STT Johor campus — supporting evidence ↗
Published Date unavailable · Retrieved 2026-09-11
Johor 1 factsheet distinguishes its up-to-16 MW building from the campus potential of 120 MW.
Malaysia / Site
Missing campus-level record; existing STT Johor 1 is a component. Parent linkage awaits campus approval. The 120 MW envelope is not additional to its buildings.

Rendering
Architectural rendering: STT Johor campus. Representative Johor 1 building design within the campus; not the full ultimate campus.
Published date unknown · Captured date unknown · Checked 2026-09-11
Selected from sources checked 2026-09-11 for identity and unobstructed property view; latest capture date cannot be established.
assets.sttelemediagdc.com · Source and attribution ↗Copyright/trademark belongs to the respective rights holder. Publicly available source; no open reuse license established. External reuse rights unconfirmed. Capture and original image publication dates not independently established; retrieval/upload dates are not capture dates.
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| 120 MW IT load | Reported design/development capacity; delivered share unconfirmed Planned · cumulative | 2026-09-11 | Reported claim ↗ Excluded from capacity totals. Research retrieval date, not measurement/commissioning date. Excluded from sums pending capacity and hierarchy reconciliation. Missing campus-level record; existing STT Johor 1 is a component. Parent linkage awaits campus approval. The 120 MW envelope is not additional to its buildings. |
Campus/component relationship for review; capacity may overlap. Parent assignment requires approved campus and a separate versioned child update.
Source ↗Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-09-11
Johor 1 factsheet distinguishes its up-to-16 MW building from the campus potential of 120 MW.
Published Date unavailable · Retrieved 2026-09-11
Architectural rendering: STT Johor campus. Representative Johor 1 building design within the campus; not the full ultimate campus. Image reference: https://assets.sttelemediagdc.com/sttgdc/global_en/public/2025-12/STT_Johor_1_Factsheet_v20251201.pdf Embedded image dba326c161bd0bc9-000 from the first two factsheet pages.
Published Date unavailable · Retrieved 2026-09-11
Global Data Centre operator brand mark. Image reference: https://static.wixstatic.com/media/920ccf_b83b028ed38e4577bdc487cd2951f1bd~mv2.png/v1/fill/w_212,h_76,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/datacentre-logo-horizontal.png Visually inspected against the cited source and profile identity.
Name: STT Johor campus — supporting evidence
Kind: STT Johor campus — supporting evidence
Country: STT Johor campus — supporting evidence
Region: STT Johor campus — supporting evidence
Metro: STT Johor campus — supporting evidence
Operator: STT Johor campus — supporting evidence
Statuses: STT Johor campus — supporting evidence
Summary: STT Johor campus — supporting evidence
Media: Property imagery · assets.sttelemediagdc.com
Operator Logo: Operator logo · www.globaltelecom.com.my
Stable identifier: cc81bbd7-9424-4f50-a9da-7f4f50328379