← STACK Infrastructure JHB01 campus

Published history

Restoring content creates a new revision. Previous revisions remain in the audit trail.

Revision 3 · Current

2026-09-11 12:15 UTC

Published profile snapshot

STACK Infrastructure JHB01 campus · Malaysia · STACK Infrastructure

STACK Johor campus with two planned facilities. Its initial announcement described 220 MW; the current APAC site lists 216 MW. Both disclosures remain available for review without adding them together.

Capacity statements: 2 · Sources: 5

220 MW (exact) · unspecified · Advertised full-build/design capacity; commissioned share unconfirmed · 2026-09-11

216 MW (exact) · unspecified · Current operator market listing for single Johor campus · 2026-09-11

Revision 2

2026-09-11 11:26 UTC

Published profile snapshot

STACK Infrastructure JHB01 campus · Malaysia · STACK Infrastructure

STACK Johor campus with two planned facilities. Its initial announcement described 220 MW; the current APAC site lists 216 MW. Both disclosures remain available for review without adding them together.

Capacity statements: 2 · Sources: 4

220 MW (exact) · unspecified · Advertised full-build/design capacity; commissioned share unconfirmed · 2026-09-11

216 MW (exact) · unspecified · Current operator market listing for single Johor campus · 2026-09-11

Revision 1

2026-09-11 09:58 UTC

Published profile snapshot

STACK Infrastructure JHB01 campus · Malaysia · STACK Infrastructure

Campus design covers two buildings; do not repeat campus capacity for JHB01A/JHB01B.

Capacity statements: 1 · Sources: 1

220 MW (exact) · unspecified · Advertised full-build/design capacity; commissioned share unconfirmed · 2026-09-11