AIMS Cyberjaya campus — supporting evidence ↗
Published Date unavailable · Retrieved 2026-09-11
Existing Cyberjaya campus designed to reach 50 MW; Block 2 adds 8 MW and Block 3 adds 12 MW.
Malaysia / Site
Missing parent-level record for tracked blocks. Not the separately announced 200 MW flagship site; aggregate overlap remains excluded.

Rendering
Architectural rendering: AIMS Cyberjaya campus.
Published date unknown · Captured date unknown · Checked 2026-09-11
Selected from sources checked 2026-09-11 for identity and unobstructed property view; latest capture date cannot be established.
www.datacenterdynamics.com · Source and attribution ↗Copyright/trademark belongs to the respective rights holder. Publicly available source; no open reuse license established. External reuse rights unconfirmed. Capture and original image publication dates not independently established; retrieval/upload dates are not capture dates.
Existing named AIMS campus reference only; not the newly announced 200 MW parcel.. Coordinate precision: area. Street-map detail does not increase the accuracy of the sourced point.
Loading local map…
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| 50 MW Unspecified power | Reported design/development capacity; delivered share unconfirmed Planned · cumulative | 2026-09-11 | Reported claim ↗ Excluded from capacity totals. Research retrieval date, not measurement/commissioning date. Excluded from sums pending capacity and hierarchy reconciliation. Missing parent-level record for tracked blocks. Not the separately announced 200 MW flagship site; aggregate overlap remains excluded. |
Campus/component relationship for review; capacity may overlap. Parent assignment requires approved campus and a separate versioned child update.
Source ↗Campus/component relationship for review; capacity may overlap. Parent assignment requires approved campus and a separate versioned child update.
Source ↗Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-09-11
Existing Cyberjaya campus designed to reach 50 MW; Block 2 adds 8 MW and Block 3 adds 12 MW.
Published Date unavailable · Retrieved 2026-09-11
AIMS, Cyber 4, Cyberjaya, Sepang, Selangor, Malaysia; representative point 2.9377482, 101.6573784. © OpenStreetMap contributors, ODbL.
Published Date unavailable · Retrieved 2026-09-11
Architectural rendering: AIMS Cyberjaya campus. Image reference: https://media.datacenterdynamics.com/media/images/AIMS__Cyberjaya.2e16d0ba.fill-1200x630.jpg Visually inspected against the cited source and profile identity.
Published Date unavailable · Retrieved 2026-09-11
AIMS operator brand mark. Image reference: https://cdn.baxtel.com/data-centers/aims-data-centre-sdn-bhd/logo/aims-data-centre-sdn-bhd-logo..png Visually inspected against the cited source and profile identity.
Name: AIMS Cyberjaya campus — supporting evidence
Kind: AIMS Cyberjaya campus — supporting evidence
Country: AIMS Cyberjaya campus — supporting evidence
Region: AIMS Cyberjaya campus — supporting evidence
Metro: AIMS Cyberjaya campus — supporting evidence
City: AIMS Cyberjaya campus — supporting evidence
Operator: AIMS Cyberjaya campus — supporting evidence
Statuses: AIMS Cyberjaya campus — supporting evidence
Summary: AIMS Cyberjaya campus — supporting evidence
Location: AIMS Cyberjaya campus — supporting evidence; OpenStreetMap named-campus reference
Media: Property imagery · www.datacenterdynamics.com
Operator Logo: Operator logo · baxtel.com
Stable identifier: f9c9a0d3-717d-4742-aa17-430ea16e2ff9