TM Iskandar Puteri Core Data Centre — supporting evidence ↗
Published Date unavailable · Retrieved 2026-09-11
Cushman & Wakefield H2 2024 lists an 8.2 MW planned IPDC component; TM's two core sites have separately reported expansions.
Malaysia / Facility
Historical market-report component, not asserted current whole-site operating power. Distinct from the newer TM Nxera campus. CSV 13.2 MW upper value not verified.
Named Google Maps site POI matched to facility identity and locality; approximate property location, not independently verified building boundary or entrance.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.
Loading local map…
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| 8.2 MW Unspecified power | Reported design/development capacity; delivered share unconfirmed Planned · cumulative | 2026-09-11 | Reported claim ↗ Excluded from capacity totals. Research retrieval date, not measurement/commissioning date. Excluded from sums pending capacity and hierarchy reconciliation. Historical market-report component, not asserted current whole-site operating power. Distinct from the newer TM Nxera campus. CSV 13.2 MW upper value not verified. |
| 10 MW IT load | IPDC Block 2 expansion only, completed October 2025 per TM annual report Operational · incremental | 2026-09-11 | Reported claim ↗ Excluded from capacity totals. Source-reported design/announced capacity, not measured consumption. Excluded from aggregation pending reconciliation. |
Source-backed research proposal; publication requires review.
Source ↗Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-09-11
Cushman & Wakefield H2 2024 lists an 8.2 MW planned IPDC component; TM's two core sites have separately reported expansions.
Published Date unavailable · Retrieved 2026-09-11
TM's existing IPDC opened in 2017; the 20 MW expansion figure is combined across KVDC and IPDC, not per site.
Published Date unavailable · Retrieved 2026-09-11
IPDC Block 2 completed in October 2025; KVDC/IPDC expansions together add 20 MW IT.
Published Date unavailable · Retrieved 2026-09-11
Consultant identifies IPDC Block 2 West Wing scope as 10 MW IT load.
Published Date unavailable · Retrieved 2026-09-11
Named place result TM Iskandar Puteri Data Centre (IPDC); POI coordinates 1.4349479, 103.5984284. Named Google Maps site POI matched to facility identity and locality; approximate property location, not independently verified building boundary or entrance.
Published Date unavailable · Retrieved 2026-09-11
TM Global operator brand mark. Image reference: https://tmglobal.com.my/sites/default/files/D-TMG-Logo-2X_0.png Visually inspected against the cited source and profile identity.
Name: TM Iskandar Puteri Core Data Centre — supporting evidence
Kind: TM Iskandar Puteri Core Data Centre — supporting evidence
Country: TM Iskandar Puteri Core Data Centre — supporting evidence
Region: TM Iskandar Puteri Core Data Centre — supporting evidence
Metro: TM Iskandar Puteri Core Data Centre — supporting evidence
Operator: TM Iskandar Puteri Core Data Centre — supporting evidence; Telekom Malaysia · 2025 annual report; Hybrid Solution Integrator · IPDC project scope
Statuses: TM Iskandar Puteri Core Data Centre — supporting evidence
Summary: TM Iskandar Puteri Core Data Centre — supporting evidence
Location: Google Maps · TM Iskandar Puteri Data Centre (IPDC)
Operator Logo: Operator logo · tmglobal.com.my
Stable identifier: f624664c-d698-4a0d-ab9d-fa1328195d79