Vantage Johor campus ↗
Published Date unavailable · Retrieved 2026-09-11
Sedenak campus: 300+ MW IT, three facilities; first facility operating with further development.
Malaysia / Site
Yondr Johor campus · Vantage JHB1
Former Yondr Johor campus; current operator Vantage. Campus capacity is not fully operational capacity.

Site / building photo
Property exterior: Vantage JHB1 Johor campus.
Published date unknown · Captured date unknown · Checked 2026-09-11
Selected from sources checked 2026-09-11 for identity and unobstructed property view; latest capture date cannot be established.
vantage-dc.com · Source and attribution ↗Copyright/trademark belongs to the respective rights holder. Publicly available source; no open reuse license established. External reuse rights unconfirmed. Capture and original image publication dates not independently established; retrieval/upload dates are not capture dates.
Sedenak Tech Park industrial-area reference only, inferred from operator park association. This point does not identify the operator campus or any individual building.. Coordinate precision: area. Street-map detail does not increase the accuracy of the sourced point.
Loading local map…
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| ≥300 MW IT load | Reported design capacity; energized and occupied load not established Planned · cumulative | 2026-09-11 | Reported claim ↗ Excluded from capacity totals. Research retrieval date, not a commissioning or measurement date. Design/full-build capacity is not evidence that all MW are commissioned. Excluded from sums pending capacity and hierarchy review. Former Yondr Johor campus; current operator Vantage. Campus capacity is not fully operational capacity. |
Johor campus sale to Vantage completed.
Supporting source ↗No additional specifications established.
Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-09-11
Sedenak campus: 300+ MW IT, three facilities; first facility operating with further development.
Published 2025-11-24 · Retrieved 2026-09-11
Johor campus sale to Vantage completed.
Published Date unavailable · Retrieved 2026-09-11
Named map object: Taman Perindustrian Kulai, Kulai, Johor, Malaysia. Candidate representative point 1.7000928, 103.4143909; not a surveyed coordinate. © OpenStreetMap contributors, ODbL.
Published Date unavailable · Retrieved 2026-09-11
Property exterior: Vantage JHB1 Johor campus. Image reference: https://vantage-dc.com/wp-content/uploads/2025/11/JHB11_01-1.png Visually inspected against the cited source and profile identity.
Published Date unavailable · Retrieved 2026-09-11
Vantage operator brand mark. Image reference: https://vantage-dc.com/wp-content/uploads/2026/08/Vantage-Logo-Updated-RGB-Reverse-081726-1-1.png Visually inspected against the cited source and profile identity.
Name: Vantage Johor campus
Operator: Vantage Johor campus; Yondr completes Johor campus sale
Country: Vantage Johor campus
Region: Vantage Johor campus
Metro: Vantage Johor campus
City: Vantage Johor campus
Kind: Vantage Johor campus
Statuses: Vantage Johor campus; Yondr completes Johor campus sale
Summary: Vantage Johor campus
Aliases: Vantage Johor campus; Yondr completes Johor campus sale
Location: OpenStreetMap — Taman Perindustrian Kulai; Vantage Johor campus
Media: Property imagery · vantage-dc.com
Operator Logo: Operator logo · vantage-dc.com
Stable identifier: e96b0e29-7a1a-44dc-b612-bf25d633d5d3