Map
Sign in
← VITRO Makati 2

Published history

Restoring content creates a new revision. Previous revisions remain in the audit trail.

Revision 1 · Current

2026-09-11 06:53 UTC

Published profile snapshot

VITRO Makati 2 · Philippines · VITRO Inc. / VITRO REIT, Inc. (ePLDT group; corporate-name transition requires reconciliation)

Operational VITRO colocation facility in Makati, opened by ePLDT in July 2016. Operator literature lists 12.3 MW IT capacity; February 2023 reporting describes expansion to 20 MW total power. These figures have different stated bases and must not be added. Current property ownership and corporate restructuring need confirmation.

Capacity statements: 5 · Sources: 15

12.3 MW (exact) · it · Makati 2 total advertised IT power capacity · 2026-09-11

16 MW (exact) · unspecified · Makati 2 facility description in February 2023 reporting · 2023-02-07

14 MW (exact) · unspecified · Combined Makati 2 and Parañaque expansion; not solely this facility · 2023-02-07

12 MW (exact) · unspecified · Makati 2 additional capacity announced in February 2023 · 2023-02-16

20 MW (exact) · facility · Makati 2 resulting total power capacity after announced expansion · 2023-02-16