NEXTDC S3 · S3 Artarmon · S3 Sydney

OperationalUnder Construction

Operational NEXTDC hyperscale colocation facility in Artarmon, Sydney. Stage 1 opened in September 2022 and the builder announced Stage 2 completion in June 2023. Subsequent capacity fit-outs continued: FY26 disclosures report 68MW built and 12MW in progress toward an ultimate 80MW IT capacity at 30 June 2026. S6 at 3 Broadcast Way is a separate facility.

Last researched 2026-10-09Last verified Not independently verifiedPublished revision 1
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
NEXTDC
Ownership
Unknown / not established
Business model / scale
Colocation / Hyperscale
Region / metro
New South Wales / Sydney
City / locality
Artarmon
Address
2 Broadcast Way, Artarmon NSW 2064
Location
PeeringDB facility geocode associated with the operator-confirmed 2 Broadcast Way address; property-marker placement has not been independently corroborated through Google Maps or cadastral evidence.
Precision: approximate · -33.819344, 151.185033
View location on map →
Parent
Not assigned

Location detail

PeeringDB facility geocode associated with the operator-confirmed 2 Broadcast Way address; property-marker placement has not been independently corroborated through Google Maps or cadastral evidence.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.

2 Broadcast Way, Artarmon NSW 2064

Loading local map…

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
80 MW
IT load
S3 ultimate target IT capacity
Planned · cumulative
2026-10-09Reported claim ↗

Excluded from capacity totals. As-of is retrieval date of an undated operator specification; target capacity is not measured demand or proof of full commissioning.

68 MW
IT load
S3 built capacity at FY26 year end
Operational · cumulative
2026-06-30Reported claim ↗

Excluded from capacity totals. FY26 presentation reports built capacity; date is financial year end, corroborated by the results announcement. This overlaps the ultimate 80MW target.

12 MW
IT load
S3 remaining capacity fit-out in progress
Under Construction · incremental
2026-06-30Reported claim ↗

Excluded from capacity totals. Announcement explicitly dates capacity in progress to 30 June 2026; this forms part of the ultimate target.

16 MW
IT load
S3 capacity delivered during FY26
Operational · incremental
2026-06-30Reported claim ↗

Excluded from capacity totals. Period addition during FY26, already included in built capacity; not an additional independent facility total.

120 MW
Unspecified power
S3 potential electrical capacity described by builder
Planned · unclear
2022-08-28Reported claim ↗

Excluded from capacity totals. Publication-date claim of potential electrical capacity. IT/facility/grid basis is unspecified and cannot be reconciled automatically with the operator's 80MW IT target.

12 MW
Unspecified power
S3 opening available capacity
Operational · cumulative
2022-11-18Reported claim ↗

Excluded from capacity totals. Historical opening capacity reported in the dated AGM statement; basis is not explicitly stated in the opening-capacity sentence.

40 MW
IT load
S3 Stage 1 fully fitted capacity
Planned · cumulative
2022-11-18Reported claim ↗

Excluded from capacity totals. Historical Stage 1 target reported at the AGM; nested within the overall S3 target and not additive to it.

Development timeline

  1. 2022-08-28 · actual_completion_announcement

    Stage 1 construction completed

    Multiplex announced Stage 1 completion; this precedes the operator's formal opening.

    Supporting source ↗
  2. 2022-09 · actual_opening

    Stage 1 formally opened

    Operator history records opening of the S3 hyperscale campus's first stage.

    Supporting source ↗
  3. 2023-06-14 · actual_completion_announcement

    Stage 2 construction completed

    Builder announced completion of the second and final construction stage; later operator disclosures show capacity fit-outs continuing.

    Supporting source ↗
  4. 2026-06-30 · actual_reporting_milestone

    FY26 capacity position

    68MW built with 12MW still in progress; 16MW delivered during FY26.

    Supporting source ↗

Disclosed specifications

Technical space

20,000 m²

Operator disclosed target/technical-space figure; builder's 2022 report gives more than 25,000 m² critical IT space, requiring scope reconciliation.

Source ↗

Rack capacity

10,800

Advertised capacity, not installed or occupied rack count.

Source ↗

Cooling

Hot aisle containment; indirect free-cooling CRAC units and modular cooling towers; N+1 independent cooling

Operator also describes N+2 CRAC units per hall and at least 24 hours water storage.

Source ↗

Target PUE

Approximately 1.15 instantaneous / 1.29 annual

Specification footnotes distinguish best instantaneous ratio from annual consumption ratio; facility webpage instead gives 1.2 annual-average target and 1.15 yearly lowest. Not treated as measured current performance.

Source ↗

Resilience

Rotary UPS with MTU engines; backup includes mechanical systems; minimum 24-hour fuel storage

The 2.7MW UPS equipment rating is not a site-capacity claim.

Source ↗

Connectivity

Geodiverse managed and dark-fibre interconnects to S1 and S2; private cloud connectivity

Operator lists Azure, AWS, Google Cloud, IBM Cloud and Oracle Cloud connectivity. Network presence does not establish customer tenancy.

Source ↗

Certification

Uptime Institute Tier IV Design and Constructed Facility

Operator-reported certification; certificate scope and current validity were not independently checked with the certifier.

Source ↗

Stage 2 space

Additional 12,000 m² data-hall space

Builder's Stage 2 delivery figure; not summed with operator technical-space totals.

Source ↗

Public business contact

136 398; https://www.nextdc.com/contact

Operator's public business contact; no contact was initiated.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

S3 Sydney NEXTDC Data Centre ↗

Published Date unavailable · Retrieved 2026-10-09

Operator identifies S3 in Artarmon with 80MW IT capacity, 20,000 square metres technical space and 10,800 rack capacity; describes cooling and interconnection.

Our History ↗

Published Date unavailable · Retrieved 2026-10-09

Records September 2022 opening of Stage 1 of the 80MW hyperscale S3 Sydney campus in Artarmon.

NEXTDC FY26 Results Presentation ↗

Published 2026-08-27 · Retrieved 2026-10-09

Page 32 identifies S3 as operational with approximately 80MW total planned power, 68MW built and 12MW in progress; page 18 reports 16MW delivered during FY26.

FY26 Results Announcement ↗

Published 2026-08-27 · Retrieved 2026-10-09

Development activity explicitly dates remaining 12MW at S3 to 30 June 2026 and reports 16MW added during FY26.

NEXTDC S3 - PeeringDB ↗

Published Date unavailable · Retrieved 2026-10-09

Facility record associates NEXTDC S3 with 2 Broadcast Way, Artarmon, AU and geocode -33.819344, 151.185033; lists exchanges and network presence. Displayed last update is 26 September 2025, not a publication date.

Council assessment report: DA2019/79 ↗

Published 2019-11-29 · Retrieved 2026-10-09

Council report identifies the proposed eight-storey data centre, its Artarmon NSW address and NEXTDC Limited as applicant/owner.

2022 AGM - Chairman’s Statement ↗

Published 2022-11-18 · Retrieved 2026-10-09

Reports S3 opening with 12MW available capacity and Stage 1 delivering 40MW IT capacity when fully fitted out.

Sydney Data Centres Technical Specifications ↗

Published Date unavailable · Retrieved 2026-10-09

Operator comparison labels S3 capacity as target IT capacity of 80MW and technical space as 20,000 square metres; gives target PUE approximately 1.15 instantaneous / 1.29 annual.

Get in Touch: Contact NEXTDC ↗

Published Date unavailable · Retrieved 2026-10-09

Lists S3 at 2 Broadcast Way, Artarmon NSW 2064 and public business telephone 136 398.

Profile field evidence

Name: S3 Sydney NEXTDC Data Centre; Sydney Data Centres | Colocation & Cloud Connectivity

Aliases: S3 Sydney NEXTDC Data Centre; Sydney Data Centres | Colocation & Cloud Connectivity; NEXTDC S3 - PeeringDB

Kind: S3 Sydney NEXTDC Data Centre; Multiplex completes Stage Two of NEXTDC’s S3 Sydney data centre

Country: Sydney Data Centres | Colocation & Cloud Connectivity; NEXTDC S3 - PeeringDB

Region: Sydney Data Centres | Colocation & Cloud Connectivity; Council assessment report: DA2019/79

City: Sydney Data Centres | Colocation & Cloud Connectivity; Council assessment report: DA2019/79

Metro: S3 Sydney NEXTDC Data Centre; Sydney Data Centres | Colocation & Cloud Connectivity

Address: Sydney Data Centres | Colocation & Cloud Connectivity; Sydney North Planning Panel determination: 2019SNH027 / DA2019/79; Get in Touch: Contact NEXTDC

Operator: S3 Sydney NEXTDC Data Centre; Sydney Data Centres | Colocation & Cloud Connectivity

Business Model: Sydney Data Centres | Colocation & Cloud Connectivity

Scale: Our History

Statuses: NEXTDC FY26 Results Presentation; FY26 Results Announcement

Summary: Sydney Data Centres | Colocation & Cloud Connectivity; Our History; NEXTDC FY26 Results Presentation; FY26 Results Announcement; Multiplex completes Stage Two of NEXTDC’s S3 Sydney data centre

Location: NEXTDC S3 - PeeringDB; Sydney Data Centres | Colocation & Cloud Connectivity

Stable identifier: ca832c97-66aa-4677-a967-619fd205df65