S3 Sydney NEXTDC Data Centre ↗
Published Date unavailable · Retrieved 2026-10-09
Operator identifies S3 in Artarmon with 80MW IT capacity, 20,000 square metres technical space and 10,800 rack capacity; describes cooling and interconnection.
Australia / Facility
NEXTDC S3 · S3 Artarmon · S3 Sydney
Operational NEXTDC hyperscale colocation facility in Artarmon, Sydney. Stage 1 opened in September 2022 and the builder announced Stage 2 completion in June 2023. Subsequent capacity fit-outs continued: FY26 disclosures report 68MW built and 12MW in progress toward an ultimate 80MW IT capacity at 30 June 2026. S6 at 3 Broadcast Way is a separate facility.
PeeringDB facility geocode associated with the operator-confirmed 2 Broadcast Way address; property-marker placement has not been independently corroborated through Google Maps or cadastral evidence.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.
Loading local map…
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| 80 MW IT load | S3 ultimate target IT capacity Planned · cumulative | 2026-10-09 | Reported claim ↗ Excluded from capacity totals. As-of is retrieval date of an undated operator specification; target capacity is not measured demand or proof of full commissioning. |
| 68 MW IT load | S3 built capacity at FY26 year end Operational · cumulative | 2026-06-30 | Reported claim ↗ Excluded from capacity totals. FY26 presentation reports built capacity; date is financial year end, corroborated by the results announcement. This overlaps the ultimate 80MW target. |
| 12 MW IT load | S3 remaining capacity fit-out in progress Under Construction · incremental | 2026-06-30 | Reported claim ↗ Excluded from capacity totals. Announcement explicitly dates capacity in progress to 30 June 2026; this forms part of the ultimate target. |
| 16 MW IT load | S3 capacity delivered during FY26 Operational · incremental | 2026-06-30 | Reported claim ↗ Excluded from capacity totals. Period addition during FY26, already included in built capacity; not an additional independent facility total. |
| 120 MW Unspecified power | S3 potential electrical capacity described by builder Planned · unclear | 2022-08-28 | Reported claim ↗ Excluded from capacity totals. Publication-date claim of potential electrical capacity. IT/facility/grid basis is unspecified and cannot be reconciled automatically with the operator's 80MW IT target. |
| 12 MW Unspecified power | S3 opening available capacity Operational · cumulative | 2022-11-18 | Reported claim ↗ Excluded from capacity totals. Historical opening capacity reported in the dated AGM statement; basis is not explicitly stated in the opening-capacity sentence. |
| 40 MW IT load | S3 Stage 1 fully fitted capacity Planned · cumulative | 2022-11-18 | Reported claim ↗ Excluded from capacity totals. Historical Stage 1 target reported at the AGM; nested within the overall S3 target and not additive to it. |
Multiplex announced Stage 1 completion; this precedes the operator's formal opening.
Supporting source ↗Operator history records opening of the S3 hyperscale campus's first stage.
Supporting source ↗Builder announced completion of the second and final construction stage; later operator disclosures show capacity fit-outs continuing.
Supporting source ↗68MW built with 12MW still in progress; 16MW delivered during FY26.
Supporting source ↗Operator disclosed target/technical-space figure; builder's 2022 report gives more than 25,000 m² critical IT space, requiring scope reconciliation.
Source ↗Operator also describes N+2 CRAC units per hall and at least 24 hours water storage.
Source ↗Specification footnotes distinguish best instantaneous ratio from annual consumption ratio; facility webpage instead gives 1.2 annual-average target and 1.15 yearly lowest. Not treated as measured current performance.
Source ↗The 2.7MW UPS equipment rating is not a site-capacity claim.
Source ↗Operator lists Azure, AWS, Google Cloud, IBM Cloud and Oracle Cloud connectivity. Network presence does not establish customer tenancy.
Source ↗Operator-reported certification; certificate scope and current validity were not independently checked with the certifier.
Source ↗Builder's Stage 2 delivery figure; not summed with operator technical-space totals.
Source ↗Operator's public business contact; no contact was initiated.
Source ↗Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-10-09
Operator identifies S3 in Artarmon with 80MW IT capacity, 20,000 square metres technical space and 10,800 rack capacity; describes cooling and interconnection.
Published Date unavailable · Retrieved 2026-10-09
Lists S3 at 2 Broadcast Way, Artarmon NSW 2064 and separate S6 at 3 Broadcast Way; describes carrier-neutral colocation in Sydney, Australia.
Published Date unavailable · Retrieved 2026-10-09
Records September 2022 opening of Stage 1 of the 80MW hyperscale S3 Sydney campus in Artarmon.
Published 2026-08-27 · Retrieved 2026-10-09
Page 32 identifies S3 as operational with approximately 80MW total planned power, 68MW built and 12MW in progress; page 18 reports 16MW delivered during FY26.
Published 2026-08-27 · Retrieved 2026-10-09
Development activity explicitly dates remaining 12MW at S3 to 30 June 2026 and reports 16MW added during FY26.
Published 2023-06-14 · Retrieved 2026-10-09
Builder announces final construction stage completion at 2 Broadcast Way; reports additional 12,000 square metres data-hall space and more than 20,000 square metres critical IT space overall.
Published 2022-08-28 · Retrieved 2026-10-09
Builder reports Stage 1 completion, potential electrical capacity of 120MW, more than 25,000 square metres critical IT space and over 30,000 square metres net lettable area.
Published Date unavailable · Retrieved 2026-10-09
Facility record associates NEXTDC S3 with 2 Broadcast Way, Artarmon, AU and geocode -33.819344, 151.185033; lists exchanges and network presence. Displayed last update is 26 September 2025, not a publication date.
Published Date unavailable · Retrieved 2026-10-09
Determination approves an eight-storey data centre at 2 Broadcast Way Artarmon and identifies NEXTDC Limited as applicant/owner.
Published 2019-11-29 · Retrieved 2026-10-09
Council report identifies the proposed eight-storey data centre, its Artarmon NSW address and NEXTDC Limited as applicant/owner.
Published 2022-11-18 · Retrieved 2026-10-09
Reports S3 opening with 12MW available capacity and Stage 1 delivering 40MW IT capacity when fully fitted out.
Published Date unavailable · Retrieved 2026-10-09
Operator comparison labels S3 capacity as target IT capacity of 80MW and technical space as 20,000 square metres; gives target PUE approximately 1.15 instantaneous / 1.29 annual.
Published Date unavailable · Retrieved 2026-10-09
Lists S3 at 2 Broadcast Way, Artarmon NSW 2064 and public business telephone 136 398.
Name: S3 Sydney NEXTDC Data Centre; Sydney Data Centres | Colocation & Cloud Connectivity
Aliases: S3 Sydney NEXTDC Data Centre; Sydney Data Centres | Colocation & Cloud Connectivity; NEXTDC S3 - PeeringDB
Kind: S3 Sydney NEXTDC Data Centre; Multiplex completes Stage Two of NEXTDC’s S3 Sydney data centre
Country: Sydney Data Centres | Colocation & Cloud Connectivity; NEXTDC S3 - PeeringDB
Region: Sydney Data Centres | Colocation & Cloud Connectivity; Council assessment report: DA2019/79
City: Sydney Data Centres | Colocation & Cloud Connectivity; Council assessment report: DA2019/79
Metro: S3 Sydney NEXTDC Data Centre; Sydney Data Centres | Colocation & Cloud Connectivity
Address: Sydney Data Centres | Colocation & Cloud Connectivity; Sydney North Planning Panel determination: 2019SNH027 / DA2019/79; Get in Touch: Contact NEXTDC
Operator: S3 Sydney NEXTDC Data Centre; Sydney Data Centres | Colocation & Cloud Connectivity
Business Model: Sydney Data Centres | Colocation & Cloud Connectivity
Scale: Our History
Statuses: NEXTDC FY26 Results Presentation; FY26 Results Announcement
Summary: Sydney Data Centres | Colocation & Cloud Connectivity; Our History; NEXTDC FY26 Results Presentation; FY26 Results Announcement; Multiplex completes Stage Two of NEXTDC’s S3 Sydney data centre
Location: NEXTDC S3 - PeeringDB; Sydney Data Centres | Colocation & Cloud Connectivity
Stable identifier: ca832c97-66aa-4677-a967-619fd205df65