South Korea / Facility

KINX Gwacheon Data Center

KINX 과천 데이터센터 · KINX GwaCheon IDC · IDC 과천 · KINX Gwacheon IDC (GC)

Operational

KINX's self-owned, carrier-neutral colocation facility in Gwacheon has reported designed IT capacity of 10 MW. Operator history records opening in October 2024; a November announcement confirms official opening, and subsequent investor materials report service opening completed in December 2024. The data center is separate from the office building on the same property. Capacity describes infrastructure provision rather than measured customer utilization.

Last researched 2026-10-07Last verified Not independently verifiedPublished revision 1
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
KINX Inc.
Ownership
KINX Inc.
Business model / scale
Colocation / Unknown
Region / metro
Gyeonggi-do / Seoul metropolitan area
City / locality
Gwacheon
Address
34, Gwacheon-daero 7na-gil, Galhyeon-dong, Gwacheon-si, Gyeonggi-do, South Korea
Location
Operator street address established; facility point and building footprint not independently geolocated.
Precision: unknown
Parent
Not assigned

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
10 MW
IT load
Gwacheon facility designed primary IT capacity
Operational · cumulative
2024-11-13Reported claim ↗

Excluded from capacity totals. As-of is the dated opening announcement. Design capacity exceeds 5 MW; this is not measured utilization.

10 MW
IT load
Gwacheon facility customer-provided IT capacity
Operational · cumulative
2026-10-07Reported claim ↗

Excluded from capacity totals. As-of is retrieval date because exact presentation publication date was not independently established. Repeats the facility total and overlaps c1.

20 MW
Grid connection
Gwacheon facility primary receiving capacity
Operational · cumulative
2026-10-07Reported claim ↗

Excluded from capacity totals. As-of is retrieval date, not energization date. Operator's receiving-capacity claim includes the 10 MW IT allocation; do not add the two.

20 MW
Grid connection
Separate emergency-only backup receiving capacity
Operational · incremental
2026-10-07Reported claim ↗

Excluded from capacity totals. As-of is retrieval date. Explicitly additional backup for emergencies only; not normal usable IT capacity or evidence of 40 MW operating demand.

Development timeline

  1. 2024-08-21 · actual_completion_approval

    Construction completion approval

    KINX reports receiving completion approval on this date; underlying municipal approval record was not obtained.

    Supporting source ↗
  2. 2024-10 · planned_service_opening

    October opening planned

    August announcement planned service opening after electrical, cooling and network stress tests.

    Supporting source ↗
  3. 2024-10 · actual_opening_reported

    IDC opening recorded in corporate history

    Operator history records October 2024 opening without an exact day.

    Supporting source ↗
  4. 2024-11-13 · announcement

    Official opening announced

    Dated operator release announces the center's official opening; announcement date is not treated as the first service day.

    Supporting source ↗
  5. 2024-12 · actual_service_opening_completion_reported

    Service opening completed

    Later investor presentation reports December completion of service opening, consistent with a staged launch after October's initial opening.

    Supporting source ↗

Disclosed specifications

Reported land area

22,000 m²

Opening release describes this as land area; shared-property boundaries and facility-only allocation are unresolved.

Source ↗

Design PUE

1.300

Design target, not measured operational PUE.

Source ↗

UPS options

2N, N+1, N+C

Configurable customer infrastructure; not a single confirmed configuration across the facility.

Source ↗

Containment

HAC/CAC options

Hot-aisle or cold-aisle containment options; cooling plant technology is undisclosed in the reviewed facility page.

Source ↗

High-power colocation

20 kW+

Operator service capability; not facility-wide average density or a rack-count disclosure.

Source ↗

Floor load

3,000 kg/m²

Operator design claim.

Source ↗

Availability and tier

Up to 99.999%; Tier 3 equivalent

Operator describes redundant configuration. No independently confirmed Uptime Institute certification was obtained.

Source ↗

Connectivity

Carrier-neutral ISP connectivity, CloudHub, cross-connects and KINX DCI

Network/cloud connections do not establish those providers as physical tenants.

Source ↗

Green data center

Operator reports certification

Investor materials describe green data-center design certification; issuing body, identifier and exact scope remain unverified.

Source ↗

Public business contact

sales@kinx.net; +82-2-526-0900, option 1

Published service inquiry contact; no contact attempted.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

KINX Company ↗

Published Date unavailable · Retrieved 2026-10-07

Location section separately identifies headquarters on floor 4 and IDC Gwacheon at 34 Gwacheon-daero 7na-gil, Gwacheon-si, Gyeonggi-do, Korea.

KINX — 데이터센터 ↗

Published Date unavailable · Retrieved 2026-10-07

IDC 과천 address includes Galhyeon-dong; facility services include colocation, IX peering, CloudHub, connectivity and remote hands. Headquarters is listed separately.

KINX Gwacheon IDC ↗

Published Date unavailable · Retrieved 2026-10-07

Official facility page describes Seoul metropolitan accessibility, high-power colocation, configurable UPS and containment, redundant infrastructure and design PUE.

KINX IR Book — Korean investor presentation ↗

Published Date unavailable · Retrieved 2026-10-07

Pages 23–24 report 20 MW receiving capacity, 10 MW customer IT load and separate emergency-only 20 MW backup. Describes KINX-funded construction and operation, separate office building and December 2024 service-opening completion. Exact publication date not established from the filename.

KINX 연결, 그 이상의 특별함 ↗

Published Date unavailable · Retrieved 2026-10-07

Corporate history records Gwacheon IDC opening in October 2024 and headquarters relocation to Gwacheon Galhyeon-dong in September.

KINX Gwacheon IDC (GC) ↗

Published Date unavailable · Retrieved 2026-10-07

Industry directory corroborates facility name, full street address, country and October 2024 opening; its nearest-site distances appear inconsistent with Gwacheon and were not used for geolocation.

Profile field evidence

Name: KINX, 과천 데이터센터 개관…국내 최고의 ‘네트워크 플랫폼 센터’ 제공; KINX Gwacheon IDC

Aliases: KINX — 데이터센터; KINX, 과천 데이터센터 개관…국내 최고의 ‘네트워크 플랫폼 센터’ 제공; KINX Gwacheon IDC; KINX Gwacheon IDC (GC)

Kind: KINX IR Book — Korean investor presentation

Country: KINX Company; KINX Gwacheon IDC (GC)

Region: KINX Company; KINX — 데이터센터

City: KINX Company; KINX — 데이터센터

Metro: KINX Gwacheon IDC

Address: KINX Company; KINX — 데이터센터

Operator: KINX, 과천 데이터센터 개관…국내 최고의 ‘네트워크 플랫폼 센터’ 제공; KINX IR Book — Korean investor presentation; 대우건설, 케이아이엔엑스(KINX)와 손잡고 데이터센터 ‘개발·시공·운영’ 통합 디벨로퍼 도약

Owner: KINX IR Book — English investor presentation

Business Model: KINX — 데이터센터; KINX Gwacheon IDC

Statuses: KINX, 과천 데이터센터 개관…국내 최고의 ‘네트워크 플랫폼 센터’ 제공; KINX IR Book — Korean investor presentation; 대우건설, 케이아이엔엑스(KINX)와 손잡고 데이터센터 ‘개발·시공·운영’ 통합 디벨로퍼 도약

Summary: KINX, 과천 데이터센터 개관…국내 최고의 ‘네트워크 플랫폼 센터’ 제공; KINX IR Book — Korean investor presentation; KINX IR Book — English investor presentation; KINX 연결, 그 이상의 특별함

Location: KINX Company; KINX — 데이터센터

Stable identifier: ecffadeb-7531-44e7-ad9c-c3b24404a46d