Revision 1 · Current
2026-10-09 14:21 UTC
Published profile snapshot
CDC Hume Campus Two · Australia · CDC Data Centres
CDC campus in Hume, Canberra, separate from Hume Campus One. The operator reports 51 MW current operating capacity for HU4/HU5 without identifying IT, facility or grid basis. The 26 March 2026 investor presentation identifies HU6 as under construction within Hume Two. The proposed address follows PeeringDB; alternative street addresses remain unresolved. Ownership is attributed to CDC at group level, not a verified legal titleholder.
Capacity statements: 3 · Sources: 17
51 MW (exact) · unspecified · Hume Campus Two operating HU4/HU5 campus capacity · 2026-10-09
25 MW (exact) · unspecified · Hume Campus Two H4 total project capacity · 2026-10-09
25 MW (exact) · unspecified · Campus Two Building 2 in BSE's engineering account · 2026-10-09