← GDC Banting campusPublished history
Restoring content creates a new revision. Previous revisions remain in the audit trail.
Revision 4 · Current
2026-10-10 02:09 UTC
Published profile snapshot
GDC Banting campus · Malaysia · Global Data Centre
Planned data-centre development on a 36-acre parcel within COMPASS @ Kota Seri Langat, Banting, Selangor. The July 2026 land-sale announcement names Global Data Infrastructure Sdn Bhd as purchaser and reports 210 MW IT capacity with a separate 300 MVA power requirement. Global Data Centre remains the recorded operator, supported by directories; its precise legal relationship with the purchaser needs confirmation. Construction commencement and commissioned capacity are unconfirmed.
Capacity statements: 3 · Sources: 16
210 MW (exact) · unspecified · Advertised full-build/design capacity; commissioned share unconfirmed · 2026-09-11
210 MW (exact) · it · Proposed facility on the 36-acre COMPASS land parcel · 2026-09-11
210 MW (exact) · it · Announced development on the 36-acre COMPASS @ Kota Seri Langat parcel; building and phase allocations undisclosed · 2026-07-08
Revision 3
2026-09-11 12:15 UTC
Published profile snapshot
GDC Banting campus · Malaysia · Global Data Centre
Banting is included as an outer Klang Valley industrial catchment; review metro boundary. Ultimate design, not operating power.
Capacity statements: 2 · Sources: 3
210 MW (exact) · unspecified · Advertised full-build/design capacity; commissioned share unconfirmed · 2026-09-11
210 MW (exact) · it · Proposed facility on the 36-acre COMPASS land parcel · 2026-09-11
Revision 2
2026-09-11 11:26 UTC
Published profile snapshot
GDC Banting campus · Malaysia · Global Data Centre
Banting is included as an outer Klang Valley industrial catchment; review metro boundary. Ultimate design, not operating power.
Capacity statements: 2 · Sources: 2
210 MW (exact) · unspecified · Advertised full-build/design capacity; commissioned share unconfirmed · 2026-09-11
210 MW (exact) · it · Proposed facility on the 36-acre COMPASS land parcel · 2026-09-11
Revision 1
2026-09-11 09:58 UTC
Published profile snapshot
GDC Banting campus · Malaysia · Global Data Centre
Banting is included as an outer Klang Valley industrial catchment; review metro boundary. Ultimate design, not operating power.
Capacity statements: 1 · Sources: 1
210 MW (exact) · unspecified · Advertised full-build/design capacity; commissioned share unconfirmed · 2026-09-11