Map
Sign in
← AirTrunk JHB2

Published history

Restoring content creates a new revision. Previous revisions remain in the audit trail.

Revision 2 · Current

2026-09-11 12:15 UTC

Published profile snapshot

AirTrunk JHB2 · Malaysia · AirTrunk

Second Johor campus planned for over 270 MW.

Capacity statements: 1 · Sources: 3

270 MW (gt) · unspecified · Reported design capacity; energized and occupied load not established · 2026-09-11

Revision 1

2026-09-11 09:12 UTC

Published profile snapshot

AirTrunk JHB2 · Malaysia · AirTrunk

Second Johor campus planned for over 270 MW.

Capacity statements: 1 · Sources: 1

270 MW (gt) · unspecified · Reported design capacity; energized and occupied load not established · 2026-09-11