Microsoft Espoo Hepokorpi data center

Espoon datakeskus · Hepokorvenkallio data centre

Under ConstructionPlanned

Microsoft cloud campus in Hepokorpi, Högnäs, Espoo, forming part of its Finland data-center region alongside Kirkkonummi and Vihti. Construction is underway, with further phases permitted. The 2024 EIA assessed approximately 173 MW of IT capacity across four buildings; subsequent permitting describes HEL16, HEL17 and HEL18 and approximately 60 MW of electrical capacity for HEL16. Initial operation is expected around 2027, subject to commissioning.

Last researched 2026-10-07Last verified Not independently verifiedPublished revision 1
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
Microsoft
Ownership
Microsoft 3465 Finland Oy
Business model / scale
Owner Operated / Unknown
Region / metro
Unknown / Helsinki metropolitan area
City / locality
Espoo
Address
Hepokorvenkaari 1, Espoo, Finland
Location
Property identified through municipal address and operator street references; no independently corroborated geographic point established.
Precision: unknown
Parent
Not assigned

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
≈173 MW
Unspecified power
Ultimate Hepokorvenkallio project described in 2023 EIA requirement decision
Planned · cumulative
2023-01-11Reported claim ↗

Excluded from capacity totals. As-of is the government decision date. Document states a maximum 173 MW project; electrical basis is unspecified. Overlaps the later EIA IT claim and must not be added to it.

≈60 MW
Unspecified power
HEL16 operation described in environmental permit application
Planned · unclear
2025-03-20Reported claim ↗

Excluded from capacity totals. As-of is municipal consultation date. Source calls this electrical capacity of the functions; it does not establish IT load versus total facility input. Do not add to the campus claim.

Development timeline

  1. 2023-12-13 · announcement

    Municipal land sale announced

    City reports approximately 21.6 hectares sold to Microsoft 3465 Finland Oy.

    Supporting source ↗
  2. 2025-10-07 · actual_permit

    HEL16 environmental permit issued

    Permit recorded in the municipal meeting of 30 October 2025; permission is not evidence of commissioning.

    Supporting source ↗
  3. 2026-04-28 · announcement

    Second-phase investment confirmed

    Microsoft confirms second-phase construction decision for all three Finland campuses.

    Supporting source ↗
  4. 2026-05 · actual_construction_update

    Second building beginning

    Operator reports construction progressing and second-building work beginning.

    Supporting source ↗
  5. 2026-06-11 · actual_permit

    Third-phase building permission granted

    City grants permission for the third phase and early commencement of construction.

    Supporting source ↗
  6. 2027 · planned_operation

    Initial operation expected

    City anticipates operation around 2027; operator has not announced an actual commissioning date.

    Supporting source ↗

Disclosed specifications

Land purchased

Approximately 21.6 hectares

Municipal sale area; not necessarily the complete campus footprint.

Source ↗

Assessed project footprint

Approximately 28 hectares; four data-center buildings

2024 EIA indexed text only; direct PDF access failed. Later permits describe three buildings, so this is historical assessed scope.

Source ↗

Historical project area

Approximately 40 hectares

Two-part project area in January 2023 decision; scope differs from purchased land and later EIA area.

Source ↗

Building identifiers

HEL16, HEL17, HEL18

Three buildings described by 2025 permit records; retained within one campus candidate.

Source ↗

Waste-heat recovery

Fortum district-heating integration planned from 2027

Operating Fortum heat plants initially use ambient air and electric boilers; this does not establish data-center operation. Regional heat percentages and heat-plant MW are not data-center electrical capacities.

Source ↗

Main contractor

Winthrop Technologies Finland Oy

Identified by operator construction updates.

Source ↗

Public project contact

dcsuomi@microsoft.com

Published operator project mailbox; no contact made.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

Espoo datacenter project updates ↗

Published Date unavailable · Retrieved 2026-10-07

Rolling operator updates: May 2026 reports construction progressing and the second building beginning; identifies Hepokuja 2 as an event location and Hepokorventie as site access. September 2024 notice schedules earthworks.

Ympäristö- ja rakennuslautakunta 20.03.2025 §49 ↗

Published 2025-03-20 · Retrieved 2026-10-07

Municipal permit consultation identifies applicant-owned property at Hepokorvenkaari 1, buildings HEL16–HEL18, and approximately 60 MW electrical capacity for the HEL16 application.

Espoon datakeskus – Ympäristövaikutusten arviointi ↗

Published Date unavailable · Retrieved 2026-10-07

Public indexed original-source text reports approximately 173 MW IT capacity, approximately 28 hectares and four buildings in the assessed alternative. Direct PDF opening failed; document date supplied by lead was not independently confirmed.

EIA requirement decision UUDELY/6968/2022 ↗

Published 2023-01-11 · Retrieved 2026-10-07

Opened government PDF describes a planned maximum 173 MW project and an approximately 40-hectare two-part project area north of Ring III between Hepokorpi and Tollinmäki; capacity basis is unspecified.

Profile field evidence

Name: Espoo datacenter project updates; Espoo sold land in Hepokorpi to Microsoft for data centre project

Aliases: Espoon datakeskus – Ympäristövaikutusten arviointi; Espoo sold land in Hepokorpi to Microsoft for data centre project

Kind: Microsoft käynnistää pääkaupunkiseudun datakeskusalueen toisen vaiheen rakentamisen; Hepokorven datakeskuksen kolmannelle vaiheelle rakennuslupa

Country: Microsoft käynnistää pääkaupunkiseudun datakeskusalueen toisen vaiheen rakentamisen; Fortum has started heat production at two large data centre sites in Finland

City: Espoo sold land in Hepokorpi to Microsoft for data centre project; Ympäristö- ja rakennuslautakunta 20.03.2025 §49

Metro: Microsoft käynnistää pääkaupunkiseudun datakeskusalueen toisen vaiheen rakentamisen; Fortum has started heat production at two large data centre sites in Finland

Address: Ympäristö- ja rakennuslautakunta 20.03.2025 §49; Ympäristö- ja rakennuslautakunta 30.10.2025 §141

Operator: The Hepokorpi Project: Data center supporting Espoo’s Carbon-Neutral Future

Owner: Espoo sold land in Hepokorpi to Microsoft for data centre project; Ympäristö- ja rakennuslautakunta 20.03.2025 §49

Business Model: Microsoft käynnistää pääkaupunkiseudun datakeskusalueen toisen vaiheen rakentamisen; The Hepokorpi Project: Data center supporting Espoo’s Carbon-Neutral Future

Statuses: Espoo datacenter project updates; Hepokorven datakeskuksen kolmannelle vaiheelle rakennuslupa; Changes to traffic arrangements in Hepokorpi

Summary: Microsoft käynnistää pääkaupunkiseudun datakeskusalueen toisen vaiheen rakentamisen; Ympäristö- ja rakennuslautakunta 20.03.2025 §49; The Hepokorpi Project: Data center supporting Espoo’s Carbon-Neutral Future; Espoon datakeskus – Ympäristövaikutusten arviointi

Location: Espoo datacenter project updates; Ympäristö- ja rakennuslautakunta 20.03.2025 §49; EIA requirement decision UUDELY/6968/2022

Stable identifier: 9678aa7d-5133-41a7-9e4d-67e341028fb0