← GDC Banting campus

Published history

Restoring content creates a new revision. Previous revisions remain in the audit trail.

Revision 4 · Current

2026-10-10 02:09 UTC

Published profile snapshot

GDC Banting campus · Malaysia · Global Data Centre

Planned data-centre development on a 36-acre parcel within COMPASS @ Kota Seri Langat, Banting, Selangor. The July 2026 land-sale announcement names Global Data Infrastructure Sdn Bhd as purchaser and reports 210 MW IT capacity with a separate 300 MVA power requirement. Global Data Centre remains the recorded operator, supported by directories; its precise legal relationship with the purchaser needs confirmation. Construction commencement and commissioned capacity are unconfirmed.

Capacity statements: 3 · Sources: 16

210 MW (exact) · unspecified · Advertised full-build/design capacity; commissioned share unconfirmed · 2026-09-11

210 MW (exact) · it · Proposed facility on the 36-acre COMPASS land parcel · 2026-09-11

210 MW (exact) · it · Announced development on the 36-acre COMPASS @ Kota Seri Langat parcel; building and phase allocations undisclosed · 2026-07-08

Revision 3

2026-09-11 12:15 UTC

Published profile snapshot

GDC Banting campus · Malaysia · Global Data Centre

Banting is included as an outer Klang Valley industrial catchment; review metro boundary. Ultimate design, not operating power.

Capacity statements: 2 · Sources: 3

210 MW (exact) · unspecified · Advertised full-build/design capacity; commissioned share unconfirmed · 2026-09-11

210 MW (exact) · it · Proposed facility on the 36-acre COMPASS land parcel · 2026-09-11

Revision 2

2026-09-11 11:26 UTC

Published profile snapshot

GDC Banting campus · Malaysia · Global Data Centre

Banting is included as an outer Klang Valley industrial catchment; review metro boundary. Ultimate design, not operating power.

Capacity statements: 2 · Sources: 2

210 MW (exact) · unspecified · Advertised full-build/design capacity; commissioned share unconfirmed · 2026-09-11

210 MW (exact) · it · Proposed facility on the 36-acre COMPASS land parcel · 2026-09-11

Revision 1

2026-09-11 09:58 UTC

Published profile snapshot

GDC Banting campus · Malaysia · Global Data Centre

Banting is included as an outer Klang Valley industrial catchment; review metro boundary. Ultimate design, not operating power.

Capacity statements: 1 · Sources: 1

210 MW (exact) · unspecified · Advertised full-build/design capacity; commissioned share unconfirmed · 2026-09-11