High Density Data Center in Helsinki - FIN02 - atNorth ↗
Published Date unavailable · Retrieved 2026-10-07
Identifies FIN02 in Sinimäentie, Espoo, Finland; advertises 40 MW campus power, 20,048 sqm campus size and high-density infrastructure.
Finland / Site
FIN02 · FIN 02 · FIN02 – Helsinki metro site
Operational atNorth colocation campus in Espoo, Helsinki metro, with an adjoining expansion under construction. Initial announced IT capacity was 15 MW; the current operator page advertises 40 MW campus power, while the expansion contractor reports 45 MW gross capacity upon completion. These figures are not additive or established live IT load.
PeeringDB facility geocode associated with Sinimäentie 6; street identity corroborated by operator and municipal evidence. Marker position and building footprint were not independently verified.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.
Loading local map…
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| 15 MW IT load | Initial FIN02 campus IT capacity Planned · cumulative | 2026-10-07 | Reported claim ↗ Excluded from capacity totals. Retrieval-date observation of an undated historical announcement; planned Q3 2024 delivery, not evidence of commissioned IT capacity. |
| 40 MW Facility power | FIN02 advertised campus power capacity Unknown · cumulative | 2026-10-07 | Reported claim ↗ Excluded from capacity totals. As-of is retrieval date of undated operator page. Campus power is distinct from IT load; live versus ultimate build-out scope is unspecified. |
| 45 MW Facility power | Total FIN02 gross capacity following adjoining expansion Under Construction · cumulative | 2026-05-04 | Reported claim ↗ Excluded from capacity totals. Announcement date; contractor calls this gross capacity at planned autumn 2027 completion. Relationship to advertised 40 MW is unresolved; not incremental 45 MW. |
| 25 MW IT load | Directory-reported total FIN02 IT capacity Planned · cumulative | 2026-10-07 | Conflicting claim ↗ Excluded from capacity totals. Retrieval date; undated directory retains Q4 2024 target. Not established operational capacity or reconciled with initial 15 MW. |
| 11.2 MW Unspecified power | Directory-reported fully built-out power; campus/phase boundary unspecified Unknown · unclear | 2026-10-07 | Conflicting claim ↗ Excluded from capacity totals. Retrieval date; no source publication or measurement date. Conflicts with campus disclosures and must not replace them. |
Initial announcement targeted operation by Q3 2024; later evidence supersedes this schedule.
Supporting source ↗Operator reports April opening; year inferred from 2025 context and corroborating report, without an exact opening day.
Supporting source ↗Sustainability report says FIN02 began supplying heat to Kesko in 2025.
Supporting source ↗Skanska reports construction started in April 2026 beside operating FIN02.
Supporting source ↗Contractor expects completion in autumn 2027; retained within this campus rather than a separate site.
Supporting source ↗CPP Investments and Equinix complete atNorth acquisition, with Partners Group reinvesting; atNorth retains independent brand operations.
Supporting source ↗Municipal notice publishes expansion environmental and commencement permit decision 468/2026.
Supporting source ↗Operator label; land versus gross building area and build-out scope unspecified.
Source ↗Contractor disclosure; do not add to campus size without reconciling scope.
Source ↗Advertised supported design, not measured installed rack inventory.
Source ↗Operator design specifications.
Source ↗Operator specifications; PeeringDB additionally lists Cinia Oy without proving complete carrier availability.
Source ↗Operator sustainability disclosure.
Source ↗Corporate/operator claim; site-specific electricity mix and procurement contracts not established.
Source ↗Public business contact listed for facility; no contact made.
Source ↗Corporate ownership effective September 2026, distinct from legal property ownership.
Source ↗Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-10-07
Identifies FIN02 in Sinimäentie, Espoo, Finland; advertises 40 MW campus power, 20,048 sqm campus size and high-density infrastructure.
Published Date unavailable · Retrieved 2026-10-07
Lists FIN02 as Helsinki metro site in Espoo, 40 MW total power and an earlier Q1 2025 commencement target.
Published Date unavailable · Retrieved 2026-10-07
Lists Sinimäentie 6, 02630 Espoo, FI; geocode 60.204827, 24.772068; public sales email sales@atnorth.com and Cinia Oy carrier. Record last updated November 17, 2025.
Published 2026-05-04 · Retrieved 2026-10-07
Skanska announcement: expansion beside operating FIN02 began April 2026; expected autumn 2027 completion, approximately 11,200 sqm over five floors and 45 MW total gross capacity after completion.
Published 2026-10-06 · Retrieved 2026-10-07
Municipal notice identifies atNorth Oy and data-center expansion at Sinimäentie 6a; decision 468/2026, case LVV-U/18794/2026.
Published Date unavailable · Retrieved 2026-10-07
Operator identifies FIN 02 at Sinimäentie, Espoo; acquisition from Tallberg Group, initial planned 15 MW IT capacity and Q3 2024 operational target. Displayed publication date was not established.
Published Date unavailable · Retrieved 2026-10-07
Operator states FIN02 became operational in April and describes Kesko heat reuse partnership; year corroborated by 2025 sustainability report.
Published Date unavailable · Retrieved 2026-10-07
Document explicitly says published June 2026. Reports FIN02 supplying heat to Kesko beginning in 2025 and using excess heat for its offices.
Published Date unavailable · Retrieved 2026-10-07
Maps municipality 049 Espoo to region 01 Uusimaa.
Published 2026-09-02 · Retrieved 2026-10-07
Completed corporate acquisition; atNorth continues independently under its brand. CPP Investments approximately 51%, Equinix 34%, Partners Group 10%, remainder internal stakeholders. Does not establish site title ownership.
Published 2026-08-11 · Retrieved 2026-10-07
Paragraph 38 identifies operating FIN02 in Helsinki metro, increased installed IT capacity between Q1 2025 and Q1 2026, and further expansion through 2027 and after January 2028; numerical capacities redacted.
Published Date unavailable · Retrieved 2026-10-07
Directory lists Sinimäentie 6 and planned 25 MW IT; distinguishes nearby Equinix addresses 8–12 and FIN03 at Kutojantie 2. Historical target conflicts with later operating evidence.
Published Date unavailable · Retrieved 2026-10-07
Directory lists 11.2 MW fully built-out power and 2,196 sqm whitespace, inconsistent with other campus-scale disclosures; publication/as-of date unavailable.
Name: High Density Data Center in Helsinki - FIN02 - atNorth; atNorth FIN02 - PeeringDB
Aliases: High Density Data Center in Helsinki - FIN02 - atNorth; Finland Data Centres - atNorth; atNorth to open new 15MW data center campus
Kind: High Density Data Center in Helsinki - FIN02 - atNorth; Skanska rakentaa atNorthille datakeskuksen laajennuksen Espooseen
Country: High Density Data Center in Helsinki - FIN02 - atNorth; atNorth FIN02 - PeeringDB
Region: Municipalities and regions correspondence table 2026 - Statistics Finland
City: High Density Data Center in Helsinki - FIN02 - atNorth; Datakeskuksen laajennuksen ympäristölupa ja toiminnan aloittamislupa, Sinimäentie 6a, atNorth Oy
Metro: Finland Data Centres - atNorth; European Commission Case M.12394 - CPPIB / EQUINIX / ATNORTH
Address: atNorth FIN02 - PeeringDB; Datakeskuksen laajennuksen ympäristölupa ja toiminnan aloittamislupa, Sinimäentie 6a, atNorth Oy
Operator: High Density Data Center in Helsinki - FIN02 - atNorth; Skanska rakentaa atNorthille datakeskuksen laajennuksen Espooseen
Business Model: CPP Investments and Equinix complete atNorth acquisition; atNorth FIN02 - Data Center Map
Statuses: Skanska rakentaa atNorthille datakeskuksen laajennuksen Espooseen; atNorth announces heat reuse partnership with Kesko Corporation; European Commission Case M.12394 - CPPIB / EQUINIX / ATNORTH
Summary: High Density Data Center in Helsinki - FIN02 - atNorth; Skanska rakentaa atNorthille datakeskuksen laajennuksen Espooseen; atNorth to open new 15MW data center campus; European Commission Case M.12394 - CPPIB / EQUINIX / ATNORTH
Location: atNorth FIN02 - PeeringDB; High Density Data Center in Helsinki - FIN02 - atNorth; Datakeskuksen laajennuksen ympäristölupa ja toiminnan aloittamislupa, Sinimäentie 6a, atNorth Oy
Stable identifier: 7c517a9c-00d6-41da-ac13-c47f6cb17ea6