South Korea Data Centers in Seoul and Busan ↗
Published Date unavailable · Retrieved 2026-10-07
Operator groups SEL2 and SEL3 as Seoul Bupyeong Campus in Incheon and publishes current capacity and facility specifications.
South Korea / Site
Seoul Bupyeong Campus · Digital Edge Bupyeong Campus
Digital Edge campus developed with SK ecoplant. SEL2 operates; adjacent SEL3 is under construction. Campus power claims differ across dated sources and should not be aggregated.
Operator SEL2 specification-sheet point, used as an approximate campus reference; parcel address corroborated by local reporting, but footprint and point placement were not independently verified.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.
Loading local map…
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| 36 MW Unspecified power | SEL2 first phase Operational · incremental | 2024-10-16 | Reported claim ↗ Excluded from capacity totals. Announcement date; rated capacity, not demonstrated utilization. Original release does not explicitly distinguish IT and facility power. |
| 60 MW Unspecified power | SEL3 second phase Under Construction · incremental | 2025-07-10 | Reported claim ↗ Excluded from capacity totals. Announcement date; future addition, not operational capacity. |
| 96 MW Unspecified power | Entire campus after SEL3 completion Under Construction · cumulative | 2025-07-10 | Conflicting claim ↗ Excluded from capacity totals. Announcement date; ultimate mixed-status campus scope. Conflicts with older totals; not added to phase claims. |
| ≥100 MW Unspecified power | Ultimate campus described at SEL2 launch Planned · cumulative | 2024-10-16 | Conflicting claim ↗ Excluded from capacity totals. Announcement date. Source writes 100+ MW; preserved as a lower-bound claim. Differs from subsequent 96 MW total. |
| 120 MW IT load | Historical full Bupyeong joint-venture development Planned · cumulative | 2022-05-05 | Conflicting claim ↗ Excluded from capacity totals. Industry article publication date, not commissioning date. Historical total IT power conflicts with later campus scope; operator sheet and developer article also retain 120 MW without an explicit basis. |
| 120 MW Unspecified power | Bupyeong development described by SK ecoplant Under Construction · cumulative | 2024-01-05 | Conflicting claim ↗ Excluded from capacity totals. Developer article date; historical development description, not proof of delivered capacity or a separate addition. |
Later operator release dates SEL2 RFS to August 2024.
Supporting source ↗Public launch announcement confirms service availability.
Supporting source ↗Operator reports start of second-phase construction.
Supporting source ↗KRW 800 billion Green Loan announced.
Supporting source ↗Target Ready-for-Service quarter; not an achieved milestone.
Supporting source ↗Partnership is established; legal ownership allocation remains unresolved.
Source ↗Conditional design capability; not evidence of installed customer density.
Source ↗Design figure at launch, distinct from current advertised annual PUE.
Source ↗Current campus page; measurement period and phase scope unspecified.
Source ↗Shown beside 36 MW details, apparently SEL2; not established as total campus floor area.
Source ↗Operator marketing specifications beside SEL2 details.
Source ↗Listed by operator; certificates, certification body and phase scope not inspected.
Source ↗Historical sheet describes opening plans; current implementation not independently established.
Source ↗Developer's January 2024 planned auxiliary supply; commissioning not established. Excluded from load-capacity totals.
Source ↗Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-10-07
Operator groups SEL2 and SEL3 as Seoul Bupyeong Campus in Incheon and publishes current capacity and facility specifications.
Published Date unavailable · Retrieved 2026-10-07
Operator identifies SEL2 as the first phase of a 100+ MW Bupyeong-gu project.
Published 2024-10-16 · Retrieved 2026-10-07
Ready-for-Service announcement identifies SK Ecoplant partnership, liquid-cooling density capability, design PUE and an unnamed anchor tenant.
Published 2025-07-10 · Retrieved 2026-10-07
Operator reports SEL3 construction, financing and delivery target; describes SEL2 as a hyperscale facility and dates its RFS to August 2024.
Published Date unavailable · Retrieved 2026-10-07
Operator sheet provides parcel address and coordinates, historical 120 MW scope and connectivity plans. Copyright 2023 is not treated as publication date; an apparent Yeoksam access-text error reduces confidence in ancillary directions.
Published 2024-01-05 · Retrieved 2026-10-07
Developer describes the Bupyeong project as 120 MW and proposes a 330 kW SOFC auxiliary supply.
Published 2022-05-05 · Retrieved 2026-10-07
Industry report explicitly describes historical joint-venture project capacity as total IT power of 120 MW.
Name: South Korea Data Centers in Seoul and Busan
Aliases: South Korea Data Centers in Seoul and Busan; Digital Edge Secures Financing to Complete Major Data Center Campus
Kind: South Korea Data Centers in Seoul and Busan; Digital Edge Secures Financing to Complete Major Data Center Campus
Country: South Korea Data Centers in Seoul and Busan; Digital Edge Announces Availability of 36MW Data Center in South Korea; SEL2 specification sheet
Region: South Korea Data Centers in Seoul and Busan; SEL2 specification sheet
City: South Korea Data Centers in Seoul and Busan; SEL2 specification sheet
Metro: Digital Edge Announces Availability of 36MW Data Center in South Korea; Digital Edge Secures Financing to Complete Major Data Center Campus
Address: SEL2 specification sheet
Operator: South Korea Data Centers in Seoul and Busan; Digital Edge Announces Availability of 36MW Data Center in South Korea; Digital Edge Secures Financing to Complete Major Data Center Campus
Business Model: South Korea Data Centers in Seoul and Busan; Digital Edge Announces Availability of 36MW Data Center in South Korea
Scale: Digital Edge Secures Financing to Complete Major Data Center Campus
Statuses: South Korea Data Centers in Seoul and Busan; Digital Edge Secures Financing to Complete Major Data Center Campus
Summary: South Korea Data Centers in Seoul and Busan; Digital Edge Announces Availability of 36MW Data Center in South Korea; Digital Edge Secures Financing to Complete Major Data Center Campus; SEL2 specification sheet
Location: SEL2 specification sheet
Stable identifier: dd3f3081-f6e4-4668-8df1-03c67ff6fae3