Bitzero Data Center ↗
Published Date unavailable · Retrieved 2026-10-07
Names Kokemäki, Finland; reports 150,000 m² acquired within a potential 971,500 m² site, 10 MW available now, 40 MW near-term with substation and 1 GW total growth capacity.
Finland / Site
Bitzero Pori
Proposed hyperscale AI/HPC campus in Kokemäki's Kirkkokallio area with expansion land south of Highway 2. September 2026 operator disclosure describes an initial plot supporting 80 MW gross load and prospective service in Q4 2027–Q1 2028. Operational IT capacity is unverified; the earlier pilot was reportedly abandoned.
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| 10 MW Unspecified power | Site power advertised as available now Unknown · unclear | 2026-10-07 | Conflicting claim ↗ Excluded from capacity totals. As-of is retrieval date of an undated page, not commissioning date. Availability does not establish operating IT load; subsequent pilot cancellation and future service disclosures complicate this claim. |
| 40 MW Unspecified power | Near-term site capacity with substation Planned · unclear | 2026-10-07 | Reported claim ↗ Excluded from capacity totals. As-of is retrieval date of an undated page. Relationship to later 80 MW and 200 MW plans is unresolved. |
| 1000 MW Unspecified power | Ultimate campus growth capacity Planned · cumulative | 2025-12-02 | Reported claim ↗ Excluded from capacity totals. Announcement-date planned capacity; not an operating load or independently established connection entitlement. |
| 200 MW Unspecified power | Capacity marketed by CBRE for prospective hyperscale development Planned · unclear | 2026-01-13 | Reported claim ↗ Excluded from capacity totals. Announcement-date commercialization scope; pre-design and prospective tenants, not leased or commissioned IT capacity. |
| ≈520 MW Unspecified power | Upper scope of engineering due diligence and pre-design Planned · unclear | 2026-04-24 | Reported claim ↗ Excluded from capacity totals. Source says up to 520 MW; schema lacks a less-than-or-equal qualifier. Engineering scope overlaps campus development and must not be added to other claims. |
| ≈600 MW Unspecified power | Lower endpoint of longer-term campus capacity range Planned · cumulative | 2026-04-24 | Reported claim ↗ Excluded from capacity totals. Source range is 600–1,000 MW; this is its lower endpoint, not a separate additive capacity. |
| ≈1000 MW Unspecified power | Upper endpoint of longer-term campus capacity range Planned · cumulative | 2026-04-24 | Reported claim ↗ Excluded from capacity totals. Source range is 600–1,000 MW; overlaps earlier 1 GW aspiration. |
| ≈80 MW Facility power | Expected gross load supported by first Finland plot Planned · unclear | 2026-09-01 | Reported claim ↗ Excluded from capacity totals. Announcement-date expectation explicitly described as gross load, not IT load. Prospective service window is Q4 2027–Q1 2028. |
Operator's December release dates initial acquisition to January 2025; exact closing date and parcel coverage unresolved.
Supporting source ↗Operator announced ground-breaking/development; this does not establish completed or operational buildings.
Supporting source ↗Yle reports cancellation of the small pilot and a larger revised initial development ambition.
Supporting source ↗Operator reports Red Engineering pre-design assessment for up to 520 MW and an initial 80 MW phase.
Supporting source ↗April disclosure targeted initial 80 MW power deployment in the first half of 2027; later disclosure gives a later service window.
Supporting source ↗September update gives this window for potential Nordic tenants, including 80 MW in Finland; no actual commissioning established.
Supporting source ↗Potential total plot 971,500 m², remaining under option; parcel-by-parcel reconciliation required.
Source ↗Municipal record distinguishes purchase from agreements and reservations; not all potential campus land is established as owned.
Source ↗Operator description of intended low-carbon supply; no site-specific metered mix or power purchase agreement verified.
Source ↗Company reports completed due diligence and progression toward building design.
Source ↗Operator-reported confirmed point; no executed connection agreement or energized capacity independently established.
Source ↗September disclosure does not identify the property, technology, capacity or legal agreement.
Source ↗Further campus parcels require phased development; zoning does not establish building completion.
Source ↗Advisory and brokerage role for prospective Finland tenants; not owner, operator or confirmed tenant.
Source ↗General operator contact published on facility page; no contact made.
Source ↗Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-10-07
Names Kokemäki, Finland; reports 150,000 m² acquired within a potential 971,500 m² site, 10 MW available now, 40 MW near-term with substation and 1 GW total growth capacity.
Published 2025-12-02 · Retrieved 2026-10-07
Announces Phase I development, January 2025 acquisition, 15 hectares acquired and remaining land under option; describes future 1 GW capacity and AI, cloud and Bitcoin workloads.
Published 2026-01-13 · Retrieved 2026-10-07
Describes wholly owned Finland site, CBRE brokerage for potential hyperscale tenants, marketing 200 MW and then-targeted Q1 2027 power readiness.
Published 2026-04-24 · Retrieved 2026-10-07
Company disclosure reports Red Engineering due diligence for up to 520 MW, initial 80 MW phase, longer-term 600–1,000 MW plan and a confirmed 400 kV connection point; initial power targeted for H1 2027.
Published 2026-09-01 · Retrieved 2026-10-07
First Finland plot expected to support 80 MW gross load; three plots industrially zoned. Reports neighboring petrochemical site secured for backup power and prospective Nordic service availability in Q4 2027–Q1 2028.
Published 2025-12-17 · Retrieved 2026-10-07
Pages 30–31 record sale of a Kirkkokallio industrial plot to Bitzero Finland Oy, preliminary agreement for another plot and approximately 70 hectares reserved under option; municipal infrastructure work and an early-2026 pilot were then anticipated.
Published 2026-03-06 · Retrieved 2026-10-07
Reports empty plots, abandonment of the small pilot, a revised 100–200 MW starting ambition, dependence on power-line scheduling, four plots and larger expansion south of Highway 2.
Published Date unavailable · Retrieved 2026-10-07
Directory alias Bitzero Pori and address clue Härkisuontie & Pääväylä 2, 32800 Kokemäki. Its operational stage entry conflicts with primary-source future-development disclosures.
Published Date unavailable · Retrieved 2026-10-07
Municipal information places Kokemäki in Satakunta, western Finland, approximately 40 kilometres from Pori.
Published 2025-12-31 · Retrieved 2026-10-07
Municipal planning document identifies the zoning process south of Highway 2; document date is displayed on its cover.
Name: Bitzero Data Center; Bitzero Holdings Inc. Breaks Ground on Phase I Development at Giga-scale Finland Site
Aliases: Bitzero Pori Data Center
Kind: Bitzero Holdings Inc. Breaks Ground on Phase I Development at Giga-scale Finland Site; Bitzero Provides Corporate Update on Balance Sheet, Site Readiness and Leasing Progress
Country: Bitzero Data Center; Bitzero Holdings Inc. Breaks Ground on Phase I Development at Giga-scale Finland Site
Region: City of Kokemäki information
City: Bitzero Holdings Inc. Breaks Ground on Phase I Development at Giga-scale Finland Site; Kokemäen kaupunki — Talousarvio 2026
Operator: Bitzero Holdings Inc. Breaks Ground on Phase I Development at Giga-scale Finland Site; Bitzero Provides Corporate Update on Balance Sheet, Site Readiness and Leasing Progress
Owner: Kokemäen kaupunki — Talousarvio 2026; Bitzero Holdings Inc. Partners with CBRE & Hydra Host to Commercialize & Deploy AI Compute Capability Across Hyperscale & GPU Demand Channels
Business Model: Bitzero Holdings Inc. Partners with CBRE & Hydra Host to Commercialize & Deploy AI Compute Capability Across Hyperscale & GPU Demand Channels; Bitzero Provides Corporate Update on Balance Sheet, Site Readiness and Leasing Progress
Scale: Bitzero Holdings Inc. Partners with CBRE & Hydra Host to Commercialize & Deploy AI Compute Capability Across Hyperscale & GPU Demand Channels; Bitzero Holdings Inc. Provides Engineering Update at its Finland and Norway Sites — Exhibit 99.95
Statuses: Bitzero Provides Corporate Update on Balance Sheet, Site Readiness and Leasing Progress; Kokemäen datakeskuksen pieni pilotti jää väliin – Bitzero aikoo aloittaa toiminnan sadoilla megoilla ensi vuonna
Location: Kokemäen kaupunki — Talousarvio 2026; Kokemäen datakeskuksen pieni pilotti jää väliin – Bitzero aikoo aloittaa toiminnan sadoilla megoilla ensi vuonna
Summary: Bitzero Provides Corporate Update on Balance Sheet, Site Readiness and Leasing Progress; Kokemäen kaupunki — Talousarvio 2026; Kokemäen datakeskuksen pieni pilotti jää väliin – Bitzero aikoo aloittaa toiminnan sadoilla megoilla ensi vuonna
Stable identifier: 6e594282-b06c-4029-9bd7-74b8e2b9573d