Unknown MWTotal facility power not establishedSee capacity evidence for reported claims.

M3 Melbourne · M3 Melbourne Data Centre

OperationalUnder ConstructionPlanned

NEXTDC hyperscale colocation campus in West Footscray, Melbourne. Existing operations coexist with construction and planned expansion. The current facility page advertises 225 MW IT capacity, while an April 2026 investor presentation distinguishes 40 MW built capacity from 185 MW in progress. These figures are not independently verified operational load.

Last researched 2026-10-09Last verified Not independently verifiedPublished revision 1
M3 Melbourne front-of-building exterior, identified in NEXTDC's official facility gallery.

Site / building photo

M3 Melbourne front-of-building exterior, identified in NEXTDC's official facility gallery.

Published date unknown · Captured date unknown · Checked 2026-10-09

Research-selected property image; reviewer must confirm site identity, suitability and rights before publication.

www.nextdc.com · Source and attribution ↗
Image rights and date notes

Published by NEXTDC; no reuse licence or photographer attribution established. Permission review required before import or republication. Capture date unknown. Publication and capture dates were not independently established.

Site profile

Operator
NEXTDC Limited
Ownership
Unknown / not established
Business model / scale
Colocation / Hyperscale
Region / metro
Victoria / Melbourne
City / locality
West Footscray
Address
25 Indwe Street, West Footscray VIC 3012, Australia
Location
Operator-established street address; no corroborated property point obtained.
Precision: unknown
Parent
Not assigned

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
225 MW
IT load
Advertised overall M3 campus capacity
Planned · cumulative
2026-10-09Reported claim ↗

Excluded from capacity totals. As-of is retrieval date of undated current facility page. Operational campus does not imply full advertised capacity commissioned; planned scope supported by investor disclosure.

≈150 MW
IT load
Historical M3 full-fitout target
Planned · cumulative
2022-10-20Reported claim ↗

Excluded from capacity totals. As-of uses release dateline; page header is October 19. Critical capacity target announced alongside opening, not installed load.

27 MW
Unspecified power
Completed Stage 1 design capacity
Operational · incremental
2026-10-09Reported claim ↗

Excluded from capacity totals. As-of is retrieval of undated builder page; completion dated September 2022. Builder does not explicitly identify power basis or actual customer load.

40 MW
Unspecified power
M3 built capacity
Operational · cumulative
2026-04-20Reported claim ↗

Excluded from capacity totals. As-of is presentation date. Built capacity is not measured operational IT consumption; table does not explicitly label basis.

185 MW
Unspecified power
M3 capacity in progress
Under Construction · incremental
2026-04-20Reported claim ↗

Excluded from capacity totals. As-of is presentation date. Presentation identifies M3 development and 185 MW in progress; overlaps campus total and must not be summed with other campus claims.

≈225 MW
Unspecified power
M3 total power planned
Planned · cumulative
2026-04-20Reported claim ↗

Excluded from capacity totals. As-of is presentation date; reported total includes built and in-progress portions. Power basis not explicit in table.

Development timeline

  1. 2021-08-12 · announcement

    Planning consent and adjoining land acquisition announced

    NEXTDC announced consent for initial development and another 40,000 square metres of adjoining land, whose development remained subject to consent.

    Supporting source ↗
  2. 2022-09 · actual_completion

    Stage 1 completed

    Builder reports completion of Stage 1 in September 2022.

    Supporting source ↗
  3. 2022-10-20 · actual_opening

    M3 officially opened

    Operator opening release uses October 20 dateline; webpage publication header is October 19.

    Supporting source ↗
  4. 2025-07 · actual_construction_update

    Stages 2 and 4 under construction

    Builder reports Stage 2 nearing top-out and cranes across expansion works.

    Supporting source ↗
  5. 2026-02-17 · actual_application

    Expansion planning application received

    Government register records PA2604231 for staged campus expansion; decision not displayed.

    Supporting source ↗
  6. 2026-Q1 · reported_actual_launch

    Sharon AI B200 cluster launch

    Tenant presentation reports launch of 1,000 B200 GPU cluster with Lenovo and VAST Data at M3.

    Supporting source ↗

Disclosed specifications

Technical space

41,000 m²

Advertised campus specification; facility introduction says more than 41,000 m². Installed extent not established.

Source ↗

Rack capacity

23,000

Advertised capacity, not occupied rack count.

Source ↗

Campus land area

More than 100,000 m²

Operator opening announcement; distinct from technical floor area.

Source ↗

Stage 1 building

15,986 m² GFA; four levels; six data halls

Builder-disclosed completed Stage 1 configuration.

Source ↗

Cooling

Prefabricated chiller modules

Builder describes installation in April 2022; does not establish whole-campus current cooling configuration.

Source ↗

Target PUE

1.25

2022 operator design target; not a measured current result.

Source ↗

Connectivity

Direct interconnection with M1 and M2; four diverse carrier access points

Operator-disclosed connectivity, not physical campus parentage.

Source ↗

Certification claims

Tier IV; Tier IV Gold Operational Sustainability; ISO, SOC and PCI-DSS controls

Current operator claims; individual certificates and scopes were not independently validated.

Source ↗

Public tenant

Sharon AI

Tenant reports B200 GPU cluster launch at M3; wider NEXTDC capacity agreements are not assigned wholly to this site.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

M3 Melbourne Data Centre ↗

Published Date unavailable · Retrieved 2026-10-09

Operator identifies West Footscray campus with 225 MW IT capacity, 41,000 square metres technical space, 23,000 rack capacity and Tier IV certification claims.

M3 expansion planning application PA2604231 ↗

Published Date unavailable · Retrieved 2026-10-09

Government register describes approved and partly operational M3 campus and planned expansion; application received February 17, 2026, public notice March 11. Expansion land includes 1, 11-13 and 15 Paramount Road and 39 Indwe Street.

NEXTDC M3 Data Centre Portfolio ↗

Published Date unavailable · Retrieved 2026-10-09

Builder reports Stage 1 completed September 2022: 27 MW, six data halls, four levels and 15,986 square metres GFA; NEXTDC client and HDR architect.

Project Update: M3 Stage 2 and 4 ↗

Published Date unavailable · Retrieved 2026-10-09

Article displays July 2025; builder describes Stage 2 and Stage 4 works, six tower cranes and Stage 2 nearing top-out.

ASX Release: 1H26 Record Results ↗

Published 2026-02-25 · Retrieved 2026-10-09

Page dated February 25 contains announcement dated February 26; total planned M3 capacity upgraded from 200 to 225 MW and 185 MW progressed at December 31, 2025.

NEXTDC M3 – Pre-fab Chiller Modules ↗

Published Date unavailable · Retrieved 2026-10-09

Article displays April 2022 and describes prefabricated chiller modules installed for M3 data-hall cooling with acoustic requirements for neighbouring residents.

M3 Melbourne Post Launch ↗

Published Date unavailable · Retrieved 2026-10-09

Operator says campus will be developed to 225 MW but the same page retains a 150 MW target IT-load panel; supports colocation business and open status.

Property photo · www.nextdc.com ↗

Published Date unavailable · Retrieved 2026-10-09

M3 Melbourne front-of-building exterior, identified in NEXTDC's official facility gallery. Original image: https://www.nextdc.com/hubfs/Data%20centre%20images/M3%20Melbourne/M3-cpm_kapitol_032-resized.jpg

Profile field evidence

Name: M3 Melbourne Data Centre; Melbourne Data Centre | AI Factories & Colocation

Aliases: M3 Melbourne Data Centre; M3 Melbourne Post Launch

Kind: M3 expansion planning application PA2604231; Record Contracted Utilisation and A$2.2bn Capital Plan

Country: NEXTDC opens $1.5b next generation sovereign data centre in Melbourne

Region: Melbourne Data Centre | AI Factories & Colocation; NEXTDC M3 Data Centre Portfolio

City: M3 Melbourne Data Centre; Melbourne Data Centre | AI Factories & Colocation

Metro: M3 Melbourne Data Centre; Melbourne Data Centre | AI Factories & Colocation

Address: Melbourne Data Centre | AI Factories & Colocation

Operator: NEXTDC opens $1.5b next generation sovereign data centre in Melbourne; M3 expansion planning application PA2604231

Business Model: Melbourne Data Centre | AI Factories & Colocation; M3 Melbourne Post Launch

Scale: M3 Melbourne Data Centre; NEXTDC M3 Data Centre Portfolio

Statuses: M3 expansion planning application PA2604231; Project Update: M3 Stage 2 and 4; Record Contracted Utilisation and A$2.2bn Capital Plan

Summary: M3 Melbourne Data Centre; M3 expansion planning application PA2604231; Record Contracted Utilisation and A$2.2bn Capital Plan

Location: Melbourne Data Centre | AI Factories & Colocation

Media: Property photo · www.nextdc.com

Stable identifier: ca5caffb-d2d4-4c31-97f5-0d5aac342506