S5 Sydney NEXTDC Data Centre ↗
Published Date unavailable · Retrieved 2026-10-09
Operator identifies S5 in Macquarie Park as in planning, with future 80MW+ IT capacity, 16,000 m² technical space and target Uptime Tier IV certification.
Australia / Site
S5 Sydney Data Centre · NEXTDC S5 Data Centre and Innovation Hub · S5 Macquarie Park
Planned NEXTDC data centre and innovation hub in Macquarie Park, Sydney, distinct from S1 and S2. The operator advertises 80MW+ of future IT capacity and 16,000 m² of technical space. NSW application SSD-63168959 remains under assessment with more information required. Operational capacity and commissioning dates are unestablished.
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| ≥60 MW IT load | S5 whole-site target once built Planned · cumulative | 2023-04-12 | Reported claim ↗ Excluded from capacity totals. Date is the ASX announcement date. Source uses 60MW+ and makes delivery conditional on development approval; historical target subsequently revised. |
| ≥80 MW IT load | S5 whole-site future IT capacity Planned · cumulative | 2026-10-09 | Reported claim ↗ Excluded from capacity totals. As-of is retrieval date of undated live operator page, not announcement or commissioning date. Source uses 80MW+; no operational availability established. |
| ≈20 MW Unspecified power | S5 expected Phase 1 capacity Planned · incremental | 2026-10-09 | Reported claim ↗ Excluded from capacity totals. As-of is retrieval date of the 2025 AGM presentation; exact publication date unestablished. Table labels this expected capacity, not delivered capacity. Power basis is not explicitly defined on the S5 table. Phase 1 overlaps the whole-site target and must not be added to it. |
FY23 annual report records acquisition near S1 and S2; exact transaction date and landholding entity unestablished.
Supporting source ↗NEXTDC disclosed a 60MW+ IT target subject to development approval.
Supporting source ↗NSW issued SEARs for SSD-63168959 at 269 Lane Cove Road.
Supporting source ↗FY25 results presentation reports a revision from 60MW to 80MW while planning works continue.
Supporting source ↗Sydney locality identified by operator and NSW planning records.
Source ↗Government assessment requirements identify the subject property.
Source ↗Historical 2024 proposal specification, subject to approval and final engineering design.
Source ↗Target only; awarded certification not established.
Source ↗2024 proposal; current commissioned S5 connectivity unestablished.
Source ↗WT Partnership estimate dated 29 September 2025; not expenditure incurred.
Source ↗Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-10-09
Operator identifies S5 in Macquarie Park as in planning, with future 80MW+ IT capacity, 16,000 m² technical space and target Uptime Tier IV certification.
Published Date unavailable · Retrieved 2026-10-09
SSD-63168959, City of Ryde; assessment status More Information Required. Proposal includes demolition, a new data centre and innovation hub, urban plaza and roads.
Published 2023-11-08 · Retrieved 2026-10-09
Government letter identifies NEXTDC Limited and the S5 project at 269 Lane Cove Road, Macquarie Park, NSW 2113, Lot 3 DP 1129811.
Published 2023-04-12 · Retrieved 2026-10-09
ASX release states expansion land secured for S5 and target IT capacity of 60MW+ once built, subject to development approval.
Published Date unavailable · Retrieved 2026-10-09
Directors’ report for year ended 30 June 2023 states a new S5 site was acquired close to S1 and S2.
Published Date unavailable · Retrieved 2026-10-09
Operator’s Sydney colocation network lists S5 separately from S1 and S2 and labels S5 in planning.
Published 2025-08-28 · Retrieved 2026-10-09
Presentation dated 28 August 2025 reports planning works for S5 and a capacity revision from 60MW to 80MW.
Published Date unavailable · Retrieved 2026-10-09
S5 appears under hyperscale development projects: total power planned approximately 80MW+, expected approximately 20MW for Phase 1, design and town planning, subject to approval.
Published Date unavailable · Retrieved 2026-10-09
S5 specification slide reports approximately 22,600 m² land and 16,000 m² technical space; proposed interconnection through Data Centre Interconnect and AXON. Specifications subject to approval and final engineering design; image labelled artist’s impression.
Published 2025-09-29 · Retrieved 2026-10-09
WT Partnership statement prepared for NEXTDC Limited repeats address and parcel and estimates development cost at AUD 1,532,941,000 excluding GST.
Name: S5 Sydney NEXTDC Data Centre; NEXTDC S5 Data Centre and Innovation Hub — NSW Planning Portal
Aliases: S5 Sydney NEXTDC Data Centre; NEXTDC S5 Data Centre and Innovation Hub — NSW Planning Portal
Kind: NEXTDC S5 Data Centre and Innovation Hub — NSW Planning Portal; Planning Secretary’s Environmental Assessment Requirements letter — S5
Country: Planning Secretary’s Environmental Assessment Requirements letter — S5; Sydney Data Centre Colocation Services
Region: Planning Secretary’s Environmental Assessment Requirements letter — S5
City: S5 Sydney NEXTDC Data Centre; Sydney Data Centre Colocation Services
Metro: S5 Sydney NEXTDC Data Centre; Sydney Data Centre Colocation Services
Address: Planning Secretary’s Environmental Assessment Requirements letter — S5; NEXTDC S5 Data Centre — Estimated Development Cost
Operator: S5 Sydney NEXTDC Data Centre; Planning Secretary’s Environmental Assessment Requirements letter — S5
Owner: NEXTDC FY23 Annual Report
Business Model: Sydney Data Centre Colocation Services
Scale: NEXTDC Annual General Meeting 2025 presentation
Statuses: S5 Sydney NEXTDC Data Centre; NEXTDC S5 Data Centre and Innovation Hub — NSW Planning Portal
Summary: S5 Sydney NEXTDC Data Centre; NEXTDC S5 Data Centre and Innovation Hub — NSW Planning Portal; Planning Secretary’s Environmental Assessment Requirements letter — S5; Sydney Data Centre Colocation Services
Location: Planning Secretary’s Environmental Assessment Requirements letter — S5; NEXTDC S5 Data Centre — Estimated Development Cost
Stable identifier: dc70b325-6b0c-4fe6-8163-026bdeeef2f7