SC2 Sunshine Coast Data Centre ↗
Published Date unavailable · Retrieved 2026-10-09
Operator identifies SC2 in Maroochydore, in development, with 6 MW IT capacity and target Tier IV UI certification; portfolio lists technical space as TBD.
Australia / Facility
SC2 Sunshine Coast · NEXTDC SC2
NEXTDC's SC2 is a carrier-neutral edge data centre under construction in Maroochydore City Centre, adjacent to the separate SC1 facility. The operator advertises 6 MW ultimate IT capacity and targets Tier IV certification. Its February 2026 presentation identifies approximately 1 MW initial capacity and planned practical completion in 2HFY27; neither full capacity nor completion is established as actual.
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| 6 MW IT load | SC2 ultimate advertised IT capacity Planned · cumulative | 2026-10-09 | Reported claim ↗ Excluded from capacity totals. Undated operator page retrieved on this date; 6 MW is advertised future IT capacity, not commissioned load. Exceeds 5 MW on this basis. |
| ≈6 MW Unspecified power | SC2 total planned power Planned · cumulative | 2026-02-25 | Reported claim ↗ Excluded from capacity totals. As-of is presentation date. Slide says total power planned without specifying basis; overlaps c1 and must not be added to it. |
| ≈1 MW Unspecified power | SC2 initial capacity Under Construction · cumulative | 2026-02-25 | Reported claim ↗ Excluded from capacity totals. As-of is presentation date. Initial capacity is a subset of ultimate capacity, with practical completion forecast for 2HFY27; no operational commissioning established. |
DCD reported NEXTDC's proposal for a second Maroochydore facility adjacent to SC1.
Supporting source ↗Local reporting dates EDQ approval to June 2025; the opened EDQ application confirms approved status but does not display the decision date.
Supporting source ↗NEXTDC described SC2 as currently under construction in its Tabua cable landing announcement; this is not a construction-start date.
Supporting source ↗February 2026 presentation forecasts practical completion in the second half of financial year 2027; actual completion remains unconfirmed.
Supporting source ↗Proposed plot area reported by DCD; not technical or gross building floor area.
Source ↗Target only; achieved certification not established.
Source ↗Waste management plan description; industry and local reporting describe five storeys/levels, requiring architectural reconciliation.
Source ↗Council investment publication's reported project investment; not verified final expenditure.
Source ↗Operator describes SC1 and SC2 together; no SC2-specific port speeds or carrier inventory established.
Source ↗Design/operational target in waste management plan, not achieved performance.
Source ↗Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-10-09
Operator identifies SC2 in Maroochydore, in development, with 6 MW IT capacity and target Tier IV UI certification; portfolio lists technical space as TBD.
Published Date unavailable · Retrieved 2026-10-09
EDQ lists NEXTDC Limited c/- Ethos Urban as applicant, 10 South Sea Islander Way in Maroochydore City Centre, Lot 10 SP305311, and approved status.
Published 2025-11-14 · Retrieved 2026-10-09
NEXTDC explicitly describes SC2 as under construction and SC1/SC2 as delivering carrier-neutral connectivity at the Sunshine Coast cable landing station supporting Tabua.
Published 2026-02-25 · Retrieved 2026-10-09
Presentation dated 25 February 2026 classifies SC2 among strategic edge developments; page 31 lists approximately 6 MW total planned power, approximately 1 MW initial capacity and practical completion 2HFY27.
Published 2026-03-26 · Retrieved 2026-10-09
Council investment publication describes SC2 under construction next door to SC1 in the city centre, representing a $200 million investment for high-density AI computing.
Published 2025-04-23 · Retrieved 2026-10-09
Industry report locates proposed SC2 on a 3,710 square metre plot at 10 South Sea Islander Way, Queensland, Australia; distinguishes SC1 at 44 Maud Street and describes a five-storey proposal.
Published Date unavailable · Retrieved 2026-10-09
Government-hosted project plan identifies NEXTDC SC2 at Lot 10 South Sea Islander Way, a six-level building containing offices, data halls, storage and plant, and a target of at least 90% operational solid-waste diversion.
Published Date unavailable · Retrieved 2026-10-09
Regional operator page promotes edge colocation and separately lists SC1 and SC2. Its SC2 'In Planning' label conflicts with newer construction disclosures; 290 square metres, 80+ racks and 1 MW describe SC1.
Published 2026-07-20 · Retrieved 2026-10-09
Local report describes SC2 under construction at 10 South Sea Islander Way, expected online January–June 2027, with approval in June 2025; identifies a property rendering attributed to Architectus.
Name: SC2 Sunshine Coast Data Centre; Application #DEV2025/1604; NEXTDC SC2 Waste Management Plan
Aliases: SC2 Sunshine Coast Data Centre; NEXTDC SC2 Waste Management Plan
Kind: SC2 Sunshine Coast Data Centre; NEXTDC SC2 Waste Management Plan
Country: NextDC files to develop 6MW data center in Queensland, Australia; Sunshine Coast Cable Landing Station: A Sea of Opportunity
Region: SC2 Sunshine Coast Data Centre; NextDC files to develop 6MW data center in Queensland, Australia; NEXTDC SC2 Waste Management Plan
City: SC2 Sunshine Coast Data Centre; Application #DEV2025/1604
Metro: SC2 Sunshine Coast Data Centre; CBD Milestones Signal Maturity
Address: Application #DEV2025/1604; NextDC files to develop 6MW data center in Queensland, Australia
Operator: SC2 Sunshine Coast Data Centre; Sunshine Coast Cable Landing Station: A Sea of Opportunity
Business Model: Sunshine Coast Cable Landing Station: A Sea of Opportunity; Sunshine Coast Data Centre
Scale: NEXTDC 1H26 Results Presentation
Statuses: Sunshine Coast Cable Landing Station: A Sea of Opportunity; CBD Milestones Signal Maturity; Coast's newest AI centre to escape government rules
Summary: SC2 Sunshine Coast Data Centre; Sunshine Coast Cable Landing Station: A Sea of Opportunity; NEXTDC 1H26 Results Presentation; CBD Milestones Signal Maturity
Location: Application #DEV2025/1604
Stable identifier: dbb5ed31-85bc-4fa3-a2c6-aedae121d3f5