Revision 1 · Current

2026-10-07 13:58 UTC

Published profile snapshot

Bitzero Kokemäki data center site · Finland · Bitzero Holdings Inc.

Proposed hyperscale AI/HPC campus in Kokemäki's Kirkkokallio area with expansion land south of Highway 2. September 2026 operator disclosure describes an initial plot supporting 80 MW gross load and prospective service in Q4 2027–Q1 2028. Operational IT capacity is unverified; the earlier pilot was reportedly abandoned.

Capacity statements: 8 · Sources: 10

10 MW (exact) · unspecified · Site power advertised as available now · 2026-10-07

40 MW (exact) · unspecified · Near-term site capacity with substation · 2026-10-07

1000 MW (exact) · unspecified · Ultimate campus growth capacity · 2025-12-02

200 MW (exact) · unspecified · Capacity marketed by CBRE for prospective hyperscale development · 2026-01-13

520 MW (approx) · unspecified · Upper scope of engineering due diligence and pre-design · 2026-04-24

600 MW (approx) · unspecified · Lower endpoint of longer-term campus capacity range · 2026-04-24

1000 MW (approx) · unspecified · Upper endpoint of longer-term campus capacity range · 2026-04-24

80 MW (approx) · facility · Expected gross load supported by first Finland plot · 2026-09-01