Two-building campus in Inzai, Greater Tokyo, with 36 MW of advertised ultimate IT capacity. TKY01A was delivered in October 2024; TKY01B is under construction with Q4 2027 delivery expected. Completion does not independently establish commissioned customer load, and later financing disclosures conflict with the first-building delivery chronology.
Sources and references
Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-10-09
Operator identifies the Inzai campus, two buildings, 36 MW total, and TKY01A/TKY01B at 18 MW each; lists 228,000 sq ft per building and TEPCO supply through a regional substation.
Published Date unavailable · Retrieved 2026-10-09
Japanese operator page explicitly identifies 36 MW as total campus IT capacity; describes 2.3 hectares, dual 66 kV lines, N+2 electrical and cooling redundancy, and seismic isolation.
Published 2022-01-13 · Retrieved 2026-10-09
Announces development with Oaktree-managed funds, two 18 MW buildings, hyperscale and enterprise customers, planned Q2 2022 groundbreaking and Q4 2023 capacity delivery.
Published 2024-10-22 · Retrieved 2026-10-09
Announces first-facility completion and opening at the 36 MW campus, developed through an IPI Partners/Oaktree partnership; describes two 18 MW buildings and second-facility development underway.
Published 2025-10-23 · Retrieved 2026-10-09
Operator release announces green financing, 5.7-acre site and ultimate 36 MW capacity; says first 18 MW will deliver in 2026 and another 18 MW in 2027, conflicting with the 2024 opening announcement.
Published 2026-02-06 · Retrieved 2026-10-09
Reports second-building groundbreaking, an additional standalone 18 MW building, expected Q4 2027 delivery and first-building launch in October 2024; links the operator announcement.
Published Date unavailable · Retrieved 2026-10-09
Public operator post confirms groundbreaking for a second standalone 18 MW building beside the existing 18 MW facility and expected Q4 2027 delivery. Accessible page displays relative age only.
Published Date unavailable · Retrieved 2026-10-09
Undated brochure describes rack-ready, powered-shell and build-to-suit options; 36 MW split into 6 MW READYSTACK, 12 MW POWERSTACK and 18 MW HYPERSTACK. Lists connectivity, target PUE, density and N+1 designs.
Published Date unavailable · Retrieved 2026-10-09
Register explicitly states records are current at March 31, 2025. Lists provisional TKY01 building construction in Inzai; extracted address contains 市原1丁目2番2, requiring reconciliation with reported 原1-2-2.
Published Date unavailable · Retrieved 2026-10-09
Contractor project record corroborates STACK/OCM Inzai TKY01 identity, Nikken Sekkei design and Takenaka construction; its own Moriya business address is not the data-center address.
Profile field evidence
Name: TKY01 — STACK Infrastructure
Aliases: TKY01 — STACK Infrastructure; Inzai / TKY01 — STACK Infrastructure
Kind: TKY01 — STACK Infrastructure
Country: STACK Infrastructure expands APAC footprint with new 36MW campus in Inzai, Japan; STACK Infrastructure Delivers First Data Center in Japan
Region: Chiba Prefecture smoke-emitting facility register
City: STACK Infrastructure expands APAC footprint with new 36MW campus in Inzai, Japan; STACK Infrastructure Delivers First Data Center in Japan; Chiba Prefecture smoke-emitting facility register
Metro: STACK Infrastructure Delivers First Data Center in Japan; STACK Infrastructure Secures ¥39.7 Billion in Green Financing to Advance Development of Tokyo Campus
Operator: STACK Infrastructure expands APAC footprint with new 36MW campus in Inzai, Japan; STACK Infrastructure Delivers First Data Center in Japan
Business Model: Tokyo, Japan TKY01/CAMPUS brochure
Scale: STACK Infrastructure expands APAC footprint with new 36MW campus in Inzai, Japan; STACK Infrastructure Delivers First Data Center in Japan
Statuses: STACK Infrastructure Delivers First Data Center in Japan; Stack breaks ground on second Tokyo data center; STACK Infrastructure — second Inzai data-center groundbreaking announcement
Summary: TKY01 — STACK Infrastructure; Inzai / TKY01 — STACK Infrastructure; STACK Infrastructure Delivers First Data Center in Japan; STACK Infrastructure Secures ¥39.7 Billion in Green Financing to Advance Development of Tokyo Campus; Stack breaks ground on second Tokyo data center; STACK Infrastructure — second Inzai data-center groundbreaking announcement
Location: STACK Infrastructure expands APAC footprint with new 36MW campus in Inzai, Japan; STACK Infrastructure Delivers First Data Center in Japan; Chiba Prefecture smoke-emitting facility register