VITRO Makati 2 Data Center · VM2 · ePLDT VITRO Makati 2

Operational

Operational VITRO colocation facility in Makati, opened by ePLDT in July 2016. Operator literature lists 12.3 MW IT capacity; February 2023 reporting describes expansion to 20 MW total power. These figures have different stated bases and must not be added. Current property ownership and corporate restructuring need confirmation.

Last researched 2026-09-11Last verified Not independently verifiedPublished revision 1
Property image listed by Baxtel as PLDT's second data center in Makati; displayed listing date is not an established capture date.

Site / building photo

Property image listed by Baxtel as PLDT's second data center in Makati; displayed listing date is not an established capture date.

Published date unknown · Captured date unknown · Checked 2026-09-11

Research-selected property image; reviewer must confirm site identity, suitability and rights before publication.

baxtel.com · Source and attribution ↗
Image rights and date notes

Baxtel photo listing; photographer and reusable license not established. Permission and visual suitability require review. Publication and capture dates were not independently established.

Site profile

Operator
VITRO Inc. / VITRO REIT, Inc. (ePLDT group; corporate-name transition requires reconciliation)
Ownership
Unknown / not established
Business model / scale
Colocation / Unknown
Region / metro
Metro Manila / Metro Manila
City / locality
Makati
Address
222 Nicanor Garcia Street, Barangay Bel-Air, Makati City 1209, Philippines
Location
PeeringDB facility geocode for the independently corroborated street address; approximately 63 metres south of the user-reported pin at 14.565048, 121.022429. No parcel survey or exact building-point verification obtained.
Precision: approximate · 14.564484, 121.022368
View location on map →
Parent
Not assigned

Location detail

PeeringDB facility geocode for the independently corroborated street address; approximately 63 metres south of the user-reported pin at 14.565048, 121.022429. No parcel survey or exact building-point verification obtained.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.

222 Nicanor Garcia Street, Barangay Bel-Air, Makati City 1209, Philippines

Loading local map…

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
12.3 MW
IT load
Makati 2 total advertised IT power capacity
Operational · cumulative
2026-09-11Reported claim ↗

Excluded from capacity totals. As-of is retrieval of undated operator literature, not commissioning or measurement date; occupied load is unknown.

16 MW
Unspecified power
Makati 2 facility description in February 2023 reporting
Operational · cumulative
2023-02-07Conflicting claim ↗

Excluded from capacity totals. As-of is article publication. Basis is unstated; relationship to later 20 MW total-power reporting is unresolved.

14 MW
Unspecified power
Combined Makati 2 and Parañaque expansion; not solely this facility
Planned · incremental
2023-02-07Reported claim ↗

Excluded from capacity totals. As-of is publication; service readiness targeted as early as March 2023. Shared multi-site figure must not be assigned wholly to Makati 2 or added to site totals.

12 MW
Unspecified power
Makati 2 additional capacity announced in February 2023
Planned · incremental
2023-02-16Reported claim ↗

Excluded from capacity totals. As-of is publication. Article describes expansion but says new capacity would be ready in March; power basis is not explicitly IT. Overlaps resulting total and likely the two-site expansion claim.

20 MW
Facility power
Makati 2 resulting total power capacity after announced expansion
Planned · cumulative
2023-02-16Reported claim ↗

Excluded from capacity totals. As-of is publication; March 2023 readiness was a target. Source calls this total power capacity, not IT load; actual commissioning not established.

Development timeline

  1. 2016-07 · actual_opening

    Makati 2 opened

    PLDT annual filing records opening by ePLDT.

    Supporting source ↗
  2. 2019-07-19 · actual_certification

    Initial TIA certification

    Initial certification date recorded on later constructed-facility certificate.

    Supporting source ↗
  3. 2023-02-07 · announcement

    Upper-floor expansion reported

    Management described expansion of floors four and five; shared expansion program included Parañaque.

    Supporting source ↗
  4. 2023-03 · planned_service_readiness

    Additional capacity targeted for service

    February announcement targeted readiness in March; exact commissioning evidence not obtained.

    Supporting source ↗
  5. 2025-09-01 · actual_certificate_validity_start

    New Rated-3 certificate period

    Certificate states validity through August 31, 2028, subject to certification conditions.

    Supporting source ↗

Disclosed specifications

Colocation area

6,082 sqm

Operator search-indexed specification; direct page unavailable. Distinct from total building area.

Source ↗

Reported building area

8,000 sqm

Industry report; measurement basis and current extent not established.

Source ↗

Historical land area

Nearly 2 hectares

Opening-era report; parcel records not obtained.

Source ↗

Advertised rack capacity

3,360 racks

Operator brochure; historical filing reports 3,600, unresolved.

Source ↗

Historical rack capacity

3,600 racks

PLDT 2021 filing; differs from brochure and 2023 expansion reporting.

Source ↗

Rack power

Up to 10 kW per rack

Advertised maximum, not measured utilization.

Source ↗

Average rack power

8 kW

Operator specification, not a measured operating average.

Source ↗

Electrical resilience

2N generators and UPS; 15-minute UPS backup; 72-hour fuel backup

Brochure design specifications.

Source ↗

Cooling

N+1 chillers, CRACs and cooling tower

Operator search-indexed specification; no liquid-cooling or water-use evidence obtained.

Source ↗

Connectivity

Carrier neutral; four points of entry; VITRO Internet Exchange and PLDT nodes

Operator specification.

Source ↗

Renewable energy

20%

Operator page claim; accounting period and delivery evidence not established.

Source ↗

Availability commitment

99.99% SLA

Contractual advertised level, not verified historical uptime.

Source ↗

Facility certification

ANSI/TIA-942-B-2017 Rated-3

Constructed-facility certificate covers architecture, telecom, electrical and mechanical; validity September 1, 2025–August 31, 2028, subject to terms and surveillance.

Source ↗

Public network presence

IPTP Networks PoP

Network operator confirms available services and regional links; establishes network presence, not an enterprise tenancy roster.

Source ↗

Business contact

customercare@vitrodc.com; +63 (2) 888-VITRO

Public operator customer-care contact.

Source ↗

Corporate relationship

VITRO under ePLDT, wholly owned by PLDT

2026 disclosure; proposed listing does not establish completed ownership dilution.

Source ↗

Corporate restructuring

VITRO REIT, Inc. name reported in 2026 filing

Indexed financial note reports June 24 approval; other filing text retains pending wording. Legal operator and asset-title implications require reconciliation.

Source ↗

Historical building ownership

ePLDT Inc.

2023 event policy describes Vitro Makati building ownership; not treated as proof of current property title.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

VITRO Makati 2 — PeeringDB ↗

Published Date unavailable · Retrieved 2026-09-11

Facility record supplies the matching street address, postcode 1209, VITRO organization, and geocode 14.564484, 121.022368.

VITRO corporate brochure ↗

Published Date unavailable · Retrieved 2026-09-11

Page 8, printed page 14, lists Makati 2 at 12.3 MW IT capacity and 3,360 racks with power-resilience specifications. Publication date not established from the filename.

Data Center Sites — VITRO Data Center ↗

Published Date unavailable · Retrieved 2026-09-11

Search-indexed operator content identifies Makati 2 colocation, 6,082 sqm, 12.3 MW IT capacity, cooling and connectivity. Direct opens timed out; a placeholder table also reports 11.9 MV, which is not a valid MW claim.

PLDT 2021 Form 20-F ↗

Published Date unavailable · Retrieved 2026-09-11

Page 38 states ePLDT opened VITRO Makati 2 in July 2016 and describes historical capacity of 3,600 racks and Nexcenter recognition.

Carrier Racks in VITRO Makati 2 ↗

Published Date unavailable · Retrieved 2026-09-11

Operator advertises additional carrier racks as available and publishes its Makati address and customer-care contact.

Property photo · baxtel.com ↗

Published Date unavailable · Retrieved 2026-09-11

Property image listed by Baxtel as PLDT's second data center in Makati; displayed listing date is not an established capture date. Original image: https://cdn.baxtel.com/data-center/pldt-vitro-makati-2/photos/gallery_display_PLDT-VITRO-Makati-2-PLDT-s-second-data-center-in-Makati.jpg

Profile field evidence

Name: VITRO Makati 2 constructed-facility certificate of conformance; VITRO Makati 2 — PeeringDB

Aliases: VITRO Makati 2 constructed-facility certificate of conformance; PLDT expanding capacity of Makati and Parañaqu data centers; ePLDT expands Vitro Makati2 with additional 12-MW capacity

Kind: VITRO Makati 2 constructed-facility certificate of conformance

Country: VITRO Makati 2 constructed-facility certificate of conformance

Region: IPTP Networks Enters Manila: Accelerating Network Growth in the Philippines

City: VITRO Makati 2 constructed-facility certificate of conformance; VITRO Makati 2 — PeeringDB

Metro: IPTP Networks Enters Manila: Accelerating Network Growth in the Philippines

Address: VITRO Makati 2 constructed-facility certificate of conformance; VITRO Makati 2 — PeeringDB

Operator: VITRO Makati 2 constructed-facility certificate of conformance; VITRO Makati 2 — PeeringDB; PLDT disclosure concerning VITRO proposed listing; PLDT second-quarter 2026 Form 6-K and financial statements

Business Model: Data Center Sites — VITRO Data Center; Carrier Racks in VITRO Makati 2

Statuses: Carrier Racks in VITRO Makati 2; IPTP Networks Enters Manila: Accelerating Network Growth in the Philippines

Summary: PLDT 2021 Form 20-F; VITRO corporate brochure; ePLDT expands Vitro Makati2 with additional 12-MW capacity; PLDT second-quarter 2026 Form 6-K and financial statements

Location: VITRO Makati 2 constructed-facility certificate of conformance; VITRO Makati 2 — PeeringDB

Media: Property photo · baxtel.com

Stable identifier: 573e369d-497f-42c5-9f5e-e872b2695c23