South Korea / Facility

Digital Edge PUS1 Busan Data Center

Unknown MWTotal facility power not establishedSee capacity evidence for reported claims.

DigitalEdge PUS1 · C2C Busan Cable Landing Station

Operational

Digital Edge colocation and interconnection facility in Centum City, Busan, integrated with the former Sejong Telecom C2C cable landing station. Operator capacity disclosures conflict between 14 MW and 4.5 MW; current IT load and expansion commissioning remain unresolved.

Last researched 2026-10-07Last verified Not independently verifiedPublished revision 1
No approved site photo yet. Photos and their source dates are published after evidence review.

Site profile

Operator
Digital Edge
Ownership
Digital Edge
Business model / scale
Colocation / Unknown
Region / metro
Busan / Busan
City / locality
Busan
Address
32 Centum 7-ro, Haeundae-gu, Busan 48059, South Korea
Location
PeeringDB facility geocode associated with the corroborated street address; no independently inspected property marker or surveyed point.
Precision: approximate · 35.174915, 129.127427
View location on map →
Parent
Not assigned

Location detail

PeeringDB facility geocode associated with the corroborated street address; no independently inspected property marker or surveyed point.. Coordinate precision: approximate. Street-map detail does not increase the accuracy of the sourced point.

32 Centum 7-ro, Haeundae-gu, Busan 48059, South Korea

Loading local map…

Capacity evidence

Statements retain their dates, definitions and development scope. Do not add these rows together.

Claim / measurementScope and statusAs ofEvidence and accounting
14 MW
Unspecified power
PUS1 facility description; commissioned versus ultimate scope unspecified
Unknown · unclear
2026-10-07Conflicting claim ↗

Excluded from capacity totals. As-of is retrieval date of undated operator page. Reported description value exceeds 5 MW but is not established IT load or commissioned facility supply; conflicts with same-page table.

4.5 MW
Unspecified power
PUS1 capacity table with planned update wording
Unknown · unclear
2026-10-07Conflicting claim ↗

Excluded from capacity totals. As-of is retrieval date. Planned update may refer to capacity or editorial updating; no commissioning or expansion date established.

14 MW
Unspecified power
PUS1 Chinese-language capacity table; updating qualifier
Unknown · unclear
2026-10-07Conflicting claim ↗

Excluded from capacity totals. As-of is retrieval date of undated language version. Same facility and overlapping description; do not add to other claims.

4.8 MW
Unspecified power
Directory fully built-out power for PUS1
Unknown · unclear
2026-10-07Conflicting claim ↗

Excluded from capacity totals. As-of is retrieval date, not capacity effective date. Secondary source lacks clear primary basis and conflicts with operator disclosures.

Development timeline

  1. 2021-04-01 · announcement

    Acquisition agreement announced

    Digital Edge announced agreement to acquire Sejong Telecom’s Centum City cable landing facility alongside a Seoul data center; closing was expected Q2 2021.

    Supporting source ↗
  2. 2021 · actual acquisition reported retrospectively

    Busan asset acquired

    April 2022 operator announcement confirms acquisition of Busan and Seoul sites in 2021; exact closing date unavailable.

    Supporting source ↗
  3. 2024-07 · actual permit reported by secondary source

    PUS1 expansion permission reported

    Sankun reports expansion building permission in July 2024 at U-dong 1453. Original government permit, commencement and completion remain unconfirmed.

    Supporting source ↗

Disclosed specifications

Colocation area

9,463 m²

Operator-reported colocation area; not established land or gross building area.

Source ↗

Cabinets

1,605

Operator disclosure; occupied or commissioned count not specified.

Source ↗

Power distribution

2.2 kVA per cabinet; N+1 static UPS; 100% dual power SLA

Published specifications; kVA is not converted to MW.

Source ↗

Efficiency

Annual PUE 1.5

Operator-reported; measurement period and actual versus design basis unspecified.

Source ↗

Certifications claimed

ISO 9001, ISO 14001, ISO 14064, ISO/IEC 27001, ISO 45001, ISO 50001; SOC 2 Type II; PCI DSS; Tier 3

Operator list; certificate validity and Tier certification scope were not inspected.

Source ↗

Connectivity

Integrated C2C cable landing station and international/domestic interconnection

Operator integration claim corroborated by submarine cable industry source.

Source ↗

Expansion area reported

14,072 m² gross floor area

Secondary report associated with expansion permission; relationship to existing building and final completed total unresolved.

Source ↗

Waste recycling

56% in 2023

Historical operator ESG result, printed page 18.

Source ↗

Public business contacts

sales.kr@digitaledgedc.com; support.kr@digitaledgedc.com

Public facility registry sales and technical contacts; no contact made.

Source ↗

Sources and references

Source attribution does not imply independent verification or permission to reuse images.

Digital Edge PUS1 - Busan - PeeringDB ↗

Published Date unavailable · Retrieved 2026-10-07

Facility record identifies Digital Edge, alias DigitalEdge PUS1, address 32 Centum 7-ro, Haeundae-gu, Busan 48059, KR, and geocode 35.174915,129.127427. Record last updated September 26, 2025.

PUS1 Busan Data Center | Digital Edge ↗

Published Date unavailable · Retrieved 2026-10-07

Facility-specific operator page describes existing interconnection services in Centum City and integrated cable landing station.

Busan Cable Landing Station (Sejong) - Submarine Networks ↗

Published 2011-07-12 · Retrieved 2026-10-07

Updated content links C2C Busan CLS to renamed PUS1, identifies Digital Edge as owner formerly Sejong Telecom, and distinguishes another Busan landing station. Displayed original publication date precedes later acquisition content; update date unavailable.

Digital Edge - Busan PUS1 - Specs ↗

Published Date unavailable · Retrieved 2026-10-07

Directory corroborates address and operator but reports 4.8 MW fully built-out power, another unresolved figure without a dated primary basis.

Digital Edge ESG Report 2024 ↗

Published Date unavailable · Retrieved 2026-10-07

Circular Economy section, printed page 18, reports PUS1 recycled 56% of waste in 2023; this is historical site-specific evidence, not current renewable power evidence.

Profile field evidence

Name: South Korea Data Centers in Seoul and Busan | Digital Edge; PUS1 Busan Data Center | Digital Edge

Aliases: Digital Edge PUS1 - Busan - PeeringDB; Busan Cable Landing Station (Sejong) - Submarine Networks

Kind: PUS1 Busan Data Center | Digital Edge

Country: South Korea Data Centers in Seoul and Busan | Digital Edge; Digital Edge PUS1 - Busan - PeeringDB

Region: Digital Edge PUS1 - Busan - PeeringDB

City: South Korea Data Centers in Seoul and Busan | Digital Edge; Digital Edge PUS1 - Busan - PeeringDB

Metro: Digital Edge to Expand Platform Footprint in South Korea

Address: Digital Edge PUS1 - Busan - PeeringDB; Digital Edge - Busan PUS1 - Specs

Operator: Digital Edge PUS1 - Busan - PeeringDB; PUS1 Busan Data Center | Digital Edge

Owner: Digital Edge announces plans to build South Korea’s largest commercial data center; Busan Cable Landing Station (Sejong) - Submarine Networks

Business Model: South Korea Data Centers in Seoul and Busan | Digital Edge; PUS1 Busan Data Center | Digital Edge

Statuses: PUS1 Busan Data Center | Digital Edge; Digital Edge ESG Report 2024

Summary: South Korea Data Centers in Seoul and Busan | Digital Edge; South Korea - Digital Edge DC (Chinese); Digital Edge announces plans to build South Korea’s largest commercial data center; PUS1 Busan Data Center | Digital Edge; Busan Cable Landing Station (Sejong) - Submarine Networks; 부산 데이터센터 건설 현장 확인·관리하기: 명지동, 대평동, 송정동, 우동

Location: Digital Edge PUS1 - Busan - PeeringDB

Stable identifier: 9b3cb5b8-3397-4731-872c-80fdd406e10b