Princeton Digital Group JC2 — supporting evidence ↗
Published 2025-03-13 · Retrieved 2026-09-11
PDG's 2025 financing announcement identifies JC2 at 22 MW.
Indonesia / Facility
Child of existing JC1–JC2 campus; 22 MW is part of the campus total, not new additional capacity. IT basis not explicit in this announcement.

Site / building photo
Property exterior: Princeton Digital Group JC2.
Published date unknown · Captured date unknown · Checked 2026-09-11
Selected from sources checked 2026-09-11 for identity and unobstructed property view; latest capture date cannot be established.
princetondg.com · Source and attribution ↗Copyright/trademark belongs to the respective rights holder. Publicly available source; no open reuse license established. External reuse rights unconfirmed. Capture and original image publication dates not independently established; retrieval/upload dates are not capture dates.
Named Google Maps site POI matched to facility identity and locality; approximate property location, not independently verified building boundary or entrance.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.
Loading local map…
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| 22 MW Unspecified power | Reported design/development capacity; delivered share unconfirmed Operational · cumulative | 2026-09-11 | Reported claim ↗ Excluded from capacity totals. Research retrieval date, not measurement/commissioning date. Excluded from sums pending capacity and hierarchy reconciliation. Child of existing JC1–JC2 campus; 22 MW is part of the campus total, not new additional capacity. IT basis not explicit in this announcement. |
Campus/component relationship for review; capacity may overlap. Parent assignment requires approved campus and a separate versioned child update.
Source ↗Source attribution does not imply independent verification or permission to reuse images.
Published 2025-03-13 · Retrieved 2026-09-11
PDG's 2025 financing announcement identifies JC2 at 22 MW.
Published Date unavailable · Retrieved 2026-09-11
Named place result PDG Data Center JC2; POI coordinates -6.3147992, 107.0900229. Named Google Maps site POI matched to facility identity and locality; approximate property location, not independently verified building boundary or entrance.
Published Date unavailable · Retrieved 2026-09-11
Property exterior: Princeton Digital Group JC2. Image reference: https://princetondg.com/wp-content/uploads/2024/07/JC2_view-1.jpg Visually inspected against the cited source and profile identity.
Published Date unavailable · Retrieved 2026-09-11
Princeton operator brand mark. Image reference: https://princetondg.com/wp-content/uploads/2024/07/PDG-logo_cropped.png Visually inspected against the cited source and profile identity.
Name: Princeton Digital Group JC2 — supporting evidence
Kind: Princeton Digital Group JC2 — supporting evidence
Country: Princeton Digital Group JC2 — supporting evidence
Region: Princeton Digital Group JC2 — supporting evidence
Metro: Princeton Digital Group JC2 — supporting evidence
Operator: Princeton Digital Group JC2 — supporting evidence
Statuses: Princeton Digital Group JC2 — supporting evidence
Summary: Princeton Digital Group JC2 — supporting evidence
Location: Google Maps · PDG Data Center JC2
Media: Property imagery · princetondg.com
Operator Logo: Operator logo · princetondg.com
Stable identifier: e6c27024-2f48-4d5f-b9b9-7cdc4a4e763e