Map
Sign in
← Explore registry

Malaysia / Facility

TM Iskandar Puteri Core Data Centre

Unknown

Historical market-report component, not asserted current whole-site operating power. Distinct from the newer TM Nxera campus. CSV 13.2 MW upper value not verified.

Last researched 2026-09-11Last verified Not independently verifiedPublished revision 3
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
Telekom Malaysia / TM Global
Ownership
Unknown / not established
Business model / scale
Unknown / Unknown
Region / metro
Johor / Johor Bahru
City / locality
Unknown
Address
Unknown
Location
Named Google Maps site POI matched to facility identity and locality; approximate property location, not independently verified building boundary or entrance.
Precision: approximate · 1.4349479, 103.5984284
View location on map →
Parent
Not assigned

Location detail

Named Google Maps site POI matched to facility identity and locality; approximate property location, not independently verified building boundary or entrance.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.

Address unknown

Loading local map…

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
8.2 MW
Unspecified power
Reported design/development capacity; delivered share unconfirmed
Planned · cumulative
2026-09-11Reported claim ↗

Excluded from capacity totals. Research retrieval date, not measurement/commissioning date. Excluded from sums pending capacity and hierarchy reconciliation. Historical market-report component, not asserted current whole-site operating power. Distinct from the newer TM Nxera campus. CSV 13.2 MW upper value not verified.

10 MW
IT load
IPDC Block 2 expansion only, completed October 2025 per TM annual report
Operational · incremental
2026-09-11Reported claim ↗

Excluded from capacity totals. Source-reported design/announced capacity, not measured consumption. Excluded from aggregation pending reconciliation.

Development timeline

  1. No dated milestones established.

Disclosed specifications

Research clarification · 2026-09-11

TM identifies IPDC Block 2 completion in October 2025. Combined 20 MW IT is not duplicated onto each site.

Source-backed research proposal; publication requires review.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

Google Maps · TM Iskandar Puteri Data Centre (IPDC) ↗

Published Date unavailable · Retrieved 2026-09-11

Named place result TM Iskandar Puteri Data Centre (IPDC); POI coordinates 1.4349479, 103.5984284. Named Google Maps site POI matched to facility identity and locality; approximate property location, not independently verified building boundary or entrance.

Operator logo · tmglobal.com.my ↗

Published Date unavailable · Retrieved 2026-09-11

TM Global operator brand mark. Image reference: https://tmglobal.com.my/sites/default/files/D-TMG-Logo-2X_0.png Visually inspected against the cited source and profile identity.

Profile field evidence

Name: TM Iskandar Puteri Core Data Centre — supporting evidence

Kind: TM Iskandar Puteri Core Data Centre — supporting evidence

Country: TM Iskandar Puteri Core Data Centre — supporting evidence

Region: TM Iskandar Puteri Core Data Centre — supporting evidence

Metro: TM Iskandar Puteri Core Data Centre — supporting evidence

Operator: TM Iskandar Puteri Core Data Centre — supporting evidence; Telekom Malaysia · 2025 annual report; Hybrid Solution Integrator · IPDC project scope

Statuses: TM Iskandar Puteri Core Data Centre — supporting evidence

Summary: TM Iskandar Puteri Core Data Centre — supporting evidence

Location: Google Maps · TM Iskandar Puteri Data Centre (IPDC)

Operator Logo: Operator logo · tmglobal.com.my

Stable identifier: f624664c-d698-4a0d-ab9d-fa1328195d79