Operational commercial AI data center in Gasan-dong, Geumcheon-gu, Seoul. Opened in November 2025 with reported 26 MW IT capacity and 40 MW incoming electrical capacity. Pacific Asset Management commissioned the project and DL Construction built it; legal ownership is unresolved.
Last researched 2026-10-07Last verified Not independently verifiedPublished revision 1
Site / building photo
Completed Gasan AI Data Center front exterior; DL Construction identifies this as a photograph. Source published November 18, 2025; capture date unknown. Image retrieval timed out.
Published date unknown · Captured date unknown · Checked 2026-10-07
Research-selected property image; reviewer must confirm site identity, suitability and rights before publication.
Attributed to DL Construction; no reusable license established. Permission and visual suitability require review before import. Publication and capture dates were not independently established.
Site profile
Operator
kt cloud
Ownership
Unknown / not established
Business model / scale
Colocation / Hyperscale
Region / metro
Seoul Special City / Seoul Capital Area
City / locality
Seoul
Address
23 Gasan digital 2-ro, Geumcheon-gu, Seoul 08593, South Korea (Gasan-dong 345-48)
Location
Third-party address geocode for 23 Gasan digital 2-ro; street address corroborated by kt cloud and parcel 345-48 by DL Construction. Rounded coordinates; marker/building position not independently verified. Precision: approximate · 37.470548, 126.883049 View location on map →
Parent
Not assigned
Location detail
Third-party address geocode for 23 Gasan digital 2-ro; street address corroborated by kt cloud and parcel 345-48 by DL Construction. Rounded coordinates; marker/building position not independently verified.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.
23 Gasan digital 2-ro, Geumcheon-gu, Seoul 08593, South Korea (Gasan-dong 345-48)
Loading local map…
Capacity evidence
Statements retain their dates, definitions and development scope. Do not add these rows together.
Claim / measurement
Scope and status
As of
Evidence and accounting
26 MW IT load
Gasan IDC total planned IT capacity Planned · cumulative
Excluded from capacity totals. Announcement date; planned capacity rather than actual equipment consumption. Repeated at opening and not an additional increment.
26 MW IT load
Gasan AI Data Center advertised total IT capacity at opening Operational · cumulative
Excluded from capacity totals. Opening announcement date; capacity rating, not measured utilization. Contractor and later KT investor material repeat 26 MW.
40 MW Grid connection
Gasan AI Data Center total incoming electrical capacity Operational · cumulative
Excluded from capacity totals. Opening announcement date. Source term is total receiving capacity (수전 용량); no utility connection agreement inspected. Includes a different power boundary from IT capacity and must not be added to 26 MW.
Development timeline
2022-06 · actual_construction_start
Construction began
Start month reported retrospectively by the contractor.
Indexed official release announces opening, 26 MW IT and 40 MW incoming electrical capacity, approximately 11,046 pyeong, D2C cooling, redundant incoming power/communications and 100G One DC connectivity. Direct page returned minimal text.
Contractor states Pacific Asset Management commissioned the kt cloud-operated project; construction began June 2022, completed May 2025, and opening ceremony occurred November 5 after containment works. Reports 36,501 square metres and 163.38 kW solar panels; labels exterior images as photographs.
Third-party address page links street address to Gasan-dong 345-48, postcode 08593 and Republic of Korea; supplies latitude 37.470547995677 and longitude 126.88304901087.
Current official service homepage lists Gasan AI DC, AI server plus colocation infrastructure and 100G One DC network; publishes Gasan business contact gsdc.ktcloud@kt.com and 02-851-8697.
Dated contemporaneous coverage corroborates street address, hyperscale identity, 26 MW planned IT capacity and planned 2025 completion; identifies original project image as a rendering.
Secondary property-record service identifies data-center use, 36,501.1 square metres gross floor area, 4,442 square metres land and 2,487.25 square metres building footprint; original government register not inspected.
Completed Gasan AI Data Center front exterior; DL Construction identifies this as a photograph. Source published November 18, 2025; capture date unknown. Image retrieval timed out. Original image: https://www.dlconstruction.co.kr/xUpRoot/yMist/zService/News/CK_20251118165428063301740.jpg