DCI H2 Karawang campus — supporting evidence ↗
Published Date unavailable · Retrieved 2026-09-11
DCI lists H2 with two live buildings and 30 MW total IT, scalable to at least 600 MW IT.
Indonesia / Site
CSV-authorized geographic extension outside Jabodetabek. Its 30 MW solar farm is not IT capacity.

Site / building photo
Property exterior: DCI H2 Karawang campus.
Published date unknown · Captured date unknown · Checked 2026-09-11
Selected from sources checked 2026-09-11 for identity and unobstructed property view; latest capture date cannot be established.
dci-indonesia.com · Source and attribution ↗Copyright/trademark belongs to the respective rights holder. Publicly available source; no open reuse license established. External reuse rights unconfirmed. Capture and original image publication dates not independently established; retrieval/upload dates are not capture dates.
Shared campus representative point; individual building positions unresolved.. Coordinate precision: area. Street-map detail does not increase the accuracy of the sourced point.
Loading local map…
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| 30 MW IT load | Operator-reported total IT for two live H2 buildings Operational · cumulative | 2026-09-11 | Reported claim ↗ Excluded from capacity totals. Research retrieval date, not measurement/commissioning date. Excluded from sums pending capacity and hierarchy reconciliation. CSV-authorized geographic extension outside Jabodetabek. Its 30 MW solar farm is not IT capacity. |
| ≥600 MW IT load | Ultimate campus IT expansion envelope; includes live 30 MW, not additive Planned · cumulative | 2026-09-11 | Reported claim ↗ Excluded from capacity totals. Research retrieval date, not measurement/commissioning date. Excluded from sums pending capacity and hierarchy reconciliation. CSV-authorized geographic extension outside Jabodetabek. Its 30 MW solar farm is not IT capacity. |
No additional specifications established.
Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-09-11
DCI lists H2 with two live buildings and 30 MW total IT, scalable to at least 600 MW IT.
Published Date unavailable · Retrieved 2026-09-11
DCI Indonesia (H2-01), Pertiwi Lestari Industrial Estate. Public point -6.404877, 107.254362; directory updated 2025-09-26T23:01:04Z. Not surveyed coordinates.
Published Date unavailable · Retrieved 2026-09-11
Property exterior: DCI H2 Karawang campus. Image reference: https://d2gr9f68xie3i0.cloudfront.net/uploads/media_libraries/1773689072877-pyxkq2.png Visually inspected against the cited source and profile identity.
Published Date unavailable · Retrieved 2026-09-11
DCI Indonesia operator brand mark. Image reference: https://dci-indonesia.com/images/logo/logo-white.svg Visually inspected against the cited source and profile identity.
Name: DCI H2 Karawang campus — supporting evidence
Kind: DCI H2 Karawang campus — supporting evidence
Country: DCI H2 Karawang campus — supporting evidence
Region: DCI H2 Karawang campus — supporting evidence
Metro: DCI H2 Karawang campus — supporting evidence
City: DCI H2 Karawang campus — supporting evidence
Operator: DCI H2 Karawang campus — supporting evidence
Statuses: DCI H2 Karawang campus — supporting evidence
Summary: DCI H2 Karawang campus — supporting evidence
Location: DCI H2 Karawang campus — supporting evidence; PeeringDB named-site geocode
Address: PeeringDB named-site geocode
Media: Property imagery · dci-indonesia.com
Operator Logo: Operator logo · dci-indonesia.com
Stable identifier: fdfc69ea-dfd8-4212-b45a-bfca291082a9