JHB01: 220 MW campus under construction, with two buildings.
Malaysia / Site
STACK Johor campus with two planned facilities. Its initial announcement described 220 MW; the current APAC site lists 216 MW. Both disclosures remain available for review without adding them together.
Named Google Maps site POI matched to facility identity and locality; approximate property location, not independently verified building boundary or entrance.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.
Loading local map…
Statements retain their dates, definitions and development scope. Do not add these rows together.
| Claim / measurement | Scope and status | As of | Evidence and accounting |
|---|---|---|---|
| 220 MW Unspecified power | Advertised full-build/design capacity; commissioned share unconfirmed Planned · unclear | 2026-09-11 | Reported claim ↗ Excluded from capacity totals. Retrieval date, not measurement date. Design ceiling is not proof of delivered/occupied load. Excluded from aggregates pending reconciliation. Campus design covers two buildings; do not repeat campus capacity for JHB01A/JHB01B. Historical/current design claims retained without selecting an additive total. |
| 216 MW Unspecified power | Current operator market listing for single Johor campus Planned · unclear | 2026-09-11 | Reported claim ↗ Excluded from capacity totals. Source-reported design/announced capacity, not measured consumption. Excluded from aggregation pending reconciliation. Historical/current design claims retained without selecting an additive total. |
Source-backed research proposal; publication requires review.
Source ↗Source attribution does not imply independent verification or permission to reuse images.
Published Date unavailable · Retrieved 2026-09-11
JHB01: 220 MW campus under construction, with two buildings.
Published Date unavailable · Retrieved 2026-09-11
Current operator page lists one Johor Bahru site at 216 MW.
Published 2025-01-14 · Retrieved 2026-09-11
Original 220 MW campus announcement specifies two buildings of 120 and 100 MW.
Published Date unavailable · Retrieved 2026-09-11
Named place result Stack Infrastructure Malaysia One Sdn Bhd; POI coordinates 1.4700909, 103.5888088. Named Google Maps site POI matched to facility identity and locality; approximate property location, not independently verified building boundary or entrance.
Published Date unavailable · Retrieved 2026-09-11
STACK operator brand mark. Image reference: https://www.stackinfra.com/wp-content/uploads/2025/01/Logo2-1.webp Visually inspected against the cited source and profile identity.
Name: STACK Infrastructure JHB01 campus — capacity evidence
Operator: STACK Infrastructure JHB01 campus — capacity evidence; STACK · APAC footprint; STACK · Johor announcement
Country: STACK Infrastructure JHB01 campus — capacity evidence
Region: STACK Infrastructure JHB01 campus — capacity evidence
Metro: STACK Infrastructure JHB01 campus — capacity evidence
City: STACK Infrastructure JHB01 campus — capacity evidence
Address: STACK Infrastructure JHB01 campus — capacity evidence
Kind: STACK Infrastructure JHB01 campus — capacity evidence
Statuses: STACK Infrastructure JHB01 campus — capacity evidence
Summary: STACK Infrastructure JHB01 campus — capacity evidence
Capacity Claims: STACK · Johor announcement
Location: Google Maps · Stack Infrastructure Malaysia One Sdn Bhd
Operator Logo: Operator logo · www.stackinfra.com
Stable identifier: 8d6b33fb-7a25-41c6-81ab-b3de0b863291