Map
Sign in
← K2 Strategic Sedenak campus

Published history

Restoring content creates a new revision. Previous revisions remain in the audit trail.

Revision 3 · Current

2026-09-11 12:15 UTC

Published profile snapshot

K2 Strategic Sedenak campus · Malaysia · K2 Strategic

K2 Strategic Kulai campus. The current operator page identifies 60 MW IT for JHR01–03 and 234 MW designed IT capacity for the wider campus. Historic and overlapping facility capacities are retained separately and excluded from totals.

Capacity statements: 3 · Sources: 4

60 MW (exact) · unspecified · Reported initial opened facility within the campus · 2026-09-11

60 MW (exact) · it · JHR01–03 facility group listing; not entire ultimate campus · 2026-09-11

234 MW (exact) · it · Ultimate K2 Kulai campus IT design · 2026-09-11

Revision 2

2026-09-11 11:26 UTC

Published profile snapshot

K2 Strategic Sedenak campus · Malaysia · K2 Strategic

K2 Strategic Kulai campus. The current operator page identifies 60 MW IT for JHR01–03 and 234 MW designed IT capacity for the wider campus. Historic and overlapping facility capacities are retained separately and excluded from totals.

Capacity statements: 3 · Sources: 2

60 MW (exact) · unspecified · Reported initial opened facility within the campus · 2026-09-11

60 MW (exact) · it · JHR01–03 facility group listing; not entire ultimate campus · 2026-09-11

234 MW (exact) · it · Ultimate K2 Kulai campus IT design · 2026-09-11

Revision 1

2026-09-11 10:44 UTC

Published profile snapshot

K2 Strategic Sedenak campus · Malaysia · K2 Strategic

CSV's 234–300 MW ultimate estimate not adopted. 60 MW refers to the opened facility; ultimate campus capacity remains unknown.

Capacity statements: 1 · Sources: 1

60 MW (exact) · unspecified · Reported initial opened facility within the campus · 2026-09-11