Published history

Restoring content creates a new revision. Previous revisions remain in the audit trail.

Revision 4 · Current

2026-09-11 12:15 UTC

Published profile snapshot

The HIVE · Philippines · Beeinfotech PH

Beeinfotech PH operates The HIVE colocation facility in Campus One, Bridgetowne. Newly located operator announcements report Phase 1 transformer energization on December 23, 2024, inauguration on March 18, 2025, and LEED Gold achievement in July 2025. These do not resolve the relationship to earlier operations, conflicting locality descriptions, or power-capacity definitions.

Capacity statements: 5 · Sources: 24

20 MW (gt) · unspecified · The HIVE, advertised AI and traditional colocation capacity · 2026-09-11

20 MW (exact) · unspecified · Lower endpoint of reported 20–22 MW dual-power-supply range · 2025-03-21

22 MW (exact) · unspecified · Upper endpoint of reported 20–22 MW dual-power-supply range · 2025-03-21

50 MW (exact) · unspecified · The HIVE site described by operator as ready to use · 2026-09-11

50 MW (exact) · unspecified · The HIVE infrastructure cooling-design claim · 2026-09-11

Revision 3

2026-09-11 07:52 UTC

Published profile snapshot

The HIVE · Philippines · Beeinfotech PH

Beeinfotech PH operates The HIVE colocation facility in Campus One, Bridgetowne. Newly located operator announcements report Phase 1 transformer energization on December 23, 2024, inauguration on March 18, 2025, and LEED Gold achievement in July 2025. These do not resolve the relationship to earlier operations, conflicting locality descriptions, or power-capacity definitions.

Capacity statements: 5 · Sources: 23

20 MW (gt) · unspecified · The HIVE, advertised AI and traditional colocation capacity · 2026-09-11

20 MW (exact) · unspecified · Lower endpoint of reported 20–22 MW dual-power-supply range · 2025-03-21

22 MW (exact) · unspecified · Upper endpoint of reported 20–22 MW dual-power-supply range · 2025-03-21

50 MW (exact) · unspecified · The HIVE site described by operator as ready to use · 2026-09-11

50 MW (exact) · unspecified · The HIVE infrastructure cooling-design claim · 2026-09-11

Revision 2

2026-09-11 07:48 UTC

Published profile snapshot

The HIVE · Philippines · Beeinfotech PH

Beeinfotech PH operates The HIVE colocation facility in Campus One, Bridgetowne. Newly located operator announcements report Phase 1 transformer energization on December 23, 2024, inauguration on March 18, 2025, and LEED Gold achievement in July 2025. These do not resolve the relationship to earlier operations, conflicting locality descriptions, or power-capacity definitions.

Capacity statements: 5 · Sources: 22

20 MW (gt) · unspecified · The HIVE, advertised AI and traditional colocation capacity · 2026-09-11

20 MW (exact) · unspecified · Lower endpoint of reported 20–22 MW dual-power-supply range · 2025-03-21

22 MW (exact) · unspecified · Upper endpoint of reported 20–22 MW dual-power-supply range · 2025-03-21

50 MW (exact) · unspecified · The HIVE site described by operator as ready to use · 2026-09-11

50 MW (exact) · unspecified · The HIVE infrastructure cooling-design claim · 2026-09-11

Revision 1

2026-09-11 07:44 UTC

Published profile snapshot

The HIVE · Philippines · Beeinfotech PH

Beeinfotech PH operates The HIVE, a carrier-neutral colocation facility occupying Campus One in Bridgetowne. The operator gives a Pasig address, while Robinsons filings describe Campus One as Quezon City. Beeinfotech identifies Boda Data Center as an affiliate; BodaData’s Pasig listing is a probable match, not proof of corporate ownership. Opening reports span 2021, general availability in 2022 and an inauguration in 2025. Power claims have unresolved definitions and scope.

Capacity statements: 5 · Sources: 15

20 MW (gt) · unspecified · The HIVE, advertised AI and traditional colocation capacity · 2026-09-11

20 MW (exact) · unspecified · Lower endpoint of reported 20–22 MW dual-power-supply range · 2025-03-21

22 MW (exact) · unspecified · Upper endpoint of reported 20–22 MW dual-power-supply range · 2025-03-21

50 MW (exact) · unspecified · The HIVE site described by operator as ready to use · 2026-09-11

50 MW (exact) · unspecified · The HIVE infrastructure cooling-design claim · 2026-09-11