Operational colocation facility in Hornmeer, Aalsmeer, with an expansion reported underway. NorthC reports 14 MW installed electrical power; additional IT-load phases are separate claims.
Sources and references
Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-10-09
Identifies the operating Aalsmeer facility, Hornmeer address, Amsterdam metropolitan location, 14 MW installed electrical power and colocation services.
Published Date unavailable · Retrieved 2026-10-09
Reports phase 1 completed at end-2025 with 2.4 MW additional IT load and 1,800 m² data floor; phase 2 started with the same additions and infrastructure connection planned for Q1 2027. No explicit publication date established.
Published Date unavailable · Retrieved 2026-10-09
Undated operator factsheet lists 14 MW installed electrical power, 14,700 m² total area, 4,600 m² data floor, electrical redundancy, cooling and connectivity specifications.
Published 2024-09-04 · Retrieved 2026-10-09
Municipality records approval for expansion of the existing datacenter on its southeast side at Lakenblekerstraat 13; case Z2024-00000697.
Published Date unavailable · Retrieved 2026-10-09
Rijnland decision signed 11 September 2024 grants NorthC DataCenters B.V. permission for expansion-related water storage at the facility address; describes 2,207 m² additional hard surface and 122 m³ storage.
Published Date unavailable · Retrieved 2026-10-09
Province lists Aalsmeer among Noord-Holland municipalities.
Published Date unavailable · Retrieved 2026-10-09
Office-area record at the same address refers historically to datacenter Amsterdam 2 (Aalsmeer); certificate expired 21 October 2022 and covers 1,213 m² office space.
Published Date unavailable · Retrieved 2026-10-09
Project describes NorthC supplying waste heat through a water ring and receiving cooled water for data-room cooling; municipality initiated the project.
Published 2025-12-11 · Retrieved 2026-10-09
Announces acquisition agreement for the NorthC platform, then subject to regulatory approval and expected to close in H1 2026.
Published 2026-02-09 · Retrieved 2026-10-09
ACM approved the indirect NorthC acquisition on 5 February 2026; this is approval rather than proof of closing.
Published 2026-03-19 · Retrieved 2026-10-09
States Antin acquired 100% from DWS and APG agreed to acquire 37.5%, subject to regulatory clearance. Does not establish site real-estate ownership or subsequent APG closing.
Published Date unavailable · Retrieved 2026-10-09
NorthC video description reports two 2.4 MW IT-load expansion phases and targets phase 2 completion in Q3/Q4 2026; footage itself was not inspected.
Published Date unavailable · Retrieved 2026-10-09
Industry directory corroborates name, address and Netherlands; labels 14 MW as fully built-out power, unlike the operator's installed-electrical wording.
Profile field evidence
Name: Datacenter Aalsmeer - Regio Amsterdam | NorthC; NorthC Aalsmeer - Specs | Data Center Map
Aliases: Datacenter Aalsmeer - Regio Amsterdam | NorthC
Kind: Datacenter Aalsmeer - Regio Amsterdam | NorthC; Gemeenteblad 2024, 378964 — Aalsmeer datacenter expansion permit
Country: NorthC Aalsmeer - Specs | Data Center Map
Region: Gemeenten | Provincie Noord-Holland
City: Datacenter Aalsmeer - Regio Amsterdam | NorthC; Gemeenteblad 2024, 378964 — Aalsmeer datacenter expansion permit
Metro: Datacenter Aalsmeer - Regio Amsterdam | NorthC
Address: Datacenter Aalsmeer - Regio Amsterdam | NorthC; Gemeenteblad 2024, 378964 — Aalsmeer datacenter expansion permit; Omgevingsvergunning aanleg alternatieve waterberging — 2024-015515
Operator: Datacenter Aalsmeer - Regio Amsterdam | NorthC; Omgevingsvergunning aanleg alternatieve waterberging — 2024-015515
Business Model: Datacenter Aalsmeer - Regio Amsterdam | NorthC
Statuses: Datacenter Aalsmeer - Regio Amsterdam | NorthC; Update over de uitbreiding van onze datacenters | NorthC
Summary: Datacenter Aalsmeer - Regio Amsterdam | NorthC; Update over de uitbreiding van onze datacenters | NorthC
Location: Datacenter Aalsmeer - Regio Amsterdam | NorthC; Gemeenteblad 2024, 378964 — Aalsmeer datacenter expansion permit