Finland / Site

Honkaluoto Pori data center

Unknown MWTotal facility power not establishedSee capacity evidence for reported claims.

Polarnode Pori · Polarnode Pori Honkaluoto

Planned

Planned data-center development on Honkaluoto industrial plot 609-80-20-1 in Pori, Finland. Municipal plans describe three phased buildings and approximately 150 MW of unspecified power; Polarnode lists 150 MW maximum available grid capacity. A June 2026 sale agreement names no buyer. Permits and secured grid capacity are reported, but construction or operation was not established.

Last researched 2026-10-07Last verified Not independently verifiedPublished revision 1
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
Unknown
Ownership
Unknown / not established
Business model / scale
Unknown / Unknown
Region / metro
Satakunta / Unknown
City / locality
Pori
Address
Unknown
Location
Municipal records identify Honkaluoto plot 609-80-20-1, management area 609-00386; no corroborated geographic point obtained.
Precision: unknown
Parent
Not assigned

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
≈150 MW
Unspecified power
Entire Honkaluoto data-center project described in municipal lease material
Planned · cumulative
2025-11-10Reported claim ↗

Excluded from capacity totals. As-of is council meeting date. Power basis is not stated; three buildings are phased and no per-building MW is disclosed.

150 MW
Grid connection
Maximum available grid capacity for Pori project
Planned · unclear
2026-10-07Reported claim ↗

Excluded from capacity totals. As-of is retrieval date of undated developer page, not a dated grid-connection agreement. Maximum available capacity is not operational IT load and may overlap c1.

>100 MW
Unspecified power
Pori project announced June 2025
Planned · cumulative
2025-06-09Reported claim ↗

Excluded from capacity totals. As-of is announcement date. Historical project-size threshold; overlaps later 150 MW claims and must not be added.

Development timeline

  1. 2025-06-09 · announcement

    Honkaluoto project announced

    Developer announced cooperation with Pori for a project exceeding 100 MW on 26 ha of city-owned land.

    Supporting source ↗
  2. early 2026 · planned

    Construction-readiness target

    Finnish announcement targeted construction readiness, not completion or commissioning; subsequent reporting states permits were secured.

    Supporting source ↗
  3. 2025-11-10 · actual

    Municipal lease approval

    Council approved leasing plot 609-80-20-1 to Polarnode Pori Oy subject to stated execution conditions; signed lease was not inspected.

    Supporting source ↗
  4. 2026-06-12 · announcement

    Sale agreement announced

    Polarnode announced an agreement with an undisclosed European operator and reported legally valid permits and secured grid capacity.

    Supporting source ↗

Disclosed specifications

Original developer

Polarnode / Polarnode Pori Oy

Development and municipal lease applicant; current operator is undisclosed.

Source ↗

Property identifier

609-80-20-1; management area 609-00386

Municipally identified Honkaluoto site.

Source ↗

Plot area

262,559 m²

Municipal lease terms; developer rounds the site to 26 ha.

Source ↗

Phased buildings

Three data-center buildings, approximately 17,000 k-m² each

Proposed gross floor-area figures, not completed buildings or white-space area.

Source ↗

Lease construction obligation

53,600 k-m²

Municipal contractual requirement; not interchangeable with the approximate building-area plan.

Source ↗

First-phase electrical infrastructure

Proposed connection through Impola substation; on-site substation in phase 1

Municipal planning description, not proof of an energized connection.

Source ↗

Heat recovery

Letter of intent with Pori Energia for district-heating use

Municipality explicitly described the 2025 letter as nonbinding; actual heat delivery is unknown.

Source ↗

Utilities and connectivity availability

Connectivity, water/sewerage and waste-heat utilisation available to site

Undated developer marketing specifications; providers, delivered services and technical designs unspecified.

Source ↗

Time to power

Maximum 2 years

Undated relative developer claim with no disclosed start date; not a commissioning commitment.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

Pori — Polarnode ↗

Published Date unavailable · Retrieved 2026-10-07

Search-indexed developer page identifies Pori, Finland, a 26 ha plot, legally valid permitting and maximum available grid capacity of 150 MW. Direct opens failed.

Polarnode divests Pori data center project ↗

Published 2026-06-12 · Retrieved 2026-10-07

Search-indexed developer announcement reports an agreement to sell to an undisclosed European operator, legally valid zoning/building permits and secured grid capacity. Direct opens failed.

Polarnode suunnittelee mittavaa datakeskushanketta Poriin ↗

Published 2025-06-09 · Retrieved 2026-10-07

Search-indexed Finnish announcement identifies city-owned Honkaluoto land, a 26 ha project exceeding 100 MW, and an early-2026 target for construction readiness rather than completed operation. Direct open failed.

Profile field evidence

Name: Pori City Council 10 November 2025 §161: leasing Honkaluoto plot 609-80-20-1 for Polarnode Pori Oy data center; Pori — Polarnode

Aliases: Pori City Council 10 November 2025 §161: leasing Honkaluoto plot 609-80-20-1 for Polarnode Pori Oy data center; Pori economic and environmental department financial report 02/2026

Kind: Pori City Council 10 November 2025 §161: leasing Honkaluoto plot 609-80-20-1 for Polarnode Pori Oy data center

Country: Pori — Polarnode; Krogerus advises Polarnode on the divestment of its Pori data center project

Region: Pori — Association of Finnish Local and Regional Authorities

City: Pori City Council 10 November 2025 §161: leasing Honkaluoto plot 609-80-20-1 for Polarnode Pori Oy data center; Pori — Polarnode

Statuses: Polarnode divests Pori data center project; Pori economic and environmental department financial report 02/2026

Location: Pori City Council 10 November 2025 §161: leasing Honkaluoto plot 609-80-20-1 for Polarnode Pori Oy data center

Summary: Pori City Council 10 November 2025 §161: leasing Honkaluoto plot 609-80-20-1 for Polarnode Pori Oy data center; Pori — Polarnode; Polarnode divests Pori data center project; Krogerus advises Polarnode on the divestment of its Pori data center project; Pori economic and environmental department financial report 02/2026

Stable identifier: 40f921cc-81c9-488e-b6b3-68d65dbcc2f6