Operational carrier-neutral colocation facility within the Macquarie Park Data Centre Campus in Sydney. The current operator reports 6 MW IT load and 3,200 square metres of technical space. IC3 East and IC3 SuperWest are distinct campus facilities; campus capacity is not assigned to IC2. Land and buildings returned to Macquarie ownership in June 2024.
Last researched 2026-10-09Last verified Not independently verifiedPublished revision 1
No approved site photo yet. Photos and their source dates are published after evidence review.
Site profile
Operator
Macquarie Data Centres
Ownership
Macquarie Technology Group, through a subsidiary of Macquarie Data Centres Group
Business model / scale
Colocation / Unknown
Region / metro
New South Wales / Sydney
City / locality
Macquarie Park
Address
17-23 Talavera Road, Macquarie Park NSW 2113, Australia
Location
PeeringDB facility geocode, corroborated against the operator's campus street address and published Google Maps address link. Building-specific placement has not been independently established; this may represent the shared campus address. Precision: approximate · -33.780842, 151.127275 View location on map →
Parent
Not assigned
Location detail
PeeringDB facility geocode, corroborated against the operator's campus street address and published Google Maps address link. Building-specific placement has not been independently established; this may represent the shared campus address.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.
17-23 Talavera Road, Macquarie Park NSW 2113, Australia
Loading local map…
Capacity evidence
Statements retain their dates, definitions and development scope. Do not add these rows together.
Excluded from capacity totals. Historical FY2019 presentation uses total-load campus framing and labels IC2 10 MW existing; exact publication date unavailable. as_of records retrieval only. May reflect facility rather than IT power; do not combine with 6 MW IT load.
8 MW Unspecified power
IC2 launch-era total capacity Unknown · cumulative
Excluded from capacity totals. Undated launch fact sheet states total capacity without IT/facility/grid definition. as_of is retrieval date only; historical document does not establish current capacity or operational scope.
Excluded from capacity totals. Undated directory page; as_of is retrieval date. Basis unspecified; overlaps historical operator 10 MW claim and needs reconciliation with current 6 MW IT load.
Development timeline
2012-09-21 · actual_opening
Intellicentre 2 opened
DCD reports opening by Prime Minister Julia Gillard on the article date.
Operator identifies IC2 as carrier-neutral enterprise, wholesale and government colocation; reports 6 MW IT load, 3,200 m² technical space and IC2 DRUPS.
Company announcement identifies IC2 and IC3 East land and buildings at 17-23 Talavera Road; A$174 million acquisition through a wholly owned Macquarie Data Centres Group subsidiary. Existing facilities fully built and fitted out.
Undated launch fact sheet reports 8 MW total capacity, target PUE below 1.3, N+1 DRUPS, grey water recycling and air-cooled chillers. Publication date not inferred from URL.
Applicant planning report hosted by NSW identifies Lot 527 DP 752035 at 17-23 Talavera Road, approximately 20,094 m² campus land and separate IC2 loading facilities.