Datacenter Aalsmeer

OperationalUnder Construction

Operational colocation facility in Hornmeer, Aalsmeer, with an expansion reported underway. NorthC reports 14 MW installed electrical power; additional IT-load phases are separate claims.

Last researched 2026-10-09Last verified Not independently verifiedPublished revision 1
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
NorthC Datacenters
Ownership
Unknown / not established
Business model / scale
Colocation / Unknown
Region / metro
Noord-Holland / Amsterdam metropolitan region
City / locality
Aalsmeer
Address
Lakenblekerstraat 13, 1431 GE Aalsmeer
Location
Operator and permits establish the street address; a property point was not corroborated.
Precision: unknown
Parent
Not assigned

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
14 MW
Facility power
Aalsmeer facility installed electrical power
Operational · cumulative
2026-10-09Reported claim ↗

Excluded from capacity totals. As-of date is retrieval of an undated operator page, not installation or commissioning date. Facility basis represents installed electrical power, not IT load or measured consumption.

2.4 MW
IT load
Aalsmeer expansion phase 1 additional IT load
Operational · incremental
2026-10-09Reported claim ↗

Excluded from capacity totals. Retrieval-date observation of an undated update reporting completion at end-2025. Relationship to 14 MW installed electrical power is not reconciled.

2.4 MW
IT load
Aalsmeer expansion phase 2 additional IT load
Under Construction · incremental
2026-10-09Reported claim ↗

Excluded from capacity totals. Retrieval-date observation of an undated update reporting construction started and infrastructure connection planned for Q1 2027. Subsequent completion unconfirmed; video description separately targets Q3/Q4 2026 completion.

14 MW
Unspecified power
Directory-defined fully built-out Aalsmeer power
Unknown · cumulative
2026-10-09Conflicting claim ↗

Excluded from capacity totals. Retrieval date; undated directory labels the operator's numerical figure as fully built-out power without establishing its electrical basis. Retained as a scope discrepancy, not additional capacity.

Development timeline

  1. 2024-09-04 · announcement

    Southeast expansion permit published

    Municipality published approval for expansion at the existing datacenter address.

    Supporting source ↗
  2. end-2025 · actual_reported

    Phase 1 completed

    Operator reports completion and availability of additional IT capacity and data floor.

    Supporting source ↗
  3. Q3/Q4 2026 · planned

    Phase 2 completion target in video description

    NorthC video description gives this completion window; actual completion is unconfirmed.

    Supporting source ↗
  4. Q1 2027 · planned

    Phase 2 infrastructure connection

    Operator expansion page schedules connection to existing infrastructure; may represent a different milestone from construction completion.

    Supporting source ↗
  5. 2025-12-11 · announcement

    Antin acquisition agreement

    Platform-level agreement to acquire NorthC from DWS and minority shareholders.

    Supporting source ↗
  6. 2026-02-05 · actual

    ACM acquisition approval

    Regulator approved Antin's indirect acquisition of NorthC.

    Supporting source ↗
  7. 2026-03-19 · announcement

    APG minority investment agreement

    APG announced a proposed 37.5% platform stake, subject to regulatory clearance.

    Supporting source ↗

Disclosed specifications

Total area

14,700 m²

Operator's total-area label; land versus gross building area and expansion inclusion are unresolved.

Source ↗

Data-floor area

4,600 m²

Undated factsheet; current expanded total unconfirmed.

Source ↗

Expansion data floor

1,800 m² per phase

Phase 1 reported complete; phase 2 under construction. Do not automatically add to the older factsheet area.

Source ↗

Floor loading

1,000 kg/m²

Operator specification.

Source ↗

Electrical infrastructure

3 × 10 kV grid connections, N+1; DRUPS N+2

Voltage and redundancy specifications do not establish grid MW capacity.

Source ↗

Cooling

Chilled water; redundant free cooling with cooling towers; N+1

Undated operator specification.

Source ↗

Connectivity

Carrier/cloud neutral; redundant connectivity; A and B meet-me rooms; Region Connect Ring

Specific current carriers and available port capacities unconfirmed.

Source ↗

Design standard

Built to Tier 3 standard

Operator design claim; formal Tier certification not established.

Source ↗

Renewable electricity

100% certified green electricity

Operator claim; procurement and accounting methodology unexamined.

Source ↗

Heat reuse

Energy Hub Aalsmeer waste-heat and cold exchange

Project describes returning cooled water to NorthC for data-room cooling.

Source ↗

BREEAM office certification history

Very Good, 57.74%; expired 21 October 2022

Applies to 1,213 m² office area; does not establish current whole-facility certification.

Source ↗

Public business contact

088 623 3000; support@northcdatacenters.com

Published operator factsheet contact; no contact made.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

Datacenter Aalsmeer - Regio Amsterdam | NorthC ↗

Published Date unavailable · Retrieved 2026-10-09

Identifies the operating Aalsmeer facility, Hornmeer address, Amsterdam metropolitan location, 14 MW installed electrical power and colocation services.

Update over de uitbreiding van onze datacenters | NorthC ↗

Published Date unavailable · Retrieved 2026-10-09

Reports phase 1 completed at end-2025 with 2.4 MW additional IT load and 1,800 m² data floor; phase 2 started with the same additions and infrastructure connection planned for Q1 2027. No explicit publication date established.

NorthC Datacenters - Kantoor Aalsmeer | BREEAM-NL ↗

Published Date unavailable · Retrieved 2026-10-09

Office-area record at the same address refers historically to datacenter Amsterdam 2 (Aalsmeer); certificate expired 21 October 2022 and covers 1,213 m² office space.

Project | Energy Hub Aalsmeer ↗

Published Date unavailable · Retrieved 2026-10-09

Project describes NorthC supplying waste heat through a water ring and receiving cooled water for data-room cooling; municipality initiated the project.

Antin to acquire NorthC from DWS ↗

Published 2025-12-11 · Retrieved 2026-10-09

Announces acquisition agreement for the NorthC platform, then subject to regulatory approval and expected to close in H1 2026.

NorthC Aalsmeer - Specs | Data Center Map ↗

Published Date unavailable · Retrieved 2026-10-09

Industry directory corroborates name, address and Netherlands; labels 14 MW as fully built-out power, unlike the operator's installed-electrical wording.

Profile field evidence

Name: Datacenter Aalsmeer - Regio Amsterdam | NorthC; NorthC Aalsmeer - Specs | Data Center Map

Aliases: Datacenter Aalsmeer - Regio Amsterdam | NorthC

Kind: Datacenter Aalsmeer - Regio Amsterdam | NorthC; Gemeenteblad 2024, 378964 — Aalsmeer datacenter expansion permit

Country: NorthC Aalsmeer - Specs | Data Center Map

Region: Gemeenten | Provincie Noord-Holland

City: Datacenter Aalsmeer - Regio Amsterdam | NorthC; Gemeenteblad 2024, 378964 — Aalsmeer datacenter expansion permit

Metro: Datacenter Aalsmeer - Regio Amsterdam | NorthC

Address: Datacenter Aalsmeer - Regio Amsterdam | NorthC; Gemeenteblad 2024, 378964 — Aalsmeer datacenter expansion permit; Omgevingsvergunning aanleg alternatieve waterberging — 2024-015515

Operator: Datacenter Aalsmeer - Regio Amsterdam | NorthC; Omgevingsvergunning aanleg alternatieve waterberging — 2024-015515

Business Model: Datacenter Aalsmeer - Regio Amsterdam | NorthC

Statuses: Datacenter Aalsmeer - Regio Amsterdam | NorthC; Update over de uitbreiding van onze datacenters | NorthC

Summary: Datacenter Aalsmeer - Regio Amsterdam | NorthC; Update over de uitbreiding van onze datacenters | NorthC

Location: Datacenter Aalsmeer - Regio Amsterdam | NorthC; Gemeenteblad 2024, 378964 — Aalsmeer datacenter expansion permit

Stable identifier: 5507be5a-3f3d-4e3e-ac71-cbdddedaaeaf