Revision 1 · Current
2026-10-09 03:38 UTC
Published profile snapshot
Equinix AM4 · Netherlands · Equinix
Operational Equinix colocation tower at Amsterdam Science Park, opened on 5 July 2017 and adjoining AM3. Current operator specifications and historical full-build plans describe different scopes; power remains unreconciled.
Capacity statements: 4 · Sources: 11
20 MW (gte) · unspecified · AM4 directory power category · 2026-10-09
15.28 MW (exact) · unspecified · AM4 total power as described by directory · 2026-10-09
20 MW (exact) · unspecified · AM4 provisioned and potential UPS power · 2026-10-09
30 MW (exact) · grid · Utility supply described for AM4 near a substation · 2026-10-09