YTL Johor Data Center Park — capacity evidence ↗
Published Date unavailable · Retrieved 2026-09-11
YTL Johor park: up to 600 MW development, including a 72 MW operational first data center.
Malaysia / Site
YTL Green Data Center Park in Kulai. YTL now proposes expansion from 600 MW to 1,000 MW and reports 298 MW contracted; contracted, operating and ultimate capacity are distinct. This is separate from YTL Sedenak West.

Site / building photo
Property exterior: YTL Johor Data Center Park.
Published date unknown · Captured date unknown · Checked 2026-09-11
Selected from sources checked 2026-09-11 for identity and unobstructed property view; latest capture date cannot be established.
www.ytl.com · Source and attribution ↗Copyright/trademark belongs to the respective rights holder. Publicly available source; no open reuse license established. External reuse rights unconfirmed. Capture and original image publication dates not independently established; retrieval/upload dates are not capture dates.
Named Google Maps site POI matched to facility identity and locality; approximate property location, not independently verified building boundary or entrance.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.
Loading local map…
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| 600 MW Unspecified power | Advertised full-build/design capacity; commissioned share unconfirmed Planned · unclear | 2026-09-11 | Reported claim ↗ Excluded from capacity totals. Retrieval date, not measurement date. Design ceiling is not proof of delivered/occupied load. Excluded from aggregates pending reconciliation. Up to 600 MW campus development; directory reports 72 MW first building operational. Remaining scope and allocation unresolved; location explicitly not public. Historical/current design claims retained without selecting an additive total. |
| 72 MW Unspecified power | First data center within the park; included in full-build ceiling Operational · unclear | 2026-09-11 | Reported claim ↗ Excluded from capacity totals. Retrieval date, not measurement date. Design ceiling is not proof of delivered/occupied load. Excluded from aggregates pending reconciliation. Historical/current design claims retained without selecting an additive total. |
| 1000 MW Unspecified power | Kulai Green Data Center Park expansion ambition, not the separate Sedenak West project Planned · unclear | 2026-09-11 | Reported claim ↗ Excluded from capacity totals. Source-reported design/announced capacity, not measured consumption. Excluded from aggregation pending reconciliation. Historical/current design claims retained without selecting an additive total. |
Source-backed research proposal; publication requires review.
Source ↗Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-09-11
YTL Johor park: up to 600 MW development, including a 72 MW operational first data center.
Published Date unavailable · Retrieved 2026-09-11
YTL plans to grow Kulai park from 600 MW to 1,000 MW; 298 MW contracted.
Published Date unavailable · Retrieved 2026-09-11
Named place result YTL Green Data Center Park Kulai; POI coordinates 1.6205686, 103.5215847. Named Google Maps site POI matched to facility identity and locality; approximate property location, not independently verified building boundary or entrance.
Published Date unavailable · Retrieved 2026-09-11
Property exterior: YTL Johor Data Center Park. Image reference: https://ytlpi-web-prod.azurewebsites.net/ytlcorp/wp-content/uploads/2026/05/ytl-data-centre-750.jpg Visually inspected against the cited source and profile identity.
Published Date unavailable · Retrieved 2026-09-11
YTL Data Center operator brand mark. Image reference: https://ytldatacenters.com/wp-content/uploads/2025/05/ytldc_logo.png Visually inspected against the cited source and profile identity.
Name: YTL Johor Data Center Park — capacity evidence
Operator: YTL Johor Data Center Park — capacity evidence; YTL · Third-quarter 2026 results
Country: YTL Johor Data Center Park — capacity evidence
Region: YTL Johor Data Center Park — capacity evidence
Metro: YTL Johor Data Center Park — capacity evidence
Kind: YTL Johor Data Center Park — capacity evidence
Statuses: YTL Johor Data Center Park — capacity evidence
Summary: YTL Johor Data Center Park — capacity evidence
Location: Google Maps · YTL Green Data Center Park Kulai
Media: Property imagery · www.ytl.com
Operator Logo: Operator logo · ytldatacenters.com
Stable identifier: 798d4794-8581-4ac0-bba5-08a911662db1