NEXTDC B2 Brisbane

Unknown MWTotal facility power not establishedSee capacity evidence for reported claims.

B2 Brisbane · B2 Fortitude Valley · NEXTDC B2

OperationalUnder ConstructionPlanned

Operational Brisbane colocation facility with an ongoing Stage 2 extension. FY26 disclosures distinguish 6 MW built capacity, 2 MW in progress and 12 MW total planned capacity.

Last researched 2026-10-09Last verified Not independently verifiedPublished revision 1
B2 Brisbane exterior street view, linked from the operator's facility gallery; capture date unknown.

Site / building photo

B2 Brisbane exterior street view, linked from the operator's facility gallery; capture date unknown.

Published date unknown · Captured date unknown · Checked 2026-10-09

Research-selected property image; reviewer must confirm site identity, suitability and rights before publication.

www.nextdc.com · Source and attribution ↗
Image rights and date notes

Published by NEXTDC; photographer and reuse licence not established. Permission review required before import. Publication and capture dates were not independently established.

Site profile

Operator
NEXTDC
Ownership
Unknown / not established
Business model / scale
Colocation / Unknown
Region / metro
Queensland / Brisbane
City / locality
Brisbane
Address
454 St Pauls Terrace, Fortitude Valley QLD 4006, Australia
Location
Address destination marker encoded in NEXTDC's published Google Maps directions link; corroborated against its facility address. Listing and parcel position could not be visually inspected; not surveyed.
Precision: approximate · -27.4539022, 153.0332005
View location on map →
Parent
Not assigned

Location detail

Address destination marker encoded in NEXTDC's published Google Maps directions link; corroborated against its facility address. Listing and parcel position could not be visually inspected; not surveyed.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.

454 St Pauls Terrace, Fortitude Valley QLD 4006, Australia

Loading local map…

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
6 MW
IT load
B2 fitted-out built capacity
Operational · cumulative
2026-08-27Reported claim ↗

Excluded from capacity totals. As_of is presentation publication date, covering FY26. Built means designed power capacity of fitted-out halls; not measured consumption or proof all customer infrastructure is commissioned.

2 MW
IT load
B2 expansion capacity in progress
Under Construction · incremental
2026-08-27Reported claim ↗

Excluded from capacity totals. As_of is presentation publication date. Reported separately from 6 MW built and included within ultimate development; do not add to 12 MW planned.

12 MW
IT load
B2 ultimate whole-facility capacity
Planned · cumulative
2026-08-27Reported claim ↗

Excluded from capacity totals. As_of is presentation publication date. Called total power planned in this disclosure; IT basis corroborated by operator brochure and contractor. Includes existing and expansion capacity, not 12 MW commissioned.

Development timeline

  1. 2016-05 · actual

    B2 property acquired

    Operator history records acquisition of properties for B2 and M2.

    Supporting source ↗
  2. 2017-09 · actual

    B2 opened

    Operator history records opening of B2 in Brisbane.

    Supporting source ↗
  3. 1H FY27 · planned

    Historical Stage 2 completion target

    FY25 presentation targeted Stage 2 practical completion in 1H FY27; actual completion remains unestablished.

    Supporting source ↗
  4. 2026-08-27 · announcement

    Expansion remains in progress

    FY26 presentation reports an operational facility with 2 MW under construction.

    Supporting source ↗

Disclosed specifications

Technical space

6,000 m²

Advertised technical space; not land area or total gross building area.

Source ↗

Rack capacity

1,270

Advertised capacity, not occupied rack count.

Source ↗

Data halls / interconnect rooms

2 / 3

Brochure configuration; expansion contractor separately describes a new hall.

Source ↗

Stage 2 new data hall

1,400 m²

Contractor-disclosed extension scope; avoid adding this to advertised technical space without reconciliation.

Source ↗

Cooling

Hot aisle containment; indirect free-cooling CRACs; modular cooling towers; N+1 systems

Operator disclosure; minimum 24 hours of water stored on site.

Source ↗

PUE

1.34 yearly average / 1.25 yearly lowest

Operator-advertised figures dependent on load and conditions; no dated independent measurement established.

Source ↗

Tier certification

Uptime Institute Tier IV design and constructed facility

Operator and original contractor claim; current independent registry check not completed.

Source ↗

Connectivity

AWS and Google direct cloud PoPs; AXON interconnection

Connectivity offerings do not establish either cloud provider as a tenant.

Source ↗

Public business contact

NEXTDC contact page

Public sales and support route; no forms submitted.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

B2 Brisbane Data Centre — NEXTDC ↗

Published Date unavailable · Retrieved 2026-10-09

Operator identifies B2 in Fortitude Valley, lists IT capacity, technical space and racks, and describes cloud connectivity and cooling.

Contact NEXTDC ↗

Published Date unavailable · Retrieved 2026-10-09

B2 Brisbane address is 454 St Pauls Terrace, Fortitude Valley QLD 4006; publishes a Google Maps directions link.

NEXTDC FY26 Results Presentation ↗

Published 2026-08-27 · Retrieved 2026-10-09

Pages 18 and 30 report B2 operational, 6 MW built, 2 MW under construction and 12 MW total planned. Built capacity means designed power capacity of fitted-out halls.

NEXTDC B2 Brisbane Stage 2 — Multiplex ↗

Published Date unavailable · Retrieved 2026-10-09

Contractor describes an extension to the existing facility, doubling long-term IT capacity from 6 MW to 12 MW, including a new 1,400 m² hall.

Our History — NEXTDC ↗

Published Date unavailable · Retrieved 2026-10-09

Records property acquisition for B2 and M2 in May 2016 and B2 opening in September 2017.

NEXTDC B2 — FDC ↗

Published Date unavailable · Retrieved 2026-10-09

Original contractor identifies the address, conversion of a bank building and Tier IV design and constructed-facility certification.

Google Maps directions destination published by NEXTDC ↗

Published Date unavailable · Retrieved 2026-10-09

Operator-linked address destination encodes marker coordinates -27.4539022,153.0332005, separately from its viewport centre. Accessible response does not expose listing details or photos.

NEXTDC FY26 Annual Report & Appendix 4E ↗

Published Date unavailable · Retrieved 2026-10-09

Australian portfolio groups B2 under Brisbane; describes ongoing extension capacity built to NVIDIA-certified AI Factory standards.

NEXTDC FY25 Results Presentation ↗

Published Date unavailable · Retrieved 2026-10-09

Stage 2 practical completion was targeted for 1H FY27; this is a historical forecast, not evidence of completion.

Property photo · www.nextdc.com ↗

Published Date unavailable · Retrieved 2026-10-09

B2 Brisbane exterior street view, linked from the operator's facility gallery; capture date unknown. Original image: https://www.nextdc.com/hubfs/Imported%20sitepage%20images/B2%20Gold%20News%20-%202-1-1.jpg

Profile field evidence

Name: B2 Brisbane Data Centre — NEXTDC; Contact NEXTDC

Aliases: B2 Brisbane Data Centre — NEXTDC; Contact NEXTDC; NEXTDC B2 — FDC

Kind: B2 Brisbane Data Centre — NEXTDC; NEXTDC B2 Brisbane Stage 2 — Multiplex

Country: NEXTDC FY26 Annual Report & Appendix 4E

Region: Contact NEXTDC; Brisbane Data Centres — Technical Specifications

City: B2 Brisbane Data Centre — NEXTDC; NEXTDC FY26 Annual Report & Appendix 4E

Metro: B2 Brisbane Data Centre — NEXTDC; NEXTDC FY26 Annual Report & Appendix 4E

Address: Contact NEXTDC; Brisbane Data Centres — Technical Specifications

Operator: B2 Brisbane Data Centre — NEXTDC; NEXTDC FY26 Annual Report & Appendix 4E

Business Model: B2 Brisbane Data Centre — NEXTDC; Brisbane Data Centres — Technical Specifications

Statuses: NEXTDC FY26 Results Presentation; NEXTDC B2 Brisbane Stage 2 — Multiplex

Summary: NEXTDC FY26 Results Presentation; NEXTDC B2 Brisbane Stage 2 — Multiplex

Location: Contact NEXTDC; Google Maps directions destination published by NEXTDC

Media: Property photo · www.nextdc.com

Stable identifier: bf9e68b7-9f04-478e-bd30-f338a8a735ae