AM4 — Equinix facility page ↗
Published Date unavailable · Retrieved 2026-10-09
Current facility listing gives Science Park 610, Amsterdam, Netherlands; colocation specifications, redundancy, sustainability measures and interconnection products.
Netherlands / Facility
AM4 · Equinix AM4 - Amsterdam, Science Park
Operational Equinix colocation tower at Amsterdam Science Park, opened on 5 July 2017 and adjoining AM3. Current operator specifications and historical full-build plans describe different scopes; power remains unreconciled.

Site / building photo
AM4 property image distributed with Equinix's 5 July 2017 opening announcement; capture date undisclosed.
Published date unknown · Captured date unknown · Checked 2026-10-09
Research-selected property image; reviewer must confirm site identity, suitability and rights before publication.
investor.equinix.com · Source and attribution ↗Operator press-release media distributed through PR Newswire; no general reuse license established. Publication and capture dates were not independently established.
PeeringDB facility geocode; its address matches Equinix's published address. AM3 shares that address, so the point has not been independently established as the AM4 tower marker.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.
Loading local map…
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| ≥20 MW Unspecified power | AM4 directory power category Unknown · unclear | 2026-10-09 | Conflicting claim ↗ Excluded from capacity totals. 20+ MW category observed in live indexing on as_of retrieval date; this is not a capacity commissioning date. Report identified as 2023 by lead, but full document date and power definition could not be checked. |
| 15.28 MW Unspecified power | AM4 total power as described by directory Unknown · unclear | 2026-10-09 | Conflicting claim ↗ Excluded from capacity totals. Undated indexed claim observed on as_of retrieval date; original page blocked with HTTP 403. Total power label does not establish IT/facility/grid basis or current commissioned scope. |
| 20 MW Unspecified power | AM4 provisioned and potential UPS power Unknown · unclear | 2026-10-09 | Reported claim ↗ Excluded from capacity totals. 20,000 kW converted to MW. Undated indexed specifications observed on retrieval date; provisioned and potential figures overlap and must not be added. UPS rating is not established IT load. |
| 30 MW Grid connection | Utility supply described for AM4 near a substation Unknown · unclear | 2026-10-09 | Reported claim ↗ Excluded from capacity totals. Undated indexed statement observed on retrieval date describes N+1 utility supply. Dedicated AM4 versus shared campus scope and contracted/commissioned status are unconfirmed. |
Equinix announced first-phase capacity for 1,555 cabinets.
Supporting source ↗Equinix announced opening at Science Park; subsequent expansion phases were planned rather than documented as complete.
Supporting source ↗Benthem Crouwel records AM4 completion in 2017.
Supporting source ↗Current operator specification; not gross building area.
Source ↗Architect's AM4-specific figure; AM3 separately listed at 18,750 m².
Source ↗Current operator description; architect and historical announcements describe 12 storeys. Floor-count convention unresolved.
Source ↗2017 opening announcement; eight data floors and four planned expansion phases. Current completion unconfirmed.
Source ↗Current operator specification; generator autonomy at least 30 hours at full load.
Source ↗Apparent power rating; do not convert to kW without power factor.
Source ↗Architect reports generated heat can serve other Science Park buildings; actual heat deliveries not quantified.
Source ↗Architect's project certification statement; current certificate validity not checked.
Source ↗Products listed by operator; cloud connectivity does not establish named physical tenants.
Source ↗Operator lists Sweden/Finland wind vPPAs and EU certificates; does not establish continuous carbon-free supply.
Source ↗Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-10-09
Current facility listing gives Science Park 610, Amsterdam, Netherlands; colocation specifications, redundancy, sustainability measures and interconnection products.
Published 2017-07-05 · Retrieved 2026-10-09
Opening announcement identifies AM4 at Science Park beside AM3; initial 1,555 cabinets and planned full-build 4,200 cabinets with four expansion phases.
Published Date unavailable · Retrieved 2026-10-09
Facility record identifies Equinix, address, Science Park campus and geocode 52.354686, 4.958827; record shows last update 26 September 2025.
Published Date unavailable · Retrieved 2026-10-09
Architect distinguishes lower AM3 volumes from AM4 tower; reports AM4 gross floor area 24,000 m², completion 2017, aquifer thermal storage and LEED Gold.
Published Date unavailable · Retrieved 2026-10-09
Service provider identifies facility in Amsterdam, Noord-Holland, Netherlands, operated by Equinix at Science Park 610.
Published Date unavailable · Retrieved 2026-10-09
Live search index exposes AM4 directory row: Science Park 610, Amsterdam, space 10,000+, racks 1,000+, power 20+ MW. Full PDF opening failed because content exceeded tool size limit; publication date was not established from the document.
Published Date unavailable · Retrieved 2026-10-09
Live search index reports 15.28 MW total power at Science Park 610. Original page returned HTTP 403; date, methodology and phase scope unavailable.
Published Date unavailable · Retrieved 2026-10-09
Indexed specifications report 20,000 kW provisioned and potential UPS power and 30 MW utility supply. Opened page yielded almost no readable content; figures are retained with limited evidence quality.
Published 2017-04-03 · Retrieved 2026-10-09
Announced AM4 opening expected in Q3 2017, with first-phase 1,555 cabinets and more than 245,000 gross square feet.
Published 2017-11-21 · Retrieved 2026-10-09
Article presents completed AM4 exterior photography credited to Jannes Linders / Benthem Crouwel Architects.
Published Date unavailable · Retrieved 2026-10-09
AM4 property image distributed with Equinix's 5 July 2017 opening announcement; capture date undisclosed. Original image: https://mma.prnewswire.com/media/530331/New_AM4_International_Business_Exchange.jpg
Name: AM4 — Equinix facility page; Equinix Opens State-of-the-Art Data Center in Amsterdam
Aliases: AM4 — Equinix facility page; Equinix AM4 - Amsterdam, Science Park — PeeringDB
Kind: AM4 — Equinix facility page; Equinix Opens State-of-the-Art Data Center in Amsterdam
Country: AM4 — Equinix facility page; Equinix Opens State-of-the-Art Data Center in Amsterdam
Region: Remote hands at Equinix AM4 - Amsterdam, Science Park — Layer One
City: AM4 — Equinix facility page
Metro: Equinix AM4 - Amsterdam, Science Park — PeeringDB; Equinix Extends the Digital Edge for Companies with Five New Data Centers and 14 Expansions Opening in 2017
Address: AM4 — Equinix facility page; Equinix AM4 - Amsterdam, Science Park — PeeringDB
Operator: AM4 — Equinix facility page; Equinix Opens State-of-the-Art Data Center in Amsterdam; Remote hands at Equinix AM4 - Amsterdam, Science Park — Layer One
Business Model: AM4 — Equinix facility page
Statuses: AM4 — Equinix facility page; Equinix Opens State-of-the-Art Data Center in Amsterdam
Location: Equinix AM4 - Amsterdam, Science Park — PeeringDB; AM4 — Equinix facility page
Summary: AM4 — Equinix facility page; Equinix Opens State-of-the-Art Data Center in Amsterdam; Data center Equinix AM3/AM4 — Benthem Crouwel
Stable identifier: 23b11004-0272-4708-8a49-564be73afc19