Map
Sign in
← Explore registry

South Korea / Site

Digital Edge SEL5 Ansan

Unknown MWTotal facility power not establishedSee capacity evidence for reported claims.

SEL5 · Digital Edge - Seoul SEL5

Planned

Digital Edge announced land acquisition for SEL5 in Ansan's Sihwa National Industrial Complex on June 8, 2026. The planned hyperscale project is reported at 60 MW, separately backed by a 90 MVA agreement. Its parcel address is supported by secondary property reporting; construction and operation are unconfirmed.

Last researched 2026-10-07Last verified Not independently verifiedPublished revision 1
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
Digital Edge
Ownership
Unknown / not established
Business model / scale
Colocation / Hyperscale
Region / metro
Gyeonggi-do / Seoul Metropolitan Area
City / locality
Ansan
Address
668-1 Seonggok-dong, Danwon-gu, Ansan, Gyeonggi-do, South Korea
Location
Sihwa National Industrial Complex; reported parcel 668-1 Seonggok-dong. No corroborated property-marker coordinates obtained.
Precision: unknown
Parent
Not assigned

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
60 MW
Unspecified power
SEL5 planned development
Planned · unclear
2026-06-08Reported claim ↗

Excluded from capacity totals. As_of is the operator announcement date. Release states 60 MW without expressly defining IT or facility basis or phase allocation; exceeds 5 MW as reported planned capacity.

60 MW
IT load
SEL5 planned project
Planned · unclear
2026-06-09Reported claim ↗

Excluded from capacity totals. As_of is publication date. Secondary caption explicitly labels 60 MW IT capacity; overlaps c1 and must not be added to it.

90 MW
Unspecified power
Ansan development at 668-1 Seonggok-dong
Planned · unclear
2026-04-02Conflicting claim ↗

Excluded from capacity totals. As_of is publication date. Early property report uses 90 MW power-capacity terminology; later operator release states 90 MVA agreement. Unit and basis discrepancy remains unresolved; no conversion or aggregation.

Development timeline

  1. 2026-04-02 · announcement_reported

    Reported joint-development arrangement

    Property press reported Korea Investment Real Asset Management partnering with Digital Edge for the Ansan parcel; legal structure remains unconfirmed.

    Supporting source ↗
  2. 2026-06-08 · announcement

    Land acquisition and power agreement announced

    Digital Edge announced acquired land and a 90 MVA agreement for planned SEL5. Announcement date is not an acquisition closing, groundbreaking or operating date.

    Supporting source ↗

Disclosed specifications

Power agreement

90 MVA

Operator-reported agreement, separate apparent-power unit; no MW conversion and no independent utility confirmation.

Source ↗

Planned power architecture

Dual feeds supported by two independent 154 kV substations

Proposed design; operator cites intended 99.999% availability, not measured performance.

Source ↗

Planned cooling

Advanced liquid cooling; chiller plant with integrated free cooling

Design intent, not installed-system verification.

Source ↗

Target annualized PUE

Below 1.25

Expected design efficiency, not operational measurement.

Source ↗

Land area

16,591.6 m²

Secondary property report; cadastral documentation not obtained.

Source ↗

Reported co-developer

Korea Investment Real Asset Management

Reported by property press; official partnership terms and ownership shares unconfirmed.

Source ↗

Connectivity positioning

Low-latency access to central Seoul

Operator statement; no numeric latency or named carriers disclosed.

Source ↗

Public business contact

info@digitaledgedc.com

General operator contact, not a dedicated SEL5 sales contact.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

Digital Edge - Seoul SEL5 ↗

Published Date unavailable · Retrieved 2026-10-07

Directory lists SEL5 at 668-1 Seonggok-dong, Ansan, with planned status. Body distinguishes 60 MW from 90 MVA despite a 90 MW page title.

Digital Edge SEL5 위치·전력·운영정보 ↗

Published Date unavailable · Retrieved 2026-10-07

Directory categorizes SEL5 as planned hyperscale AI colocation in Gyeonggi, Ansan; says official detailed address and completion date are undisclosed.

South Korea Data Centers in Seoul and Busan ↗

Published Date unavailable · Retrieved 2026-10-07

Operator country page lists other Korean facilities and publishes general contact info@digitaledgedc.com; it does not provide SEL5 specifications.

Profile field evidence

Name: Digital Edge Secures Fully Powered Ansan Data Center Site in Power-Constrained South Korea, Advancing Expansion

Aliases: Digital Edge Secures Fully Powered Ansan Data Center Site in Power-Constrained South Korea, Advancing Expansion; Digital Edge - Seoul SEL5

Kind: Digital Edge Secures Fully Powered Ansan Data Center Site in Power-Constrained South Korea, Advancing Expansion

Country: Digital Edge Secures Fully Powered Ansan Data Center Site in Power-Constrained South Korea, Advancing Expansion

Region: Korea Investment Real Asset Management Partnering with Digital Edge to Promote 90MW Ansan Data Center Project; Digital Edge SEL5 위치·전력·운영정보

City: Digital Edge Secures Fully Powered Ansan Data Center Site in Power-Constrained South Korea, Advancing Expansion; Korea Investment Real Asset Management Partnering with Digital Edge to Promote 90MW Ansan Data Center Project

Metro: Digital Edge, Keppel Add 120MW to Greater Seoul Data Centre Race; Digital Edge - Seoul SEL5

Address: Korea Investment Real Asset Management Partnering with Digital Edge to Promote 90MW Ansan Data Center Project; Digital Edge - Seoul SEL5

Operator: Digital Edge Secures Fully Powered Ansan Data Center Site in Power-Constrained South Korea, Advancing Expansion; Digital Edge SEL5 위치·전력·운영정보

Business Model: Digital Edge SEL5 위치·전력·운영정보

Scale: Digital Edge Secures Fully Powered Ansan Data Center Site in Power-Constrained South Korea, Advancing Expansion

Statuses: Digital Edge Secures Fully Powered Ansan Data Center Site in Power-Constrained South Korea, Advancing Expansion; Digital Edge SEL5 위치·전력·운영정보

Summary: Digital Edge Secures Fully Powered Ansan Data Center Site in Power-Constrained South Korea, Advancing Expansion; Korea Investment Real Asset Management Partnering with Digital Edge to Promote 90MW Ansan Data Center Project

Location: Digital Edge Secures Fully Powered Ansan Data Center Site in Power-Constrained South Korea, Advancing Expansion; Korea Investment Real Asset Management Partnering with Digital Edge to Promote 90MW Ansan Data Center Project; Digital Edge - Seoul SEL5

Stable identifier: f2616dea-88e7-42eb-ab18-42f1b4c05f5f