Japan / Site

Osaka Sakai AI Data Center

Unknown MWTotal facility power not establishedSee capacity evidence for reported claims.

大阪堺AIデータセンター · Sakai AI Data Center

Planned

SoftBank is developing an AI data center on acquired former Sharp LCD factory property in Sakai, Osaka Prefecture. It is intended for internal AI development and external computing services. Current operator targets specify FY2027 operations. Historical receiving-power plans and the newer 140 MW computing-infrastructure estimate have different scopes and must not be added. KDDI's Osaka Sakai Data Center is a separate project.

Last researched 2026-10-09Last verified Not independently verifiedPublished revision 1
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
SoftBank Corp.
Ownership
SoftBank Corp.
Business model / scale
Owner Operated / Unknown
Region / metro
Osaka Prefecture / Unknown
City / locality
Sakai
Address
Unknown
Location
Former Sharp Sakai LCD factory property in Sakai, Osaka Prefecture; operator identifies the property but no facility-specific point or parcel boundary was established.
Precision: area
Parent
Not assigned

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
≈150 MW
Grid connection
Initial AI data center receiving-power plan in the 2024 announcement
Planned · cumulative
2024-06-07Reported claim ↗

Excluded from capacity totals. As_of is announcement date. Japanese source specifies receiving capacity, not IT load; historical proposal.

>400 MW
Grid connection
Future expanded receiving-power capacity in the 2024 proposal
Planned · cumulative
2024-06-07Conflicting claim ↗

Excluded from capacity totals. Historical expansion target; later announcement instead states above 250 MW. Do not add to initial capacity or treat as current committed supply.

≈150 MW
Grid connection
AI data center receiving-power capacity under the 2025 acquisition plan
Planned · cumulative
2025-03-14Reported claim ↗

Excluded from capacity totals. As_of is announcement date; associated with then-targeted 2026 operations. Not operational power or IT load.

>250 MW
Grid connection
Future expanded receiving-power capacity under the 2025 acquisition plan
Planned · cumulative
2025-03-14Reported claim ↗

Excluded from capacity totals. Revised future target compared with 2024's above-400 MW proposal; includes expansion rather than an additive increment.

≈140 MW
Grid connection
Estimated receiving power required for targeted 110 exaFLOPS Sakai AI computing infrastructure
Planned · unclear
2026-05-11Estimate claim ↗

Excluded from capacity totals. As_of is dated investor briefing. Footnote explicitly describes an estimated requirement; relationship to historical site receiving capacity and expansion is unspecified. Current KPI targets FY2027 operations.

Development timeline

  1. 2024-06-07 · announcement

    Sharp–SoftBank memorandum of understanding

    Announced proposed conversion of former LCD factory assets into an AI data center.

    Supporting source ↗
  2. 2025 · planned

    Original operating target

    2024 announcement targeted full operations in 2025; later operator plans superseded this target.

    Supporting source ↗
  3. 2025-03-14 · actual

    Property purchase agreement signed

    SoftBank signed an approximately ¥100 billion land/building acquisition agreement with Sharp; signing is distinct from closing.

    Supporting source ↗
  4. 2025-09-27 · announcement

    Acquisition completion reported

    Investor presentation stated acquisition was complete; this date is the presentation date, not an independently established closing date.

    Supporting source ↗
  5. 2026 · planned

    Revised operating target

    2025 announcement targeted operations during 2026; current operator KPI instead indicates FY2027.

    Supporting source ↗
  6. 2026-05-11 · announcement

    AX/GX industrial cluster announced

    AI data center positioned alongside planned AI hardware and energy-related manufacturing activities.

    Supporting source ↗
  7. FY2027 · planned

    Current AI data center operating target

    Current operator KPI targets FY2027 operations for Sakai; no actual opening was established.

    Supporting source ↗

Disclosed specifications

Acquired property land area

Approximately 450,000 m²

2025 disclosed property scope; not a measured data hall footprint. Earlier proposal reported approximately 440,000 m².

Source ↗

Acquired property building floor area

Approximately 840,000 m²

Existing buildings contemplated for reuse; not confirmed dedicated data center floor area. Earlier proposal reported approximately 750,000 m².

Source ↗

Target AI computing performance

110 exaFLOPS

Planned infrastructure; no deployed performance or GPU count established.

Source ↗

Infrastructure reuse

Former LCD factory power supply and cooling assets

Reuse intention; detailed server cooling design and redundancy were not disclosed in reviewed evidence.

Source ↗

Service scope

Internal AI development and external university, research institution and enterprise use

GPU/cloud services do not establish conventional colocation or named committed tenants.

Source ↗

Sustainability intention

Promote carbon neutrality

An aspiration; no site-specific achieved certification, PUE or renewable-energy percentage established.

Source ↗

Related development

AX Factory and GX Factory industrial cluster

AI operations/hardware and battery/solar manufacturing have different functions and schedules; no separate facility hierarchy proposed.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

Profile field evidence

Name: SoftBank Corp. Integrated Report 2025 — What Is Our Long-term Growth Strategy?; SoftBank Corp. Launches Gigawatt-Hour-Scale Battery Business in Japan to Build Next-Generation Infrastructure that Supports the AI Era

Aliases: SoftBank Corp. Investor Briefing — Earnings Results for the Fiscal Year Ended March 31, 2026; SoftBank Corp. Launches Gigawatt-Hour-Scale Battery Business in Japan to Build Next-Generation Infrastructure that Supports the AI Era

Kind: AIデータセンターの構築に向けて、シャープ堺工場の土地や建物の取得に関する契約を締結; SoftBank Corp. Launches Gigawatt-Hour-Scale Battery Business in Japan to Build Next-Generation Infrastructure that Supports the AI Era

Country: SoftBank Corp. Integrated Report 2025 — What Is Our Long-term Growth Strategy?; SoftBank Corp. Launches Gigawatt-Hour-Scale Battery Business in Japan to Build Next-Generation Infrastructure that Supports the AI Era

Region: AIデータセンターの構築に向けて、シャープ堺工場の土地や建物の取得に関する契約を締結; SoftBank Corp. Launches Gigawatt-Hour-Scale Battery Business in Japan to Build Next-Generation Infrastructure that Supports the AI Era

City: AIデータセンターの構築に向けて、シャープ堺工場の土地や建物の取得に関する契約を締結; SoftBank Corp. Launches Gigawatt-Hour-Scale Battery Business in Japan to Build Next-Generation Infrastructure that Supports the AI Era

Operator: SoftBank Corp. Integrated Report 2025 — What Is Our Long-term Growth Strategy?; SoftBank Corp. Launches Gigawatt-Hour-Scale Battery Business in Japan to Build Next-Generation Infrastructure that Supports the AI Era

Owner: ソフトバンク株式会社 日経・東証IRフェア2025会社説明会; SoftBank Corp. Integrated Report 2025 — What Is Our Long-term Growth Strategy?

Business Model: SoftBank Corp. Integrated Report 2025 — What Is Our Long-term Growth Strategy?

Statuses: ③AIとの共存社会を支える次世代社会インフラの実現; SoftBank Corp. Launches Gigawatt-Hour-Scale Battery Business in Japan to Build Next-Generation Infrastructure that Supports the AI Era

Location: AIデータセンターの構築に向けて、シャープ堺工場の土地や建物の取得に関する契約を締結; シャープ堺工場を活用した大規模なAIデータセンターの構築について

Summary: AIデータセンターの構築に向けて、シャープ堺工場の土地や建物の取得に関する契約を締結; SoftBank Corp. Integrated Report 2025 — What Is Our Long-term Growth Strategy?; SoftBank Corp. Investor Briefing — Earnings Results for the Fiscal Year Ended March 31, 2026; ③AIとの共存社会を支える次世代社会インフラの実現; SoftBank Corp. Launches Gigawatt-Hour-Scale Battery Business in Japan to Build Next-Generation Infrastructure that Supports the AI Era; 大阪堺データセンターを1月22日から稼働開始

Stable identifier: 72917e06-af2f-4dfd-989e-ac7cf3c2010d