TKY01 · Inzai / TKY01

OperationalUnder Construction

Two-building campus in Inzai, Greater Tokyo, with 36 MW of advertised ultimate IT capacity. TKY01A was delivered in October 2024; TKY01B is under construction with Q4 2027 delivery expected. Completion does not independently establish commissioned customer load, and later financing disclosures conflict with the first-building delivery chronology.

Last researched 2026-10-09Last verified Not independently verifiedPublished revision 1
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
STACK Infrastructure
Ownership
Unknown / not established
Business model / scale
Colocation / Hyperscale
Region / metro
Chiba Prefecture / Greater Tokyo
City / locality
Inzai
Address
Unknown
Location
Inzai, Chiba Prefecture, Greater Tokyo; locality established by operator and government evidence. No independently corroborated campus point.
Precision: area
Parent
Not assigned

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
36 MW
IT load
Ultimate two-building TKY01 campus
Planned · cumulative
2026-10-09Reported claim ↗

Excluded from capacity totals. Undated operator page retrieved on as_of date explicitly calls this total campus IT capacity; not proof that all 36 MW are commissioned.

18 MW
Unspecified power
First TKY01 building, TKY01A
Operational · incremental
2024-10-22Reported claim ↗

Excluded from capacity totals. As_of is opening/completion announcement date. Release reports 18 MW per building; commissioning and occupied load are not disclosed.

18 MW
Unspecified power
Second campus building, TKY01B
Under Construction · incremental
2026-02-06Reported claim ↗

Excluded from capacity totals. As_of is report publication date; additional standalone building expected Q4 2027. Included within the campus 36 MW, not additional to it.

36 MW
Unspecified power
Fully delivered TKY01 campus
Planned · cumulative
2025-10-23Reported claim ↗

Excluded from capacity totals. As_of is financing release date. Describes ultimate capacity with first 18 MW delivered in 2026 and expansion in 2027; delivery chronology conflicts with the 2024 first-building opening.

6 MW
Unspecified power
Brochure READYSTACK allocation within 36 MW campus
Unknown · incremental
2026-10-09Reported claim ↗

Excluded from capacity totals. As_of is retrieval date of undated brochure, not claim publication or delivery date. Product allocation only; overlaps campus and building totals.

12 MW
Unspecified power
Brochure POWERSTACK allocation within 36 MW campus
Unknown · incremental
2026-10-09Reported claim ↗

Excluded from capacity totals. As_of is retrieval date of undated brochure. Powered-shell allocation does not establish operational IT load; overlaps campus total.

18 MW
Unspecified power
Brochure HYPERSTACK/future-phase allocation within 36 MW campus
Planned · incremental
2026-10-09Reported claim ↗

Excluded from capacity totals. As_of is retrieval date of undated brochure. Future-phase product allocation; relationship to current TKY01B delivery should be reconciled, not added separately.

Development timeline

  1. 2022-01-13 · announcement

    Japan campus development announced

    STACK announces partnership with Oaktree-managed funds for the Inzai campus.

    Supporting source ↗
  2. 2022-Q2 · planned

    Original groundbreaking target

    Initial announcement targeted this quarter; actual start date not established here.

    Supporting source ↗
  3. 2023-Q4 · planned

    Original capacity-delivery target

    Initial target subsequently superseded by later completion and delivery disclosures.

    Supporting source ↗
  4. 2024-10-22 · announcement_actual_completion

    First facility delivered

    Operator announces first-facility completion and opening.

    Supporting source ↗
  5. 2025-10-23 · announcement

    Green financing secured

    ¥39.7 billion financing disclosed; release gives a conflicting first-building 2026 delivery schedule.

    Supporting source ↗
  6. 2026-02-06 · announcement_actual_groundbreaking

    Second-building groundbreaking reported

    Report states operator announced groundbreaking that week; publication date is not an exact ceremony date.

    Supporting source ↗
  7. 2027-Q4 · planned

    TKY01B expected delivery

    Latest opened operator post and industry report expect second-building delivery in this quarter.

    Supporting source ↗

Disclosed specifications

Campus land area

2.3 hectares / approximately 6 acres

Operator Japanese page; financing release separately uses 5.7 acres, consistent with rounding.

Source ↗

Advertised building area

228,000 sq ft each for TKY01A and TKY01B

Current campus cards; area definition and final as-built dimensions not disclosed.

Source ↗

Grid supply

TEPCO regional substation; dual 66 kV extra-high-voltage lines

Supply voltage is not a grid MW capacity claim.

Source ↗

Electrical redundancy

N+2 block redundancy for generators/UPS

Japanese page; undated English brochure instead describes N+1 with optional STS. Design revision unresolved.

Source ↗

Cooling

High-efficiency air-cooled chillers and wall-blowing air handlers, N+2

Japanese page; English brochure lists N+1 chillers. Revision or building scope unresolved.

Source ↗

Fuel storage

Minimum 24 hours

Operator design specification, not independently tested endurance.

Source ↗

Structural design

Base seismic isolation and high-strength steel/CFT

Operator specification.

Source ↗

Connectivity

Two meet-me rooms; three diverse fiber entrances; NTT, KDDI, Colt, Arteria, TEPCO and SoftBank listed

Undated brochure availability claims, not independently verified active connections.

Source ↗

Density and floor loading

Support above 24 kW per cabinet; 20 kN/m² data-hall/access-route floor loading

Brochure design claims, not measured deployed density.

Source ↗

Efficiency

Annualized PUE target 1.30

Design target, not actual measured PUE.

Source ↗

Certification support

ISO 27001 and SSAE18 after commencement of operations

Brochure wording describes support; no current certificate or audit was verified.

Source ↗

Commercial offering

Rack-ready, powered shell and build-to-suit

Supports colocation classification; tenants are not named.

Source ↗

Public business contact

sales@stackinfra.com

Public brochure contact; no contact made.

Source ↗

Development partnership

IPI Partners and Oaktree Capital Management

2024 operator disclosure; does not establish current legal land ownership or ownership percentages.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

TKY01 — STACK Infrastructure ↗

Published Date unavailable · Retrieved 2026-10-09

Operator identifies the Inzai campus, two buildings, 36 MW total, and TKY01A/TKY01B at 18 MW each; lists 228,000 sq ft per building and TEPCO supply through a regional substation.

Inzai / TKY01 — STACK Infrastructure ↗

Published Date unavailable · Retrieved 2026-10-09

Japanese operator page explicitly identifies 36 MW as total campus IT capacity; describes 2.3 hectares, dual 66 kV lines, N+2 electrical and cooling redundancy, and seismic isolation.

Stack breaks ground on second Tokyo data center ↗

Published 2026-02-06 · Retrieved 2026-10-09

Reports second-building groundbreaking, an additional standalone 18 MW building, expected Q4 2027 delivery and first-building launch in October 2024; links the operator announcement.

Tokyo, Japan TKY01/CAMPUS brochure ↗

Published Date unavailable · Retrieved 2026-10-09

Undated brochure describes rack-ready, powered-shell and build-to-suit options; 36 MW split into 6 MW READYSTACK, 12 MW POWERSTACK and 18 MW HYPERSTACK. Lists connectivity, target PUE, density and N+1 designs.

Chiba Prefecture smoke-emitting facility register ↗

Published Date unavailable · Retrieved 2026-10-09

Register explicitly states records are current at March 31, 2025. Lists provisional TKY01 building construction in Inzai; extracted address contains 市原1丁目2番2, requiring reconciliation with reported 原1-2-2.

Profile field evidence

Name: TKY01 — STACK Infrastructure

Aliases: TKY01 — STACK Infrastructure; Inzai / TKY01 — STACK Infrastructure

Kind: TKY01 — STACK Infrastructure

Country: STACK Infrastructure expands APAC footprint with new 36MW campus in Inzai, Japan; STACK Infrastructure Delivers First Data Center in Japan

Region: Chiba Prefecture smoke-emitting facility register

City: STACK Infrastructure expands APAC footprint with new 36MW campus in Inzai, Japan; STACK Infrastructure Delivers First Data Center in Japan; Chiba Prefecture smoke-emitting facility register

Metro: STACK Infrastructure Delivers First Data Center in Japan; STACK Infrastructure Secures ¥39.7 Billion in Green Financing to Advance Development of Tokyo Campus

Operator: STACK Infrastructure expands APAC footprint with new 36MW campus in Inzai, Japan; STACK Infrastructure Delivers First Data Center in Japan

Business Model: Tokyo, Japan TKY01/CAMPUS brochure

Scale: STACK Infrastructure expands APAC footprint with new 36MW campus in Inzai, Japan; STACK Infrastructure Delivers First Data Center in Japan

Statuses: STACK Infrastructure Delivers First Data Center in Japan; Stack breaks ground on second Tokyo data center; STACK Infrastructure — second Inzai data-center groundbreaking announcement

Summary: TKY01 — STACK Infrastructure; Inzai / TKY01 — STACK Infrastructure; STACK Infrastructure Delivers First Data Center in Japan; STACK Infrastructure Secures ¥39.7 Billion in Green Financing to Advance Development of Tokyo Campus; Stack breaks ground on second Tokyo data center; STACK Infrastructure — second Inzai data-center groundbreaking announcement

Location: STACK Infrastructure expands APAC footprint with new 36MW campus in Inzai, Japan; STACK Infrastructure Delivers First Data Center in Japan; Chiba Prefecture smoke-emitting facility register

Stable identifier: ef7a0e00-ceaa-4fd7-9279-132a4e8c76c6