Map
Sign in
← Equinix AM4

Published history

Restoring content creates a new revision. Previous revisions remain in the audit trail.

Revision 1 · Current

2026-10-09 03:38 UTC

Published profile snapshot

Equinix AM4 · Netherlands · Equinix

Operational Equinix colocation tower at Amsterdam Science Park, opened on 5 July 2017 and adjoining AM3. Current operator specifications and historical full-build plans describe different scopes; power remains unreconciled.

Capacity statements: 4 · Sources: 11

20 MW (gte) · unspecified · AM4 directory power category · 2026-10-09

15.28 MW (exact) · unspecified · AM4 total power as described by directory · 2026-10-09

20 MW (exact) · unspecified · AM4 provisioned and potential UPS power · 2026-10-09

30 MW (exact) · grid · Utility supply described for AM4 near a substation · 2026-10-09