases
Planned · incremental
2024-08-09Reported claim ↗

Excluded from capacity totals. Announcement date; construction expansion over the following 18 months was described. Completion was not established; overlaps the announced campus total.

≥20 MW
Unspecified power
Completed MEL1 expansion announced in May 2023
Operational · incremental
2023-05-22Reported claim ↗

Excluded from capacity totals. Completion announcement date; source states 20+ MW without identifying IT versus facility power. Included within campus capacity, not additive to later totals.

≥130 MW
Unspecified power
MEL1 scalable campus capacity described in 2023
Planned · cumulative
2023-05-22Reported claim ↗

Excluded from capacity totals. Announcement date; scalable to 130+ MW is an end-state statement, not then-operational load.

>50 MW
IT load
Original Melbourne campus fully completed design
Planned · cumulative
2017-11-16Reported claim ↗

Excluded from capacity totals. Opening announcement date; source explicitly qualifies capacity as eventual full completion. Historical design claim superseded by subsequent expansion disclosures.

Development timeline

  1. 2017-11-16 · actual_opening_announcement

    Melbourne facility opened

    Operator announced the opening of its second Asia-Pacific facility in western Melbourne.

    Supporting source ↗
  2. 2023-05-22 · actual_completion_announcement

    20+ MW expansion completed

    Operator reported another expansion completed in under 33 weeks.

    Supporting source ↗
  3. 2024-08-09 · planned_expansion_announcement

    Remaining campus phases announced

    Three remaining phases were to deliver over 100 MW of new IT load; completion was not verified.

    Supporting source ↗
  4. 2024-12-23 · actual_corporate_acquisition_announcement

    AirTrunk acquisition completed

    Blackstone-led consortium and CPP Investments completed the corporate acquisition; site title ownership remains unestablished.

    Supporting source ↗
  5. 2025-12-24 · announcement

    MEL1 identified separately from new MEL2

    Operator listed MEL1 at 276 MW+ while announcing a separate second Melbourne campus.

    Supporting source ↗

Disclosed specifications

Land area

8.8 hectares

Operator facility-page disclosure; extent relative to later expansions is unconfirmed.

Source ↗

Technical data hall area

32,000 m²

Disclosed area; commissioned portion is not stated.

Source ↗

Office and storage area

12,600 m²

Operator disclosure.

Source ↗

Data halls

34

Facility page count; relationship to later phases remains unclear.

Source ↗

Power feed

Diverse 66 kV high-voltage feed

Voltage does not establish grid capacity in MW.

Source ↗

Design PUE

1.15

Design target, not measured operating PUE.

Source ↗

Connectivity

Carrier neutral with multiple entry paths

Operator claim; carrier inventory not independently verified.

Source ↗

Security and hosting qualifications

Australian Government Certified Strategic hosting provider; designed for SCEC Zone 3 or higher

Operator wording; scope available on request. Facility certification documentation was not inspected.

Source ↗

Public hosting partner

Datacom dedicated onsite data halls

Operator confirms Datacom hosting and colocation at MEL1; end customers are not identified.

Source ↗

Corporate investors

Blackstone-led consortium, CPP Investments and Robin Khuda

Corporate ownership disclosure, not evidence of legal property ownership.

Source ↗

Renewable energy target

Match 100% of site electricity consumption with renewable energy by 2030

Corporate target; MEL1-specific achievement is unknown.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

MEL1 Melbourne ↗

Published Date unavailable · Retrieved 2026-10-09

Operator identifies a multi-building hyperscale campus in Melbourne West; lists 185+ MW capacity, land and data-hall areas, power feed, design PUE and security claims.

AirTrunk expands MEL1 to 185MW capacity ↗

Published 2024-08-09 · Retrieved 2026-10-09

Announces construction of the remaining three of six campus phases, delivering over 100 MW of new IT load, with 185 MW total campus capacity.

AirTrunk MEL1 — PeeringDB ↗

Published Date unavailable · Retrieved 2026-10-09

Facility record associates AirTrunk Operating Pty Ltd with 176 Swann Drive, Derrimut, VIC, AU and geocode -37.800397, 144.773648; postcode is 3030.

Australia — AirTrunk ↗

Published Date unavailable · Retrieved 2026-10-09

Operator lists MEL1 among Australian campuses and confirms Datacom provides hosting and colocation through dedicated onsite halls.

Our Investors ↗

Published Date unavailable · Retrieved 2026-10-09

Current investor page identifies Blackstone, CPP Investments and founder Robin Khuda in AirTrunk ownership.

MEL1 Annual Compliance Report — EPBC 2019/8417 ↗

Published Date unavailable · Retrieved 2026-10-09

Public January 2021 report, with a letter dated 21 January 2021, covers commercial development at 210 Swann Drive, Derrimut, Victoria, for AirTrunk; address relationship remains unresolved.

AirTrunk Media Centre ↗

Published Date unavailable · Retrieved 2026-10-09

Operator media kit links an original image explicitly labelled AirTrunk MEL1 – Melbourne West.

Clean Energy ↗

Published Date unavailable · Retrieved 2026-10-09

Corporate target aims to match site electricity consumption with renewable energy by 2030; does not establish MEL1’s current renewable share.

Profile field evidence

Name: MEL1 Melbourne; AirTrunk MEL1 — PeeringDB

Aliases: MEL1 Melbourne; AirTrunk expands MEL1 to 185MW capacity; AirTrunk opens Melbourne’s largest hyperscale data centre campus

Kind: MEL1 Melbourne; AirTrunk expands MEL1 to 185MW capacity

Country: AirTrunk opens Melbourne’s largest hyperscale data centre campus; AirTrunk MEL1 — PeeringDB

Region: AirTrunk opens Melbourne’s largest hyperscale data centre campus; Airtrunk Operating Pty Ltd. — White Pages

City: AirTrunk MEL1 — PeeringDB; Airtrunk Operating Pty Ltd. — White Pages

Metro: MEL1 Melbourne; AirTrunk opens Melbourne’s largest hyperscale data centre campus

Address: AirTrunk MEL1 — PeeringDB; Airtrunk Operating Pty Ltd. — White Pages

Operator: MEL1 Melbourne; AirTrunk MEL1 — PeeringDB; Australia — AirTrunk

Business Model: Australia — AirTrunk

Scale: MEL1 Melbourne

Statuses: AirTrunk MEL1 Melbourne 20+MW expansion completed; AirTrunk opens Melbourne’s largest hyperscale data centre campus; Australia — AirTrunk

Location: AirTrunk MEL1 — PeeringDB; Airtrunk Operating Pty Ltd. — White Pages

Summary: MEL1 Melbourne; AirTrunk expands Australian platform with a second hyperscale data centre campus in Melbourne; AirTrunk expands MEL1 to 185MW capacity; AirTrunk opens Melbourne’s largest hyperscale data centre campus

Stable identifier: bf518a16-f718-4943-bbdd-9a3217d9c436