Digital Edge colocation and interconnection facility in Centum City, Busan, integrated with the former Sejong Telecom C2C cable landing station. Operator capacity disclosures conflict between 14 MW and 4.5 MW; current IT load and expansion commissioning remain unresolved.
Last researched 2026-10-07Last verified Not independently verifiedPublished revision 1
No approved site photo yet. Photos and their source dates are published after evidence review.
Site profile
Operator
Digital Edge
Ownership
Digital Edge
Business model / scale
Colocation / Unknown
Region / metro
Busan / Busan
City / locality
Busan
Address
32 Centum 7-ro, Haeundae-gu, Busan 48059, South Korea
Location
PeeringDB facility geocode associated with the corroborated street address; no independently inspected property marker or surveyed point. Precision: approximate · 35.174915, 129.127427 View location on map →
Parent
Not assigned
Location detail
PeeringDB facility geocode associated with the corroborated street address; no independently inspected property marker or surveyed point.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.
32 Centum 7-ro, Haeundae-gu, Busan 48059, South Korea
Loading local map…
Capacity evidence
Statements retain their dates, definitions and development scope. Do not add these rows together.
Excluded from capacity totals. As-of is retrieval date of undated operator page. Reported description value exceeds 5 MW but is not established IT load or commissioned facility supply; conflicts with same-page table.
4.5 MW Unspecified power
PUS1 capacity table with planned update wording Unknown · unclear
Excluded from capacity totals. As-of is retrieval date. Planned update may refer to capacity or editorial updating; no commissioning or expansion date established.
Excluded from capacity totals. As-of is retrieval date of undated language version. Same facility and overlapping description; do not add to other claims.
4.8 MW Unspecified power
Directory fully built-out power for PUS1 Unknown · unclear
Excluded from capacity totals. As-of is retrieval date, not capacity effective date. Secondary source lacks clear primary basis and conflicts with operator disclosures.
Development timeline
2021-04-01 · announcement
Acquisition agreement announced
Digital Edge announced agreement to acquire Sejong Telecom’s Centum City cable landing facility alongside a Seoul data center; closing was expected Q2 2021.
PUS1 section identifies Centum City and cable landing integration; description reports 14 MW, table 4.5 MW with planned-update wording, 9,463 m² and 1,605 cabinets.
Facility record identifies Digital Edge, alias DigitalEdge PUS1, address 32 Centum 7-ro, Haeundae-gu, Busan 48059, KR, and geocode 35.174915,129.127427. Record last updated September 26, 2025.
Announces agreement to acquire Sejong Telecom assets including Centum City cable landing facility; closing expected Q2 2021, with subsequent capacity and efficiency investment.
Updated content links C2C Busan CLS to renamed PUS1, identifies Digital Edge as owner formerly Sejong Telecom, and distinguishes another Busan landing station. Displayed original publication date precedes later acquisition content; update date unavailable.
PUS1-specific section identifies U-dong parcel 1453, reports July 2024 expansion building permission, 14,072 m² gross floor area and Changjo as architect. Original permit and current construction stage were not established.
Circular Economy section, printed page 18, reports PUS1 recycled 56% of waste in 2023; this is historical site-specific evidence, not current renewable power evidence.