Digital Halo JHB1 campus — capacity evidence ↗
Published Date unavailable · Retrieved 2026-09-11
JHB1 has a reported 150 MW TNB energy supply agreement.
Malaysia / Site
150 MW is the TNB electricity supply agreement, not IT load; energization and actual demand unknown.
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| 150 MW Grid connection | Contracted grid supply; energized capacity not established Planned · cumulative | 2026-09-11 | Reported claim ↗ Excluded from capacity totals. Retrieval date, not measurement date. Design ceiling is not proof of delivered/occupied load. Excluded from aggregates pending reconciliation. 150 MW is the TNB electricity supply agreement, not IT load; energization and actual demand unknown. |
Source-backed research proposal; publication requires review.
Source ↗Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-09-11
JHB1 has a reported 150 MW TNB energy supply agreement.
Published Date unavailable · Retrieved 2026-09-11
Utility records August 2025 ESA for Digital Halo/Nanda Digital at 150 MW.
Published Date unavailable · Retrieved 2026-09-11
Digital Halo operator brand mark. Image reference: https://digitalhalo.net/wp-content/uploads/2024/05/3c30c5_b11e3ac6c9454215aabf08bbd8d984f4mv2-300x64.webp Visually inspected against the cited source and profile identity.
Name: Digital Halo JHB1 campus — capacity evidence
Operator: Digital Halo JHB1 campus — capacity evidence; TNB · Third-quarter 2025 business update
Country: Digital Halo JHB1 campus — capacity evidence
Region: Digital Halo JHB1 campus — capacity evidence
Metro: Digital Halo JHB1 campus — capacity evidence
City: Digital Halo JHB1 campus — capacity evidence
Address: Digital Halo JHB1 campus — capacity evidence
Kind: Digital Halo JHB1 campus — capacity evidence
Statuses: Digital Halo JHB1 campus — capacity evidence
Summary: Digital Halo JHB1 campus — capacity evidence
Capacity Claims: TNB · Third-quarter 2025 business update
Operator Logo: Operator logo · digitalhalo.net