First factory opened in Hrazdan; Armenian roadmap targets 300 MW by end-2027. Perplexity named as a customer.
Armenia / Site
Firebird AI Data Center · Firebird DC-1 Hrazdan · Firebird Armenia AI Megaproject
AI campus with an opened first phase and further expansion. The 300 MW roadmap is a future total, not commissioned IT load. DC-2 is a 280 MW roadmap component; its precise boundary and reconciliation with the campus total require review.
Named Google Maps Firebird.ai Data Center place marker, linked to firebird.ai and corroborated by Hrazdan DC-1 directory evidence; not a surveyed boundary.. Coordinate precision: block. Street-map detail does not increase the accuracy of the sourced point.
Loading local map…
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| 300 MW Unspecified power | Ultimate Armenian campus roadmap by end-2027 Planned · cumulative | 2026-08-08 | Reported claim ↗ Excluded from capacity totals. Includes existing and future phases; never add to DC-1 or DC-2. Power measurement boundary is not defined. |
| 18 MW Facility power | Phase 1 design total power Operational · incremental | 2026-06-05 | Reported claim ↗ Excluded from capacity totals. 18 MW is the June design specification associated with the phase opened in August (f-open), not measured live demand. Current delivered capacity requires confirmation. |
| 280 MW Unspecified power | DC-2 / Phase 2 roadmap component Planned · unclear | None | Reported claim ↗ Excluded from capacity totals. Component within the expansion; incremental versus cumulative boundary not fully established. Do not add to 300 MW. Undated page also has inconsistent generic 125 MW marketing text. |
Retained as historical plan; actual opening announced in August.
Supporting source ↗Single campus proposal avoids creating duplicate counts before site boundaries are reconciled.
Source ↗Operator labels this an aerial view; local media import and rights review pending.
Source ↗Public leadership disclosure; complete ownership table and stake percentages not established.
Source ↗Named as prospective founding investor in June 2025 company release.
Source ↗NVIDIA stated an intention to invest; its completion was not established. Government and technology partnerships do not prove equity ownership.
Source ↗Investor-level connection only. Does not establish that the Firebird campus mined cryptocurrency or that Firebird individual founders personally mined.
Source ↗Google Maps names Firebird.ai Data Center in Hrazdan, links firebird.ai, and provides the place marker 40.5418006, 44.7938423. This is distinct from the viewport center in the prior ADKARS evidence. Nearby directory marker corroborates the locality. Block accuracy denotes a named property marker, not surveyed boundaries. Photo galleries were not accessible in the available public response; no property photograph visually verified or imported. No assertion that no photos exist.
Source ↗Source attribution does not imply independent verification or permission to reuse images.
Published 2026-08-08 · Retrieved 2026-10-07
First factory opened in Hrazdan; Armenian roadmap targets 300 MW by end-2027. Perplexity named as a customer.
Published 2026-06-05 · Retrieved 2026-10-07
Phase one design: 18 MW total power; project land exceeds 200,000 m². Vertiv closed-loop cooling and Team Telecom connectivity described.
Published Date unavailable · Retrieved 2026-10-07
Hrazdan DC-2 expansion lists 280 MW. A generic 125 MW per-facility figure on the same page is not reconciled; Kazakhstan DC-3 is outside this record.
Published Date unavailable · Retrieved 2026-10-07
Hrazdan DC-1 map marker is 40.54156382784604, 44.793750596478255. Separate Yerevan office marker was excluded. Directory pin requires independent property verification.
Published 2026-10-06 · Retrieved 2026-10-07
Reports continuing grid-integration and allocation discussions for expansion; does not certify a 300 MW commissioned connection.
Published Date unavailable · Retrieved 2026-10-07
Names Razmig Hovaghimian cofounder/CEO, Alexander Yesayan cofounder/president, and Noubar Afeyan founding partner, investor and strategic advisor. No stake percentages supplied.
Published 2025-06-11 · Retrieved 2026-10-07
Company announcement states Afeyan Foundation for Armenia will join as founding investor. Team Group is an infrastructure/connectivity partner; partnership alone does not establish equity.
Published 2026-08-08 · Retrieved 2026-10-07
States CoreWeave invested in Firebird earlier in 2026; NVIDIA intends to invest. An investment intention is not confirmation of a completed investment.
Published 2021-11-03 · Retrieved 2026-10-07
CEO Michael Intrator describes Ethereum mining beginning in 2016, subsequent GPU expansion, and transition toward GPU cloud services. First-party evidence of investor CoreWeave mining history.
Published Date unavailable · Retrieved 2026-10-07
Google Maps names Firebird.ai Data Center in Hrazdan, links firebird.ai, and provides the place marker 40.5418006, 44.7938423. This is distinct from the viewport center in the prior ADKARS evidence. Nearby directory marker corroborates the locality. Block accuracy denotes a named property marker, not surveyed boundaries. Photo galleries were not accessible in the available public response; no property photograph visually verified or imported. No assertion that no photos exist.
Name: Firebird opening announcement
Aliases: Firebird opening announcement
Kind: Firebird opening announcement
Country: Firebird opening announcement
Region: Electronic Armenia: Firebird locations
City: Firebird opening announcement
Operator: Firebird opening announcement
Statuses: Firebird opening announcement
Summary: Firebird opening announcement
Stable identifier: 88cf0122-9577-4e5f-ac7c-0785c38b58dc