Replaces the CSV's unsupported 200 MW estimate with the operator's current full-build design. Separate from existing MY06. Ulu Tiram siting comes from CSV and awaits precise address verification.

Last researched 2026-09-11Last verified Not independently verifiedPublished revision 3
Architectural rendering: Bridge Data Centres MY07 campus.

Rendering

Architectural rendering: Bridge Data Centres MY07 campus.

Published date unknown · Captured date unknown · Checked 2026-09-11

Selected from sources checked 2026-09-11 for identity and unobstructed property view; latest capture date cannot be established.

www.bridgedatacentres.com · Source and attribution ↗
Image rights and date notes

Copyright/trademark belongs to the respective rights holder. Publicly available source; no open reuse license established. External reuse rights unconfirmed. Capture and original image publication dates not independently established; retrieval/upload dates are not capture dates.

Site profile

Operator
Bridge Data Centres
Ownership
Unknown / not established
Business model / scale
Unknown / Unknown
Region / metro
Johor / Johor Bahru
City / locality
Unknown
Address
Unknown
Location
Named Google Maps site POI matched to facility identity and locality; approximate property location, not independently verified building boundary or entrance.
Precision: approximate · 1.558784, 103.8421481
View location on map →
Parent
Not assigned

Location detail

Named Google Maps site POI matched to facility identity and locality; approximate property location, not independently verified building boundary or entrance.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.

Address unknown

Loading local map…

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
374 MW
IT load
Reported design/development capacity; delivered share unconfirmed
Planned · cumulative
2026-09-11Reported claim ↗

Excluded from capacity totals. Research retrieval date, not measurement/commissioning date. Excluded from sums pending capacity and hierarchy reconciliation. Replaces the CSV's unsupported 200 MW estimate with the operator's current full-build design. Separate from existing MY06. Ulu Tiram siting comes from CSV and awaits precise address verification.

Development timeline

  1. No dated milestones established.

Disclosed specifications

No additional specifications established.

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

Google Maps · BDC MY07 ↗

Published Date unavailable · Retrieved 2026-09-11

Named place result BDC MY07; POI coordinates 1.558784, 103.8421481. Named Google Maps site POI matched to facility identity and locality; approximate property location, not independently verified building boundary or entrance.

Property imagery · www.bridgedatacentres.com ↗

Published Date unavailable · Retrieved 2026-09-11

Architectural rendering: Bridge Data Centres MY07 campus. Image reference: https://www.bridgedatacentres.com/wp-content/uploads/2026/09/MY07-768x480.jpg Visually inspected against the cited source and profile identity.

Operator logo · www.bridgedatacentres.com ↗

Published Date unavailable · Retrieved 2026-09-11

Bridge Data Centres operator brand mark. Image reference: https://www.bridgedatacentres.com/wp-content/uploads/2026/06/BDC-Logo.webp Visually inspected against the cited source and profile identity.

Profile field evidence

Name: Bridge Data Centres MY07 campus — supporting evidence

Kind: Bridge Data Centres MY07 campus — supporting evidence

Country: Bridge Data Centres MY07 campus — supporting evidence

Region: Bridge Data Centres MY07 campus — supporting evidence

Metro: Bridge Data Centres MY07 campus — supporting evidence

Operator: Bridge Data Centres MY07 campus — supporting evidence

Statuses: Bridge Data Centres MY07 campus — supporting evidence

Summary: Bridge Data Centres MY07 campus — supporting evidence

Location: Google Maps · BDC MY07

Media: Property imagery · www.bridgedatacentres.com

Operator Logo: Operator logo · www.bridgedatacentres.com

Stable identifier: e88d09cb-02f6-4717-b67b-574d2582882a