MEL1 Melbourne ↗
Published Date unavailable · Retrieved 2026-10-09
Operator identifies a multi-building hyperscale campus in Melbourne West; lists 185+ MW capacity, land and data-hall areas, power feed, design PUE and security claims.
Australia / Site
MEL1 Melbourne · MEL1 Melbourne West · AirTrunk Melbourne
Operational AirTrunk hyperscale campus in western Melbourne, distinct from MEL2. Operator disclosures establish reported capacity above 5 MW, but 185+ MW and 276 MW+ campus claims have unresolved scope differences and do not establish actual electricity consumption or commissioned IT load.
PeeringDB facility geocode; street address corroborated by White Pages. Property marker and campus boundaries were not independently established through Maps or cadastral evidence.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.
Loading local map…
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| ≥276 MW Unspecified power | MEL1 total campus capacity in Australian platform announcement Planned · cumulative | 2025-12-24 | Conflicting claim ↗ Excluded from capacity totals. Announcement date. Source states 276 MW+ in a platform/deployable-capacity context; installed versus future scope and power basis are not defined. Planned status conservatively represents unverified end-state capacity. |
| ≥185 MW Unspecified power | MEL1 multi-building campus total capacity Unknown · cumulative | 2026-10-09 | Conflicting claim ↗ Excluded from capacity totals. Retrieval date of undated facility page, not commissioning date. Source states 185+ MW; differs from December 2025 platform announcement. |
| 185 MW Unspecified power | MEL1 campus total after announced expansion Planned · cumulative | 2024-08-09 | Reported claim ↗ Excluded from capacity totals. Announcement date; total campus capacity alongside construction of remaining phases. Source does not explicitly label the total as IT load. |
| >100 MW IT load | New IT load from remaining three of six MEL1 phases Planned · incremental | 2024-08-09 | Reported claim ↗ Excluded from capacity totals. Announcement date; construction expansion over the following 18 months was described. Completion was not established; overlaps the announced campus total. |
| ≥20 MW Unspecified power | Completed MEL1 expansion announced in May 2023 Operational · incremental | 2023-05-22 | Reported claim ↗ Excluded from capacity totals. Completion announcement date; source states 20+ MW without identifying IT versus facility power. Included within campus capacity, not additive to later totals. |
| ≥130 MW Unspecified power | MEL1 scalable campus capacity described in 2023 Planned · cumulative | 2023-05-22 | Reported claim ↗ Excluded from capacity totals. Announcement date; scalable to 130+ MW is an end-state statement, not then-operational load. |
| >50 MW IT load | Original Melbourne campus fully completed design Planned · cumulative | 2017-11-16 | Reported claim ↗ Excluded from capacity totals. Opening announcement date; source explicitly qualifies capacity as eventual full completion. Historical design claim superseded by subsequent expansion disclosures. |
Operator announced the opening of its second Asia-Pacific facility in western Melbourne.
Supporting source ↗Operator reported another expansion completed in under 33 weeks.
Supporting source ↗Three remaining phases were to deliver over 100 MW of new IT load; completion was not verified.
Supporting source ↗Blackstone-led consortium and CPP Investments completed the corporate acquisition; site title ownership remains unestablished.
Supporting source ↗Operator listed MEL1 at 276 MW+ while announcing a separate second Melbourne campus.
Supporting source ↗Operator facility-page disclosure; extent relative to later expansions is unconfirmed.
Source ↗Operator claim; carrier inventory not independently verified.
Source ↗Operator wording; scope available on request. Facility certification documentation was not inspected.
Source ↗Operator confirms Datacom hosting and colocation at MEL1; end customers are not identified.
Source ↗Corporate ownership disclosure, not evidence of legal property ownership.
Source ↗Corporate target; MEL1-specific achievement is unknown.
Source ↗Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-10-09
Operator identifies a multi-building hyperscale campus in Melbourne West; lists 185+ MW capacity, land and data-hall areas, power feed, design PUE and security claims.
Published 2025-12-24 · Retrieved 2026-10-09
Separately identifies existing MEL1 at 276 MW+ and newly announced MEL2; describes Melbourne capacity in deployable terms.
Published 2024-08-09 · Retrieved 2026-10-09
Announces construction of the remaining three of six campus phases, delivering over 100 MW of new IT load, with 185 MW total campus capacity.
Published 2023-05-22 · Retrieved 2026-10-09
Reports completion of another 20+ MW expansion and scalability to 130+ MW; does not identify the expansion power basis.
Published 2017-11-16 · Retrieved 2026-10-09
Contemporaneous opening announcement places the facility in western Melbourne, Victoria, Australia, and describes eventual capacity above 50 MW of IT load.
Published Date unavailable · Retrieved 2026-10-09
Facility record associates AirTrunk Operating Pty Ltd with 176 Swann Drive, Derrimut, VIC, AU and geocode -37.800397, 144.773648; postcode is 3030.
Published Date unavailable · Retrieved 2026-10-09
Business directory corroborates 176 Swann Drive, Derrimut, Victoria, but reports postcode 3026.
Published Date unavailable · Retrieved 2026-10-09
Operator lists MEL1 among Australian campuses and confirms Datacom provides hosting and colocation through dedicated onsite halls.
Published 2024-12-23 · Retrieved 2026-10-09
Reports completed corporate acquisition by a Blackstone-led consortium alongside CPP Investments; does not establish the legal owner of MEL1 real estate.
Published Date unavailable · Retrieved 2026-10-09
Current investor page identifies Blackstone, CPP Investments and founder Robin Khuda in AirTrunk ownership.
Published Date unavailable · Retrieved 2026-10-09
Public January 2021 report, with a letter dated 21 January 2021, covers commercial development at 210 Swann Drive, Derrimut, Victoria, for AirTrunk; address relationship remains unresolved.
Published Date unavailable · Retrieved 2026-10-09
Operator media kit links an original image explicitly labelled AirTrunk MEL1 – Melbourne West.
Published Date unavailable · Retrieved 2026-10-09
Corporate target aims to match site electricity consumption with renewable energy by 2030; does not establish MEL1’s current renewable share.
Name: MEL1 Melbourne; AirTrunk MEL1 — PeeringDB
Aliases: MEL1 Melbourne; AirTrunk expands MEL1 to 185MW capacity; AirTrunk opens Melbourne’s largest hyperscale data centre campus
Kind: MEL1 Melbourne; AirTrunk expands MEL1 to 185MW capacity
Country: AirTrunk opens Melbourne’s largest hyperscale data centre campus; AirTrunk MEL1 — PeeringDB
Region: AirTrunk opens Melbourne’s largest hyperscale data centre campus; Airtrunk Operating Pty Ltd. — White Pages
City: AirTrunk MEL1 — PeeringDB; Airtrunk Operating Pty Ltd. — White Pages
Metro: MEL1 Melbourne; AirTrunk opens Melbourne’s largest hyperscale data centre campus
Address: AirTrunk MEL1 — PeeringDB; Airtrunk Operating Pty Ltd. — White Pages
Operator: MEL1 Melbourne; AirTrunk MEL1 — PeeringDB; Australia — AirTrunk
Business Model: Australia — AirTrunk
Scale: MEL1 Melbourne
Statuses: AirTrunk MEL1 Melbourne 20+MW expansion completed; AirTrunk opens Melbourne’s largest hyperscale data centre campus; Australia — AirTrunk
Location: AirTrunk MEL1 — PeeringDB; Airtrunk Operating Pty Ltd. — White Pages
Summary: MEL1 Melbourne; AirTrunk expands Australian platform with a second hyperscale data centre campus in Melbourne; AirTrunk expands MEL1 to 185MW capacity; AirTrunk opens Melbourne’s largest hyperscale data centre campus
Stable identifier: bf518a16-f718-4943-bbdd-9a3217d9c436