Rotterdam Zestienhoven 1&2 data center | NorthC ↗
Published Date unavailable · Retrieved 2026-10-09
Operator identifies two facilities, shared Tempelhof address, colocation services and combined installed electrical capacity of 7.3 MW.
Netherlands / Facility
Rotterdam Zestienhoven 2 · NL-RTM-03
NorthC's modular second facility at Rotterdam Zestienhoven, in the Rotterdam–The Hague region. The operator factsheet reports 6 MW installed electrical power for building 2; the current combined campus page reports 7.3 MW. Historical expansion figures have different scopes and should not be added. The operator publishes a shared campus address, while an industry directory assigns Hatostraat 58 to building 2.
PeeringDB facility geocode; locality and campus address corroborated by NorthC, but building marker not independently established through property records or accessible Maps evidence.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.
Loading local map…
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| 6 MW Facility power | Rotterdam Zestienhoven 2 installed electrical power Operational · cumulative | 2026-10-09 | Reported claim ↗ Excluded from capacity totals. As-of is retrieval date of an undated operator factsheet, not installation or commissioning date. Installed electrical power is not identified as IT load or actual utilization. |
| 7.3 MW Facility power | Combined Rotterdam Zestienhoven 1&2 campus installed electrical capacity Operational · cumulative | 2026-10-09 | Reported claim ↗ Excluded from capacity totals. As-of is observation date of the undated current operator page. Overlaps building 2's 6 MW; do not add to it. |
| 4.5 MW Unspecified power | Adjacent new modular building and provision for multiple data halls in the Zestienhoven expansion Under Construction · unclear | 2021-03-22 | Reported claim ↗ Excluded from capacity totals. As-of is contractor announcement date. Describes capacity provision rather than commissioned IT load. Relationship to later 6 MW installed electrical figure is unresolved. |
| 4.5 MW Unspecified power | Additional capacity in the 2021 Rotterdam Zestienhoven expansion Planned · incremental | 2021-04-14 | Reported claim ↗ Excluded from capacity totals. As-of is industry article publication date. Article's existing 2 MW baseline differs from later operator building-1 figure of 1.3 MW; do not derive a present campus total. |
Kuijpers announced construction of the adjacent modular expansion; exact groundbreaking date was not stated.
Supporting source ↗Contractor's retrospective account identifies 2021 as the year the expansion was realized; halls were fitted in stages.
Supporting source ↗Kuijpers reported delivery of hall 4 in the 2021 modular expansion.
Supporting source ↗Building 2 section of one factsheet. Another operator-branded campus factsheet reports 2 × 20 kV (N+1); scope/version differences unresolved.
Source ↗Building 2 section. Campus-level immersion cooling statements are not assigned specifically to this building.
Source ↗Design claim; no independent Uptime Tier certification established.
Source ↗Operator claim; does not establish generation origin, hourly matching or PUE.
Source ↗Operator describes interconnection with its Dutch locations; building-specific carrier inventory remains incomplete.
Source ↗Current combined campus page; building-specific validity and certificate scope not inspected. Older factsheet also lists NEN 7510 and ISAE 3402.
Source ↗Council-hosted statement corroborates NorthC participation; actual export commissioning is not established.
Source ↗Platform ownership change confirmed; property owner remains unknown and closing date was not displayed on the opened page.
Source ↗Public operator contact in facility factsheet.
Source ↗Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-10-09
Operator identifies two facilities, shared Tempelhof address, colocation services and combined installed electrical capacity of 7.3 MW.
Published Date unavailable · Retrieved 2026-10-09
Pages 4–5 separately describe building 2: 7,800 m² total area, 3,000 m² data floor and 6 MW installed electrical power; country identified as Netherlands. Publication date not established.
Published Date unavailable · Retrieved 2026-10-09
Facility record identifies NorthC, alias NL-RTM-03, shared Tempelhof address, NL country code and geocode 51.953115, 4.44805; record last updated 2025-09-26.
Published Date unavailable · Retrieved 2026-10-09
Directory lists building 2 at Hatostraat 58 and places it within the Zestienhoven campus and Rotterdam–The Hague metropolitan region.
Published 2021-03-22 · Retrieved 2026-10-09
Main contractor reports construction of an adjacent modular building with provision for multiple halls totaling 4.5 MW; names Constructif, Van Schie, Bureau Bouwkunde and DVT Advies.
Published 2023-09-05 · Retrieved 2026-10-09
Contractor reports hall 4 delivered on September 1, within the Rotterdam Zestienhoven expansion realized in 2021; halls are fitted as needed.
Published 2021-04-14 · Retrieved 2026-10-09
Industry report places the facility in South Holland and describes an additional 4.5 MW and 3,000 m², against a stated existing 2 MW.
Published Date unavailable · Retrieved 2026-10-09
Another operator-branded factsheet repeats 6 MW for Zestienhoven 2 but describes shared 2 × 20 kV grid connections and 4,800 m² combined data floor, differing from the other factsheet.
Published Date unavailable · Retrieved 2026-10-09
Council-hosted statement dated April 17, 2024 identifies NorthC and a separate ING data center as prospective heat sources for the local heat-network initiative.
Published Date unavailable · Retrieved 2026-10-09
Heat-network developer describes planned first connections in Q4 2026 or Q1 2027, subject to progress; does not establish actual commissioning.
Published Date unavailable · Retrieved 2026-10-09
Operator explicitly lists Zestienhoven 2 with the Tempelhof address and offers immediately available regional space; immersion cooling and named customers are discussed at broader regional/campus scope.
Published Date unavailable · Retrieved 2026-10-09
Operator confirms Antin completed acquisition of NorthC from DWS and minority shareholders. This establishes platform ownership change, not property title.
Name: Welcome to our data center Rotterdam Zestienhoven — NorthC factsheet; NorthC Rotterdam Zestienhoven 2 | PeeringDB
Aliases: Welcome to our data center Rotterdam Zestienhoven — NorthC factsheet; NorthC Rotterdam Zestienhoven 2 | PeeringDB
Kind: Welcome to our data center Rotterdam Zestienhoven — NorthC factsheet
Country: Welcome to our data center Rotterdam Zestienhoven — NorthC factsheet; NorthC Rotterdam Zestienhoven 2 | PeeringDB
Region: NorthC Datacenters expands in South Holland | DCD
City: Rotterdam Zestienhoven 1&2 data center | NorthC; NorthC Rotterdam Zestienhoven 2 | PeeringDB
Metro: NorthC Rotterdam Zestienhoven 2 | Data Center Map; AI datacenters in Rotterdam-Den Haag | NorthC
Address: Rotterdam Zestienhoven 1&2 data center | NorthC; Welcome to our data center Rotterdam Zestienhoven — NorthC factsheet; AI datacenters in Rotterdam-Den Haag | NorthC
Operator: Rotterdam Zestienhoven 1&2 data center | NorthC; NorthC Rotterdam Zestienhoven 2 | PeeringDB
Business Model: Rotterdam Zestienhoven 1&2 data center | NorthC
Statuses: Oplevering extra datazaal NorthC Datacenters Rotterdam | Kuijpers; AI datacenters in Rotterdam-Den Haag | NorthC
Summary: Rotterdam Zestienhoven 1&2 data center | NorthC; Welcome to our data center Rotterdam Zestienhoven — NorthC factsheet; NorthC Rotterdam Zestienhoven 2 | Data Center Map; Officiële start bouw uitbreiding NorthC Datacenters Rotterdam | Kuijpers
Location: NorthC Rotterdam Zestienhoven 2 | PeeringDB; Rotterdam Zestienhoven 1&2 data center | NorthC
Stable identifier: 1520ed77-017c-44bb-b156-0575fcbb2f37