Digital Realty's second South Korean facility is being developed in Gimpo, separately from ICN10 in Seoul. The operator announced up to 64 MW of critical IT capacity in 2021. Subsequent construction reporting retains a 64 MW total IT design; no operational capacity or opening was established. October 2026 reporting gives September 18, 2028 as the amended construction-contract end date, not a confirmed service commencement date.
Sources and references
Source attribution does not imply independent verification or permission to reuse images.
Published 2021-07-29 · Retrieved 2026-10-07
Operator release identifies ICN11 in Gurae-dong, Gimpo, South Korea; announces land acquisition, up to 64 MW critical IT capacity, approximately 970,000 square feet and a historical first-half-2023 operational forecast. Describes a carrier-neutral customer campus.
Published 2026-07-14 · Retrieved 2026-10-07
Accessible KRX disclosure identifies ICN11 Data Center, Digital Seoul 2 Ltd. as counterparty, DL E&C as contractor, Gyeonggi-do Gimpo Gurae-dong 6877-9 as project location, and a contract running from May 25, 2025 to October 24, 2027. This schedule predates later amendments.
Published Date unavailable · Retrieved 2026-10-07
Greater Seoul market report lists Digital Seoul 2 (ICN11), Gimpo, Digital Realty, 95,051 square metres, 10.6 MW with 64 MW total capacity, and UC status in significant construction updates. Exact publication day is not displayed in the accessed text.
Published 2026-10-04 · Retrieved 2026-10-07
News report cites the October 2 amended disclosure: ICN11 is being built in Gimpo for Digital Seoul 2 Ltd.; 64 MW IT load, four basement and eight above-ground levels, amended construction-contract end September 18, 2028. Reports KRW657,448,735,562 excluding VAT.
Published Date unavailable · Retrieved 2026-10-07
Project consultant identifies ICN11, DL E&C, the parcel 6877-9 Gurae-dong, Gimpo, an area of 94,928.53 square metres and two basement/eight above-ground levels; undated and inconsistent with later four-basement reporting.
Published Date unavailable · Retrieved 2026-10-07
Lists ICN11 in Gimpo with Digital Realty, 95,051 square metres and 64 MW IT load, explicitly identifying Phase 1 as 10.6 MW. Exact publication day unavailable.
Published Date unavailable · Retrieved 2026-10-07
Directory corroborates alias, parcel address and under-construction classification. Its historical timeline is not treated as current construction verification.
Published 2026-10-02 · Retrieved 2026-10-07
Secondary disclosure reproduction identifies Digital Seoul 2 Ltd., parcel 6877-9 Gurae-dong and amended contract period May 25, 2025–September 18, 2028. Linked original DART filing could not be fetched.
Profile field evidence
Name: Digital Realty to Extend Global Reach of PlatformDIGITAL with Development of 64-Megawatt Facility in South Korea; Seoul Data Centre MarketBeat, 2H 2025
Aliases: Digital Realty to Extend Global Reach of PlatformDIGITAL with Development of 64-Megawatt Facility in South Korea; [ICN11] Gimpo Data Center — C5PLAN-G project portfolio; 6877-9 Gurae-dong (ICN11) — Data Center Map
Kind: Digital Realty to Extend Global Reach of PlatformDIGITAL with Development of 64-Megawatt Facility in South Korea; [ICN11] Gimpo Data Center — C5PLAN-G project portfolio
Country: Digital Realty to Extend Global Reach of PlatformDIGITAL with Development of 64-Megawatt Facility in South Korea
Region: DL: corrected construction supply contract disclosure; [ICN11] Gimpo Data Center — C5PLAN-G project portfolio
City: Digital Realty to Extend Global Reach of PlatformDIGITAL with Development of 64-Megawatt Facility in South Korea; DL: corrected construction supply contract disclosure; Seoul Data Centre MarketBeat, 2H 2025
Metro: Seoul Data Centre MarketBeat, 2H 2025
Address: DL: corrected construction supply contract disclosure; [ICN11] Gimpo Data Center — C5PLAN-G project portfolio
Operator: Digital Realty to Extend Global Reach of PlatformDIGITAL with Development of 64-Megawatt Facility in South Korea; Seoul Data Centre MarketBeat, 2H 2025
Business Model: Digital Realty to Extend Global Reach of PlatformDIGITAL with Development of 64-Megawatt Facility in South Korea; 6877-9 Gurae-dong (ICN11) — Data Center Map
Statuses: Seoul Data Centre MarketBeat, 2H 2025; DL E&C expands Gimpo data-centre contract to KRW657.4 billion
Location: DL: corrected construction supply contract disclosure; [ICN11] Gimpo Data Center — C5PLAN-G project portfolio
Summary: Digital Realty to Extend Global Reach of PlatformDIGITAL with Development of 64-Megawatt Facility in South Korea; Seoul Data Centre MarketBeat, 2H 2025; DL E&C expands Gimpo data-centre contract to KRW657.4 billion; DL E&C corrected supply contract, October 2, 2026 — disclosure summary