Colt Inzai 2 Data Centre ↗
Published Date unavailable · Retrieved 2026-10-09
Operator identifies the second facility on the Inzai campus, fully let, with 15 MW IT power and 5,000 square metres of white space; carrier-neutral and base isolated.
Japan / Facility
Colt Inzai 2 Data Centre · Colt Tokyo Inzai Two · Colt印西データセンター2
Operational Colt DCS hyperscale colocation facility in Chiba New Town, Inzai, in the Tokyo market. The operator identifies it as the second facility on its Inzai campus, currently fully let, with 15 MW of IT capacity. The street address is shared with other campus facilities and does not establish the individual building position.
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| 15 MW IT load | Inzai 2 facility total advertised IT capacity Operational · cumulative | 2026-10-09 | Reported claim ↗ Excluded from capacity totals. As-of is retrieval of an undated current operator page. Advertised capacity is not independently measured occupied load and must not be added to overlapping campus totals. |
| 15 MW IT load | Second Inzai facility at full completion Planned · cumulative | 2016-10-24 | Reported claim ↗ Excluded from capacity totals. As-of is article publication date; historical planned critical IT capacity for the same facility as c1, not additional capacity. |
DCD reported construction had started that week, with opening scheduled for Q4 2017.
Supporting source ↗Operator-hosted release announces completion and first-floor availability for customers; PDF retains a DRAFT heading.
Supporting source ↗Operator body text and specification agree. Website headline also labels this figure gross site area; land area is unresolved.
Source ↗Current specification; historical opening release describes the facility across six floors, potentially reflecting usable floors rather than total storeys.
Source ↗Operator specification. Opening release describes direct expansion cooling.
Source ↗Voltage is not a MW grid capacity claim.
Source ↗Operator-reported specification; measurement period and current achieved result not supplied.
Source ↗Cloud connectivity does not establish either company as an onsite tenant.
Source ↗Operator specification.
Source ↗Operator design claim; not evidence of Uptime Institute Tier certification.
Source ↗Operator claim covering named campus facilities; certificate details not independently checked.
Source ↗Operator data-sheet contact; no contact was initiated.
Source ↗Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-10-09
Operator identifies the second facility on the Inzai campus, fully let, with 15 MW IT power and 5,000 square metres of white space; carrier-neutral and base isolated.
Published Date unavailable · Retrieved 2026-10-09
Japanese operator page confirms local name, Chiba New Town locality, 15 MW IT capacity and fully let status.
Published 2017-10-25 · Retrieved 2026-10-09
Operator-hosted release, marked DRAFT, announces construction completion and first-floor operations on 25 October 2017; describes ten 500-square-metre halls, colocation and DX cooling.
Published Date unavailable · Retrieved 2026-10-09
Industry directory identifies Colt Tokyo Inzai Two at 2 Chome-3-12 Otsuka, 270-1352 Inzai City, Japan; reports 15 MW and seven floors.
Published Date unavailable · Retrieved 2026-10-09
Certificate revised 11 January 2023 groups Inzai One, Two and Three at Inzai Building, 2-3 Otsuka, Inzai-shi, Chiba, Japan. Its stated expiry is 26 April 2025; used for location evidence, not current certification.
Published Date unavailable · Retrieved 2026-10-09
Operator specification lists 15 MW IT, seven-storey reinforced concrete construction, 66 kV receiving system, air cooling, hot aisle containment, backup generation and cloud connectivity.
Published 2016-10-24 · Retrieved 2026-10-09
Reports construction commencement for the second Inzai facility, planned Q4 2017 opening, 15 MW critical IT load and 5,000 square metres server space.
Published 2019-01-15 · Retrieved 2026-10-09
Operator article explicitly identifies Inzai Two as the second facility at its campus on the edge of Tokyo, Japan.
Published Date unavailable · Retrieved 2026-10-09
Operator reports TRUE Zero Waste certification at Tokyo Inzai 1–3; global renewable electricity and PUE figures are portfolio metrics.
Name: Colt Inzai 2 Data Centre; Colt Tokyo Inzai 2 Data Centre — Location Data Sheet
Aliases: Colt Inzai 2 Data Centre; Colt印西データセンター2; Colt Tokyo Inzai Two - Specs
Kind: Colt Inzai 2 Data Centre; Inzai Two hyperscale data center
Country: Colt Technology Services Group Limited — BSI Certificate IS 78946; Colt Tokyo Inzai 2 Data Centre — Location Data Sheet; Inzai Two hyperscale data center
Region: Colt Technology Services Group Limited — BSI Certificate IS 78946
City: Colt Tokyo Inzai Two - Specs; Colt Technology Services Group Limited — BSI Certificate IS 78946
Metro: Colt Inzai 2 Data Centre; Inzai Two hyperscale data center
Address: Colt Tokyo Inzai Two - Specs; Colt Technology Services Group Limited — BSI Certificate IS 78946
Operator: Colt Inzai 2 Data Centre; Colt Data Centre Services Expands Operations in Japan with Completion of Inzai 2 Data Centre
Business Model: Colt Data Centre Services Expands Operations in Japan with Completion of Inzai 2 Data Centre
Scale: Colt Inzai 2 Data Centre; Inzai Two hyperscale data center
Statuses: Colt Inzai 2 Data Centre; Colt Data Centre Services Expands Operations in Japan with Completion of Inzai 2 Data Centre
Summary: Colt Inzai 2 Data Centre; Colt Data Centre Services Expands Operations in Japan with Completion of Inzai 2 Data Centre; Colt Tokyo Inzai Two - Specs; Colt Technology Services Group Limited — BSI Certificate IS 78946; Inzai Two hyperscale data center
Location: Colt Tokyo Inzai Two - Specs; Colt Technology Services Group Limited — BSI Certificate IS 78946
Stable identifier: 17b12353-affb-483b-a686-263aab3a6612