← Bridge Data Centres MY01–MY02 campusPublished history
Restoring content creates a new revision. Previous revisions remain in the audit trail.
Revision 3 · Current
2026-09-11 12:15 UTC
Published profile snapshot
Bridge Data Centres MY01–MY02 campus · Malaysia · Bridge Data Centres
Combined five-building campus reported by operator. DCM separately lists MY01 at 5 MW and MY02 at 15 MW; those individual/older figures must not be added to 98 MW.
Capacity statements: 1 · Sources: 5
98 MW (exact) · it · Advertised full-build/design capacity; commissioned share unconfirmed · 2026-09-11
Revision 2
2026-09-11 11:26 UTC
Published profile snapshot
Bridge Data Centres MY01–MY02 campus · Malaysia · Bridge Data Centres
Combined five-building campus reported by operator. DCM separately lists MY01 at 5 MW and MY02 at 15 MW; those individual/older figures must not be added to 98 MW.
Capacity statements: 1 · Sources: 3
98 MW (exact) · it · Advertised full-build/design capacity; commissioned share unconfirmed · 2026-09-11
Revision 1
2026-09-11 09:58 UTC
Published profile snapshot
Bridge Data Centres MY01–MY02 campus · Malaysia · Bridge Data Centres
Combined five-building campus reported by operator. DCM separately lists MY01 at 5 MW and MY02 at 15 MW; those individual/older figures must not be added to 98 MW.
Capacity statements: 1 · Sources: 2
98 MW (exact) · it · Advertised full-build/design capacity; commissioned share unconfirmed · 2026-09-11