Map
Sign in
← Explore registry

Australia / Site

CDC Eastern Creek Campus

Unknown MWTotal facility power not establishedSee capacity evidence for reported claims.

Eastern Creek Campus

Operational

CDC's Eastern Creek campus in western Sydney comprises six operational data centres according to the current operator page, which reports over 200 MW of capacity without identifying the power basis. The campus is distinct from Marsden Park and neighboring Project Atlas. Historical operating, expansion and design figures overlap and must not be added.

Last researched 2026-10-09Last verified Not independently verifiedPublished revision 1
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
CDC Data Centres
Ownership
CDC
Business model / scale
Colocation / Unknown
Region / metro
New South Wales / Sydney
City / locality
Eastern Creek
Address
17 Roberts Road, Eastern Creek, NSW 2766, Australia
Location
Campus locator represented by the OpenStreetMap-derived EC1 building point published by Mapcarta. Roberts Road address corroborated by government consent; this is not a surveyed campus centroid or verified Google Maps marker.
Precision: approximate · -33.818, 150.83948
View location on map →
Parent
Not assigned

Location detail

Campus locator represented by the OpenStreetMap-derived EC1 building point published by Mapcarta. Roberts Road address corroborated by government consent; this is not a surveyed campus centroid or verified Google Maps marker.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.

17 Roberts Road, Eastern Creek, NSW 2766, Australia

Loading local map…

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
>200 MW
Unspecified power
Eastern Creek campus; six operational data centres
Operational · cumulative
2026-10-09Reported claim ↗

Excluded from capacity totals. As-of is retrieval date of undated current operator page. Capacity basis and commissioned versus installed distinction are not stated.

123 MW
Unspecified power
Eastern Creek EC1–EC4 combined
Operational · cumulative
2022-12-06Reported claim ↗

Excluded from capacity totals. As-of is unveiling date described in the article; historical CEO-reported combined capacity, overlapping current campus claim.

108 MW
Unspecified power
Two additional Eastern Creek data centres
Planned · incremental
2022-12-06Reported claim ↗

Excluded from capacity totals. As-of is unveiling date. Construction was planned for 2023; article does not explicitly identify IT or facility basis. Historical proposal overlaps subsequent campus figures.

≥280 MW
Unspecified power
Eastern Creek complete-campus design capacity
Planned · cumulative
2026-10-09Reported claim ↗

Excluded from capacity totals. As-of is retrieval date, not claim publication date: presentation is dated September 2025 with no day established. Displays 280MW+ and defines total built capacity based on current campus design; EC5/6 were then nearing completion. Not established as live IT load.

19 MW
Unspecified power
Acquired Eastern Creek property, near-term expansion potential
Planned · cumulative
2018-12-14Reported claim ↗

Excluded from capacity totals. As-of is acquisition announcement date. Historical expansion potential, not actual delivered load, overlapping later campus claims.

Development timeline

  1. 2018-12-14 · announcement

    Acquisition from DXC Technology announced

    Infratil announced CDC's acquisition of the Eastern Creek facility and associated expansion land.

    Supporting source ↗
  2. 2019 · actual

    EC2 fitout completed

    Completion recorded in CDC's historical timeline.

    Supporting source ↗
  3. 2020 · actual

    EC3 completed

    Completion recorded in CDC's historical timeline; precise operational commencement was not established.

    Supporting source ↗
  4. 2020-07-14 · actual approval

    Roberts Road expansion approved

    SSD-10330 approved for expansion of the existing data centre.

    Supporting source ↗
  5. 2022-12-06 · actual unveiling

    Expanded Eastern Creek campus unveiled

    Four-centre campus unveiled; additional two-centre expansion announced.

    Supporting source ↗
  6. 2024-04-17 · actual approval

    Buildings 5 and 6 modification approved

    Consolidated consent records changes to buildings 5 and 6.

    Supporting source ↗
  7. 2025-09 · announcement

    EC5/6 nearing completion

    Investor presentation described EC5 nearing completion, with EC6 to follow shortly; no exact commissioning date supplied.

    Supporting source ↗
  8. 2026-03-06 · actual approval

    Generator and storage modification approved

    Consent modification changes backup generator configuration and diesel storage.

    Supporting source ↗

Disclosed specifications

Operational data centres

6

Current operator statement; campus-level count, not six additional site records.

Source ↗

Historical acquired land area

Approximately 145,000 m²

Acquisition announcement figure; current cadastral area was not independently measured.

Source ↗

Planning land identifier

Lot 2 DP 1159804

Site identifier in SSD-10330 consolidated consent.

Source ↗

Public connectivity disclosures

Vocus, CDC and MegaIX Sydney

PeeringDB campus record; completeness and building-specific availability are unverified.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

Sydney | CDC Data Centres ↗

Published Date unavailable · Retrieved 2026-10-09

Operator identifies Eastern Creek as its first Sydney-region campus, states six operational data centres and over 200 MW capacity. Regional cooling and security statements are not separately quantified for this campus.

Roberts Road Data Centre | NSW Planning Portal ↗

Published Date unavailable · Retrieved 2026-10-09

SSD-10330 concerns expansion of an existing data centre in Blacktown; approval dated 14 July 2020. Portal lists subsequent modifications, including high-voltage plant modification.

Roberts Road Data Centre SSD-10330 — Consolidated Consent ↗

Published Date unavailable · Retrieved 2026-10-09

Schedule 1 identifies Canberra Data Centres Pty Ltd, 17 Roberts Road, Eastern Creek, Lot 2 DP 1159804. Modification table records building 5/6 changes on 17 April 2024 and generator/storage changes on 6 March 2026.

CDC — Infratil Investor Day, September 2025 ↗

Published Date unavailable · Retrieved 2026-10-09

Presentation explicitly dated September 2025. Page 7 assigns Eastern Creek 280 MW+ total built capacity based on current campus design and describes EC5/6 nearing completion. Portfolio diagram states 100% asset ownership.

CDC Eastern Creek Campus EC1 — Mapcarta ↗

Published Date unavailable · Retrieved 2026-10-09

OpenStreetMap-derived EC1 building record gives 17 Roberts Road, NSW 2766, Australia and coordinates -33.818, 150.83948; identifies nearby campus buildings separately.

CDC Eastern Creek Campus — PeeringDB ↗

Published Date unavailable · Retrieved 2026-10-09

Campus record identifies CDC, Eastern Creek, Australia and linked EC1–EC4 facility records. Lists Vocus, CDC and MegaIX Sydney connectivity; these are directory disclosures rather than a complete circuit inventory.

About CDC Data Centres ↗

Published Date unavailable · Retrieved 2026-10-09

Operator history records Eastern Creek acquisition in 2018, EC2 fitout completion in 2019, EC3 completion in 2020 and EC4 construction in 2021.

CDC Data Centre Services ↗

Published Date unavailable · Retrieved 2026-10-09

Describes customer ICT footprints, rack deployment and operation services across CDC campuses; supports classification as third-party colocation provision, by inference.

Profile field evidence

Name: Sydney | CDC Data Centres; CDC Eastern Creek Campus — PeeringDB

Aliases: Sydney | CDC Data Centres

Kind: Sydney | CDC Data Centres; CDC Eastern Creek Campus — PeeringDB

Country: CDC Eastern Creek Campus EC1 — Mapcarta; CDC Eastern Creek Campus — PeeringDB

Region: CDC — Infratil Investor Day, September 2025; CDC Eastern Creek Campus EC1 — Mapcarta

City: Roberts Road Data Centre SSD-10330 — Consolidated Consent; CDC Eastern Creek Campus — PeeringDB

Metro: Sydney | CDC Data Centres; CDC — Infratil Investor Day, September 2025

Address: Roberts Road Data Centre SSD-10330 — Consolidated Consent; CDC Eastern Creek Campus EC1 — Mapcarta

Operator: Sydney | CDC Data Centres; CDC Eastern Creek Campus — PeeringDB

Owner: CDC — Infratil Investor Day, September 2025; Infratil: CDC acquires data centre facility in Sydney, NSW — syndicated announcement

Business Model: CDC Data Centre Services; Infratil: CDC acquires data centre facility in Sydney, NSW — syndicated announcement

Statuses: Sydney | CDC Data Centres

Summary: Sydney | CDC Data Centres; CDC officially opens $1.5B Eastern Creek data centre — ARN; CDC — Infratil Investor Day, September 2025

Location: Roberts Road Data Centre SSD-10330 — Consolidated Consent; CDC Eastern Creek Campus EC1 — Mapcarta

Stable identifier: c9ea9a60-2d03-4ee9-b472-e73891888fbd